1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Common Hazardous Waste and Bio-medical Waste Treatment Facility at Harohalli Industrial Area – 2nd Phase, Harohalli Village, Ramanagara District, Karnataka | (b)Name of the Company / Organisation | MARIDI ECO INDUSTRIES PRIVATE LIMITED | (c)Registered Address | Regional Office No. 5,2nd Floor, C.M. Plaza, No.71, 8th Cross, 1st Main, Sampangirama Nagar, Bangalore,,Bangalore Urban,Karnataka-560027 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Sridhar Bommera | (b)Designation (Owner/ Partner/ CEO) | SeniorManager | (c)Address | H. No. 138, C/o. Mohana Krishna, 13th A Cross, 1st Stage, 1st Phase, Gokula Extension, Mathekere, Bangalore,,Bangalore East,Bangalore Urban,Karnataka-560027 | (d)Pin code | 560027 | (e)E-mail | sridhar.maridi@gmail.com | (f)STD Code. | 80(f)Telephone No. | 41512958 | (g)Fax No. | 22103270 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 7(d) Common hazardous waste treatment, storage and disposal facilities (TSDFs)
| Minor Activity | 7(d) Common hazardous waste treatment, storage and disposal facilities (TSDFs)
| (b)Category | A | (c)Proposal Number | IA/KA/MIS/71634/2017 | (d)Master Proposal Number(Single Window) | SW/91680/2019 | (e)EAC concerned (for category A Projects only) | INFRA-2 | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | 312 -A2 & 312 - A2 (P) | (b)Pincode | 562112 | (c)Bounded Latitudes (North) | | From | | Degree | 12.67465 | Minutes | | Second | | From | | Degree | 12.67612 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 77.44036 | Minutes | | Second | | From | | Degree | 77.4413 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | D43X05, D43X06, D43X09, D43X10 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 694 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 2.3 | (j)Seismic Zone | 2 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Karnataka | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Manipur | Imphal East | Sawombung Sub-Division | Laikot | (2.) | Manipur | Ukhrul | Phungyar Phaisat Sub-Division | Thawai and Leingangching | (3.) | Orissa | Jajpur | Sukinda | Sukurangi, Ostapal, Saruabil, Kamarda, Talangi | (4.) | Karnataka | Ramanagara | Kanakapura | | |
|
6. | Details of Terms of Reference (ToR): | (a)Whether TOR is mandatory for submitting application | Yes | (b)MoEF&CC / SEIAA File Number | 10-2/2018-IA-III | (c)Date of Apply of TOR | 16 Dec 2017 | (d)Date of Issue of TOR / Standard ToR | 28 Feb 2018 | (e)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 19 Nov 2018 | Distance of Public Hearing Venue from the Proposed Project : | 0 |
| Project site | State : | Karnataka | District : | Ramanagara | Tehsil : | Kanakapura | Village : | Harohalli |
| 60 | Point wise response to all the issues raised along with action plan has been presented in Table 7.7 of Chapter 7 in the EIA Report (also uploaded as 'additional document'). | Others | Additional Deputy Commissioner and District Magistrate | |
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | Incinerator (Rotary Kiln) | 500 kg/hr | | (2.) | Incinerator (Static Incinerator - 2) | 250 kg/hr | | (3.) | Shredder | 1000 kg/hr | | (4.) | Incinerator (Static Incinerator -1) | 250 kg/hr | | (5.) | Plastic Recycling unit | 5 TPD | | (6.) | Autoclave | 5 TPD | | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Household domestic hazardous waste | 1 | Others | Tons per Day (TPD) | Road | | (2.) | Bio-medical waste | 20 | Others | Tons per Day (TPD) | Road | | (3.) | Hazardous waste | 5 | Others | Tons per Day (TPD) | Road | | (4.) | Non-hazardous commercial waste | 2 | Others | Tons per Day (TPD) | Road | | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 17 Jan 2019 | (iv)Valid Upto | 17 Jan 2019 | (v)File No. | NA | (vi)Application No. | NA | (vii)Copy of Consent to operate valid as on date | NA | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 15 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 4.18 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0.30 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 2 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 1 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 1 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Diesel | 2 | Kilo Litre per Day | | Nearby Market | Road | | 5 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Mar 2018 To 31 May 2018 | (b)Season | Summer | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 10 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM10 | | Micro Gram per Meter Cube | 58.3 | 42.2 | 58.1 | 100 | (2.) | NOx | | Micro Gram per Meter Cube | 25.2 | 15.4 | 24.8 | 80 | (3.) | Others | O3 | Micro Gram per Meter Cube | 23.1 | 11.4 | 22.3 | 100 | (4.) | PM2.5 | | Micro Gram per Meter Cube | 28.5 | 15.7 | 28.5 | 60 | (5.) | SO2 | | Micro Gram per Meter Cube | 18.5 | 9.2 | 18.4 | 80 | |
