Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Gorumahisani Iron Ore Mines
(b)Name of the Company / Organisation MS GHANASHYAM MISRA AND SONS PVT LTD
(c)Registered Address AT-GORUMAHISANI, P.O. GORUMAHISANI, DISTRICT-MAYURBHANJ, ODISHA,,Mayurbhanj,Orissa-757042
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant SOURAV MISRA
(b)Designation (Owner/ Partner/ CEO) DIRECTOR
(c)Address AT-GORUMAHISANI,PO-GORUMAHISANI, DISTRICT-MAYURBHANJ, ODISHA,,Rairangpur,Mayurbhanj,Orissa-757042
(d)Pin code 757042
(e)E-mail mecpl@mail.com
(f)STD Code. 674(f)Telephone No. 2543519
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity1(a) Mining of minerals
Minor Activity1(a) Mining of minerals
(b)Category A
(c)Proposal Number IA/OR/MIN/91592/2008
(d)Master Proposal Number(Single Window) SW/91560/2019
(e)EAC concerned (for category A Projects only) Non-Coal Mining
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Plot No. 146 (P)
(b)Pincode 757042
(c)Bounded Latitudes (North)
From
Degree 22.30335
Minutes
Second
From
Degree 22.34111
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 86.24465
Minutes
Second
From
Degree 86.28935
Minutes
Second
(e)Survey of India Topo Sheet No. 73J/3, 73J/4, 73J/7, 73J/8
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 906
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 17
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Orissa
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-11015/426/2018-IA.II(M)
(b)Date of Apply of TOR 01 Jun 2008
(c)Date of Issue of TOR / Standard ToR 01 Nov 2008
(d)Date of Apply of EC 04 Dec 2006
(e)Date of Issue of EC 29 Jan 2008
(f)Previous TOR Letter Copy of Previous TOR letter
(g)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :01 Oct 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :02 Nov 2018
Distance of Public Hearing Venue from the Proposed Project :0.5
Block Institute of Education and Training (BIET)
State :Orissa
District :Mayurbhanj
Tehsil :Rairangpur
Village :Gorumahisani
4501. Road dust pollution no water sprinkling 2. Paddy fields in the downhill get covered with red murrom soil in the runoff water 3. Constitutional of local environmental committee 4. Peripheral developOthersADM Mayurbhanj
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Bhubaneswar
(iii)Letter No. 101-309/EPE
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Sep 20 2018 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Iron Ore / Mining (Area 349.50 ha)0.750.351.1OthersMTPARoad,Rail
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Mobile Cone Crusher150 TPH300 TPH450 TPH
(2.)Mobile Screening Units1500 TPH01500 TPHNo. of Units = 8 (as per Approved Mining Plan)
(3.)Jaw Crusher150 TPH0150 TPH
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception Copy of Consent to Operate
(iii)Date of Issue 19 Mar 2016
(iv)Valid Upto 31 Mar 2020
(v)File No. 4848/IND-I-CON-250 Consent Order No. 212
(vi)Application No. 439132
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 30
(b) Funds Allocated for Environment Management (Capital) (in Crores) 1.85
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.60
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.48
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel 0
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)HSD240000OthersLitersIOCL, Khunti Depo, Jharkhand, IndiaRoad100 Fuel Supply AgreementCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 05 Mar 2018 To 25 May 2018
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)SO2Micro Gram per Meter Cube11.84.110.280
(2.)NOxMicro Gram per Meter Cube17.89.215.1580
(3.)OthersCOMili Gram per Meter Cube0.320.110.244
(4.)PM10Micro Gram per Meter Cube77.826.273.8100
(5.)PM2.5Micro Gram per Meter Cube51.810.448.460
    14.2.     No. of Ground Water monitoring locations : 4
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Fluoridemg/l0.20.1111.5
(2.)TSSmg/l0000
(3.)Heavy MetalsMagnesiummg/l9.48.630100
(4.)TDSmg/l4321785002000
(5.)pHNA7.127.086.58.5
(6.)Total Hardnessmg/l5644.8300600
(7.)OthersIronmg/l0.180.120.30.3
(8.)Chloridesmg/l12.910.82501000
    14.3.     No. of Surface Water monitoring locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.87.2C
(2.)CODmg/l00C
(3.)OthersTDSmg/l8066C
(4.)BODmg/l1.61.1C
(5.)DOmg/l64.6C
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))53.4136.0870
(2.)Leq(Day)A-weighted decibels(dB(A))61.3641.5975
    14.5.     No. of Soil Sample Monitored locations : 4