14.2. No. of Ground Water monitoring locations : 10 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | TDS | | | mg/l | | 1514 | 412 | 500 | 2000 | (2.) | Total Hardness | | | mg/l | | 994 | 134 | 200 | 600 | (3.) | Heavy Metals | | Iron | mg/l | | 0.2 | 0.2 | 0.3 | 0.3 | (4.) | Others | Lead | | mg/l | | 0.01 | 0.01 | 0.01 | 0.01 | (5.) | TSS | | | mg/l | | 0 | 0 | 0 | 0 | (6.) | Chlorides | | | mg/l | | 572 | 92 | 250 | 500 | (7.) | Fluoride | | | mg/l | | 0.75 | 0.31 | 1 | 1.5 | (8.) | pH | | | NA | | 7.9 | 7.2 | 6.5 | 8.5 | |
14.3. No. of Surface Water monitoring locations : 4 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | NA | | 8.2 | 8.1 | A | (2.) | Others | TDS | mg/l | | 762 | 540 | B | (3.) | DO | | mg/l | | 4.6 | 3.5 | C | (4.) | BOD | | mg/l | | 38 | 26 | E | (5.) | COD | | mg/l | | 138 | 104 | E | |
14.4. No. of Ambient Noise monitoring locations : 09 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Night) | A-weighted decibels(dB(A)) | 44.8 | 42.5 | Residential - 55, Commercial - 65, Industrial - 75 | (2.) | Leq(Day) | A-weighted decibels(dB(A)) | 56.6 | 53.5 | Residential - 55, Commercial - 65, Industrial - 75 | |
14.5. No. of Soil Sample Monitored locations : 10 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | K(Potassium) | Kilogram per hectare | | 414 | 179 | (2.) | P(Phosphorus) | Kilogram per hectare | | 36 | 17 | (3.) | N(Nitrogen) | Kilogram per hectare | | 367 | 85 | (4.) | pH | | | 8.8 | 8.2 | (5.) | Electric Conductivity | Others | Microsiemens/cm | 293 | 106 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 10 To 5 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 2 To 5 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | KIADB | 80 | 0 | Not Appliacble | Pipeline | | Others | KIADB Pipeline | Nil | 17 Jan 2019 | 80 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Industry | 262 | 300 | Physical, Chemical Treatment | Reuse within the Plant & Recycling | | 262 | | (2.) | Domestic | 2.4 | 3 | Packaged STP | Green Belt Renewal Plant | | 2.4 | | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 264.4 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 264.4 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Ash from Incinerators | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 730 | Tons | 65 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (2.) | ETP Sludge | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 8100 | Tons | 65 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | NOx | | Microgram per Meter Cube | 24.8 | 0.8 | 9.7 | 34.51 | 80 | (2.) | PM10 | | Microgram per Meter Cube | 58.1 | 0.8 | 1.2 | 59.31 | 100 | (3.) | SO2 | | Microgram per Meter Cube | 18.4 | 0.80 | 4.6 | 23.1 | 80 | (4.) | PM2.5 | | Microgram per Meter Cube | 28.5 | 0.8 | 1.2 | 29.71 | 60 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Incinerator (Static Incinerator - 1) | LDO | 30 | 0.80 | SO2 | | 1.05 | (2.) | Incinerator (Static Incinerator - 1) | LDO | 30 | 0.80 | NOx | | 2.11 | (3.) | Incinerator (Static Incinerator - 2) | LDO | 30 | 0.80 | SO2 | | 1.05 | (4.) | Incinerator (Static Incinerator - 2) | LDO | 30 | 0.80 | NOx | | 2.11 | (5.) | DG Set | HSD | 7 | 0.2 | PM10 | | 0.017 | (6.) | Incinerator (Rotary Kiln) | LDO | 30 | 0.85 | NOx | | 4.08 | (7.) | DG Set | HSD | 7 | 0.2 | SO2 | | 0.014 | (8.) | DG Set | HSD | 7 | 0.2 | NOx | | 0.33 | (9.) | Incinerator (Static Incinerator - 1) | LDO | 30 | 0.80 | PM10 | | 0.26 | (10.) | Incinerator (Static Incinerator - 2) | LDO | 30 | 0.80 | PM10 | | 0.26 | (11.) | Incinerator (Rotary kiln) | LDO | 30 | 0.85 | PM10 | | 0.51 | (12.) | Incinerator (Rotary Kiln) | LDO | 30 | 0.85 | SO2 | | 2.04 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 333 | (b)Source | BESCOM | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 375 KVA | (e)Stack Height (in m) | 7 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 0.98 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 0.98 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 0 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 0.98 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : Other | 0 | Total (ha.) | 0.98 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Green belt | | 0.324 | | (2.) | Main Plant | | 0.42 | | (3.) | Others | Other | 0.236 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Critically Polluted Area | None | 10 | None in 10 km radius | (2.) | ESAs | Bannerghatta National Park | 8.7 | National Park | (3.) | ESZs | Bannerghatta National Park | 8.7 | Distance from project boundary to ESZ | (4.) | Corridors | None | 10 | None in 10 km radius | (5.) | Wildlife Corridors | None | 10 | None in 10 km radius | (6.) | WLS | None | 10 | None in 10 km radius | (7.) | NPA | Bannerghatta National Park | 8.7 | National Park | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | Handigundi RF | 7.9 | Reserve Forest | (2.) | Archaeological Sites | | None | 10 | None in 10 km radius | (3.) | Defence Installations | | None | 10 | None in 10 km radius | (4.) | Others | other | None | 10 | None in 10 km radius | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 0.98 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | Acquired | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Kagalhallidoddi Lake | (ii)Direction of Water Bodies in Buffer Area | South | (iii)Distance of Water Bodies in Buffer Area | 1 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 20 | (b)Permanent Employment-During Operation | 20 | (c)Temporary Employment- During Construction | 10 | (d)Temporary Employment- During Operation | 10 | (e)No. of working days | 365 | (f)Total Manpower | 60 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 0.324 | (b)Percentage of Total Project Area | 33.06 | (c)No. of Plants to be Planted | 130 | (d)Funds Allocated for Plantation | 1200000 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Environmental | The proposed facility will help health care establishments (located in Bengaluru Urban, Bengaluru Rural, Mandya and Ramanagara Districts) dispose of the bio-medical waste generated in their premises in a scientific manner in compliance with the Bio-Medical Waste Management Rules, 2016 and subsequent amendments. The proposed facility will also help industries dispose of their incinerable hazardous waste in a scientific manner at an affordable cost. | (2.) | Social | The proposed facility will provide direct and indirect employment opportunities and is likely to increase the socio-economic status of the nearby villages. Budget allocated under CER activities is Rs. 30 Lakhs (2% of the project cost). | (3.) | Financial | It is very expensive for health care establishments to make their own arrangement (captive facilities) for bio-medical waste treatment and disposal due to the high costs involved in operating individual facilities. The proposed common facility will help health care establishments dispose of their bio-medical waste in a scientific manner, in compliance with applicable Rules, at an affordable cost. | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For INFRA-2 |
|
1. | Details of Building Construction: | (a)Maximum Height of the Building (Meters) | 15 | (b)Total No. of Flats to be Build | 0 | (c)No. of Buildings | 4 | (d)Total plot area (sqm) | 9835 | (e)Total built up area (sqm) | 6560 | |
|
2. | Foreshore Facilities and/or Marine Disposal: | (a)Whether Project Involves Foreshore Activities and/or marine Disposal? | No | |
|
3. | Rain Water Harvesting: | (a)No. of Storage | 4 | (b)Capacity | 130 | (c)No. of Recharge Pits | 0 | (d)Capacity | 0 | |
|
4. | Parking: | (a)Details of 4 Wheeler/ 2 Wheeler Parking | 143 | |
|
5. | Energy Saving Measures: | (a)Source/Mode | LED Bulbs used for street lights,BEE 5 star rated | (b)Percentage | 30 | (c)Quantity | 100 | |
|
|
7. Type of Industries to be established with Industrial Estate as per their category A/B |
---|
S. No. | Type of Industry | No. of Units | Category A/B |
---|
NIL | |
8. | Length of the alignment | N/A | |
|
9. | Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass | Details Not Applicable | |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1518/SA 061 | (ii)Name of the EIA Consultant | Ramky Enviro Services Private Limited | (iii)Address | Ramky Grandiose, Ramky Towers Complex, Gachibowli, Hyderabad | (iv)Mobile No. | 9246782274 | (v)Landline No. | 0402301536 | (vi)Email Id | subash.k@ramky.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | INFRA-2 | (ix)Validity of Accreditation | 20 May 2019 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | Kindly submit point wise issues raised by local residents during public hearing along with submission/action plan of project proponent | 23 Jan 2019 | 2. | NA | The correction have been made as per the instruction received | 24 Jan 2019 | |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | With reference to the additional details sought through minutes of 41st EAC (Infra-2) meeting for Agenda Item No. 41.3.11., we hereby provide the additional details for your kind consideration. | 22 Jul 2020 | 2. | NA | kindly see the minutes of the 41st EAC infra-II held on 27-29 May 2019
| 11 Jun 2019 | 3. | ADS Reply Letter | With reference to the additional details sought through minutes of 39th EAC (Infra-2) meeting for Agenda Item No. 39.5.6., we hereby provide the additional details for your kind consideration. | 25 Apr 2019 | 4. | NA | Kindly see the final minutes of 39th meeting of EAC (Infra-2)
| 05 Apr 2019 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Sridhar Bommera | Designation | SeniorManager | Name of Company (Applicant Name should not be given here) | MARIDI ECO INDUSTRIES PRIVATE LIMITED | Address | Regional Office No. 5,2nd Floor, C.M. Plaza, No.71, 8th Cross, 1st Main, Sampangirama Nagar, Bangalore |
|