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH7.16.7
(2.)P(Phosphorus)Percent0.000480.00032
(3.)K(Potassium)Percent0.190.16
(4.)Electric ConductivityMillisiemens per Centimetre0.000210.000068
(5.)N(Nitrogen)Percent0.060.04
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 5 To 6
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 0 To 3.5
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersGround Water & Surface Water801Copy of Permission LettermodeOthersWater TankerOthersPHD, Borewell & Rainwater Harvesting Ponds21-4(81)/SER/CGWA/2008-172518 Dec 200880
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)0000OthersNA00
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 0
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)OverburdenOthersMining Activity (2018-19, 2019-20)1576462Tons1.5RoadOthersExisting Dumps & Backfilling
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube77.862.280.05100
(2.)PM2.5Microgram per Meter Cube51.8615360
(3.)SO2Microgram per Meter Cube11.860.0011280
(4.)NOxMicrogram per Meter Cube17.8632180
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)NANA00OthersNA0
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 5000
(b)Source NESCO
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 1x15, 2x25, 1x160, 1x250 kVA
(e)Stack Height (in m) 10
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 81
(b)Private Land (ha.) 259
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 9.50
    Total Land (ha.) 349.50
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 65.966
(g)Forest (ha.) 81
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : NA 0
    Total (ha.) 146.966
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)OB Dump Area20.054
(2.)Built Up Area22.852
(3.)Main Plant75.557
(4.)OthersRoads, Mineral (Various Activities)28.503
Total (ha.) 146.966
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)NPANA0NA
(2.)ESAsNA0NA
(3.)ESZsNA0NA
(4.)Wildlife CorridorsNA0NA
(5.)Critically Polluted AreaNA0NA
(6.)CorridorsNA0NA
(7.)WLSNA0NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)OthersRoadsSH-4916From Mine Peripheral
(2.)Archaeological SitesNA0NA
(3.)Defence InstallationsNA0NA
(4.)ForestGourumahisani RF0Within Lease Area
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Yet To Start
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Bankabal Nadi
(ii)Direction of Water Bodies in Buffer Area North West
(iii)Distance of Water Bodies in Buffer Area 6.48
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 102
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 1222
(e)No. of working days 300
(f)Total Manpower 1324
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt22.6333.84256.471999999999994
(2.)Percentage of Total Project Area6.479.6816.15
(3.)No. of Plants2862384604113227
(4.)Funds Allocated178207426650004447074
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialImprovement of Road communication, Skill Development, Education, Health, Drinking Water. Various awareness program to be organised
(2.)FinancialThe mine will contribute to the exchequers of State and Central Government. To meet the growing demand, mines has planned to enhance its production.
(3.)EnvironmentalBy generating awareness program among the villagers, Conservation of water by rainwater harvesting will increase
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Non-Coal Mining
S. No.Item Details
     1.       No. of Mineral(s) to be Mined : 1
S. No.Mineral(s) to be Mined Major or Minor Mineral
(1.)Iron OreMajor
2.
Mine Capacity in ROM (Run of Mine) 0.75 MTPA
3.
Uploaded 500 meters Cluster Certificate from State Mines and Geology in case of minor minerals Copy of 500 meters Cluster Certificate from State Mines and Geology
4.
Mining Plan:
(a)Approval Letter No. MPM/OTFM/09-ORI BHU/2018-19
(b)Date of Approval 04 Jul 2018
(c)Approved Letter Copy of Approved Letter
(d)Approved By State Mining and Geology Department IBM
(e)Approved Mining Lease Area 349.50
(f)Approved Capacity 1100000
5.
Technical Details:
(a)Total Geological Reserves (Million Ton) 18.007
(b)Mineable Reserves (Million Ton) 13.626
(c)Extractable Reserves(Million Ton) 2.2
(d)Percent(%) of Extraction 75.67
(e)Grade of Coal /Ore /Mineral Fe > 58 %
(f)Stripping Ratio 1 : 1.04
(g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) NA
(h)Average Gradient(Degree) 37
(i)Mining Method Opencast
(j)Life of Mine (Years) 2018-19, 2019-20 (2 Years) Till Lease Period
6.
Details of Beneficiations:
(a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area No
(b)Whether it is proposed to install crusher within the mining lease area No
7.
Details of Seams:
(a)Whether details of seam applicable No
8.
Details of Mining Lease:
(a)Mining Lease Area (in Hectare) 349.50
(b)Whether obtained Letter of Intent (LOI) from the state government ? Yes
(i)Copy of Letter of Intent Copy of Letter of Intent
(ii)Date of issue of LOI 16 Mar 2017
(iii)Validity of LOI 50
(iv)Reference No. of LOI 2297/SM/BHUBNESHWAR III(A) SM-06/2014
(c)Whether Lease Deed Executed ? Yes
(i)Copy of Executed Lease deed valid as on Date Copy of Executed Lease deed
(ii)Provide area in Hectare as per executed lease deed (initial) document 349.50
(iii)Validity of the lease deed From : 07 Jan 1970 To : 31 Mar 2020
(iv)Date of Execution of Mining Lese 14 Jun 2017
(v)Reference Number 11271700263
(d)Whether Lease Deed Renewed ? No
(i)Reason thereof Lease Valid upto 50 years
9.
OB (Over Burden) Management:
(a) Details of External Dumps:
(i)No. of OB Dumps 0
(ii)Total Area (in Hectare) 0
(iii)Height (in meter) 0
(iv)Quantity (in Million Cubic meter) 0
(v)No. of year back fill up 0
(b) Details of Internal Dumps:
(i)No. of Internal Dumps 18
(ii)Total Area (in Hectare) 12.35
(iii)Height (in meter) 26
(iv)Quantity (in Million Cubic meter) 0.773
10.
Details of Topsoil Management:
(a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) 0
(b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) 0
(c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) 0
11.
Details of Final Mine Void:
(a)Area (in Hectare) 7.12
(b)Depth (in meter) 52
(c)Volume (in Million Cubic meter) 0.698
12.
Details of Quarry:
(a)Final Void of 0 (hectare) at a Depth of 0 meter which is Proposed to be Converted into a Water Body.
(b)Total Quarry Area (ha) 92.190
13.
Details of Transportation:
(a)In Pit/Underground to Surface Through Dumpers (10T - 30T)
(b)Surface to Siding/Loading Through Dumpers (10T - 30T)
(c)Transportation / Conveyor Details Transportation by Road through Dumpers
     14.      Details of Land Usage (Pre-Mining)
S. No.LAND USE Other LAND USEWITHIN ML AREA (Hectare)OUTSIDE ML AREA (Hectare)TOTAL (Hectare)
(1.)WASTE LAND000
(2.)SETTLEMENTS000
(3.)SURFACE WATER BODIES000
(4.)AGRICULTURE LAND000
(5.)FOREST LAND90.50090.5
(6.)GRAZING LAND000
(7.)OTHERS(Specify)Non Forest Revenue land259.00259
TOTAL349.50349.5
     15.      Details of Land Usage (Post-Mining)
S. No.LAND USE Other LAND USEPlantation (ha)Water Body (ha)Public Use (ha)Undisturbed (ha)Total
(1.)EXCAVATION/QUARRY92.1900092.19
(2.)EXTERNAL OB DUMPS0000
(3.)ROADS0.640012.31412.954
(4.)BUILT UP AREA (COLONY/OFFICE)2.28020.57222.852
(5.)GREEN BELT0000
(6.)OtherPlantation and Mining allied activities14.4340014.434
(7.)VIRGIN AREA00187.015187.015
(8.)INTERNAL OB DUMPS20.0540020.054
(9.)TOP SOIL STORAGE0000
TOTAL129.5980219.9010349.499
16.
Details of Reclamation:
Total Afforestation Plan shall be Implemented Covering of Mining.
This will Include:
(a)External OB Dump(in hectare) 0
(b)Internal Dump(in hectare) 12.35
(c)Quarry(in hectare) 92.190
(d)Safety Zone(in hectare) 9.50
(e)Final Void of 0 (hectare) at a Depth of 0 meter which is Proposed to be Converted into a Water Body.
(f)Density of Tree Plantation per ha (in no.) 2500
(g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) 13.13
(h)Total afforestation plant (in hectare) 22.63
17.
Status of progressive Mining Closure Plan:
Copy of Implementation of Various Activities as per Approved Progressive Mine Closure Plan Copy of Implementation of Various Activities as per Approved Progressive Mine Closure Plan
Any Deviation from the Approved Progressive Mine Closure Plan No
Total Area Excavated (in hectare) 92.190
Total Area Backfilled after Excavation (in hectare) 7.72
Total Area Reclaimed (in hectare) 32.75
     18.      Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception:
S. No.Financial Year Sanctioned Capacity as per EC (MTPA)Sanctioned Capacity as per CTOSanctioned Capacity as per approved mining planActual Production Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA)
(1.)197000000
(2.)197100000
(3.)197200000
(4.)1976000225858.262225858.262
(5.)1978000301695.543301695.543
(6.)1979000171158.640171158.640
(7.)1980000244254.840244254.840
(8.)198100099395.22599395.225
(9.)1983000134866.330134866.330
(10.)1984000141832.200141832.200
(11.)1985000145762.040145762.040
(12.)1986000144041.950144041.950
(13.)1987000125610.260125610.260
(14.)1988000144302.390144302.390
(15.)1992000100975.740100975.740
(16.)1997014000014000099293.93040706.07
(17.)2000014000014000074654.20065345.8
(18.)2002014000014000074529.15065470.85
(19.)20030140000140000106793.80033206.2
(20.)20040140000140000103103.0036897
(21.)20050140000140000110694.95029305.05
(22.)1989000118925.530118925.530
(23.)199000026524.75026524.750
(24.)199100000
(25.)20070140000750000139902.6300
(26.)2010750000750000750000275219.5100
(27.)2011750000750000750000293045.4850
(28.)2012750000750000750000417976.9410
(29.)2013750000750000750000461741.4900
(30.)2017750000750000750000738009.5800
(31.)20187500007500001100000615952.9000
(32.)2001014000014000022027.400117972.6
(33.)1998014000014000043696.87096303.13
(34.)1982000111512.240111512.240
(35.)1993000241.920241.920
(36.)199600076852.85076852.850
(37.)2006014000014000059717.87080282.13
(38.)2009750000750000750000151960.8000
(39.)2014750000750000750000569811.8000
(40.)197300000
(41.)19740007576.2007576.200
(42.)1977000295325.073295325.073
(43.)19940008984.3408984.340
(44.)2008750000750000750000140292.3200
(45.)2016750000750000750000259078.4600
(46.)1975000191799.347191799.347
(47.)199500066949.13066949.130
(48.)1999014000014000063563.99076436.01
(49.)2015750000750000750000663039.8100
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? Yes
(b)Name of the Court High Courts
(c)Name of the Sub Court Orissa
(d)Case No. 2(C) CC No. 05 of 2013
(e)Orders/Directions of the court ,if any and its relevance with the proposed project Stay order granted by Hon’ble High Court, dated 17
(f)Case Details under section 5 of the EP Act, due production with
(g)Uploaded Court Order Copy of Court Order
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1720/RA0090
(ii)Name of the EIA Consultant Visiontek Consultancy Services Pvt. Ltd.
(iii)Address Plot No. M-22 & 23, Chandaka Industrial Estate, Bhubaneswar-751024, Dist- Khurda, Odisha
(iv)Mobile No. 9338822732
(v)Landline No. 0674645178
(vi)Email Id visiontekin@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Non-Coal Mining
(ix)Validity of Accreditation 13 Mar 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NA(i) Details of TOR /EC has not uploaded as S. no. 6 of Form 2. (ii) Details of Public consultation has not uploaded as S. No. 7. (iii) Details of Public Hearing advertisement in two news paper has not uploaded. (iv) Copy of CTO is not legible. (v) Copy of approved mine plan has not uploaded. (vi) Details of past production of mine since its inception, duly authenticated by Department of Mines & Geology, State Government. (vii) Details of Court cases not uploaded. (viii) Upload approval letter of Wildlife Management Plan. 21 Feb 2019
2.NAThe correction have been made as per the instruction received 05 Mar 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantSOURAV MISRA
DesignationDIRECTOR
Name of Company (Applicant Name should not be given here)MS GHANASHYAM MISRA AND SONS PVT LTD
AddressAT-GORUMAHISANI, P.O. GORUMAHISANI, DISTRICT-MAYURBHANJ, ODISHA