Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Expansion of “Commercial Complex SELECT CITY WALK (SHOPPING MALL)”
(b)Name of the Company / Organisation SELECT INFRASTRUCTURE PRIVATE LIMITED
(c)Registered Address Select Citywalk, A-3 District Centre, Saket,,South,Delhi-110017
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Shashi Sharma
(b)Designation (Owner/ Partner/ CEO) SeniorVicePresidentEnggandOpps
(c)Address Select Citywalk, A-3, District Centre, Saket,,Hauz Khas,South,Delhi-110017
(d)Pin code 110017
(e)E-mail shashis@selectcitywalk.com
(f)STD Code. 11(f)Telephone No. 42114238
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity8(a) Building and Construction projects
Minor Activity
(b)Category B2
   Reason for Applying at Ministry SEIAA
(c)Proposal Number IA/DL/MIS/91578/2006
(d)Master Proposal Number(Single Window) SW/91577/2019
(e)EAC concerned (for category A Projects only) INFRA-2
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Plot A3 & P1B
(b)Pincode 110017
(c)Bounded Latitudes (North)
From
Degree 3157697.20
Minutes
Second
From
Degree 3157903.36
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 717057.52
Minutes
Second
From
Degree 717213.33
Minutes
Second
(e)Survey of India Topo Sheet No. 53 H/02
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 688
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 8.19
(j)Seismic Zone 4
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Delhi
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)ManipurImphal EastSawombung Sub-DivisionLaikot
(2.)ManipurUkhrulUkhrul Central Sub-DivisionZalenbung to Hatha
(3.)ManipurUkhrulPhungyar Phaisat Sub-DivisionThawai and Leingangching
(4.)OrissaJajpurSukindaSukurangi, Ostapal, Saruabil, Kamarda, Talangi
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number 21-45/2019-IA-III
(c)Date of Issue of TOR 08 Dec 2006
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 15 May 2019
(c)Date of Issue of EC 01 Nov 2019
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason As per EIA Notification, 2006, all building constr
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Lucknow
(iii)Letter No. 4-251/2007-RO(NZ)/111
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit May 2 2019 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)built-up area107671.515032.74112704.25Otherssquare meterOthersNot Applicable
(2.)Plot area24174.66024174.66Otherssquare meterOthersNot Applicable
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)No of towers404
(2.)No of shops18330213
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 04 May 2018
(iv)Valid Upto 06 Dec 2022
(v)File No. DPCC/CMC/2018/43211
(vi)Application No. DPCC/CMC/2018/43211
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 32
(b) Funds Allocated for Environment Management (Capital) (in Crores) 3.184
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.32
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 3.518
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel 0
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Not Applicable0Others00Othersnot applicable0 OthersRaw Material_MOUCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 18 Dec 2018 To 20 Dec 2018
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 2
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube223.4205.1221.3100
(2.)PM2.5Micro Gram per Meter Cube139.5122.4135.660
(3.)SO2Micro Gram per Meter Cube7.46.17.280
(4.)NOxMicro Gram per Meter Cube41.131.739.280
    14.2.     No. of Ground Water monitoring locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TDSmg/l453.3453.3500500
(2.)Fluoridemg/l0.290.2911
(3.)Heavy MetalsLeadmg/l000.010.01
(4.)Chloridesmg/l110110250250
(5.)pHNA7.67.68.58.5
(6.)TSSNA0000
(7.)Total Hardnessmg/l244244200200
    14.3.     No. of Surface Water monitoring locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.27.2E
(2.)DOmg/l33E
(3.)BODmg/l2020E
(4.)CODmg/l6464E
    14.4.     No. of Ambient Noise monitoring locations : 1
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))52.352.355
(2.)Leq(Day)A-weighted decibels(dB(A))58.358.365
    14.5.     No. of Soil Sample Monitored locations : 1
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH7.27.2
(2.)N(Nitrogen)Milligram per Kilogram47.647.6
(3.)P(Phosphorus)Milligram per Kilogram13.413.4
(4.)Electric ConductivityOthersMicro Seimen's per centimeter429.5429.5
(5.)K(Potassium)Milligram per Kilogram13.413.4
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 2.40 To 53.17
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.69 To 54.02
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersSaket Place Developers Association6220 Not Appliacble PipelineOthersSaket Place Developers AssociateF4(887) 52/ EE(P) W III/10/49429 Nov 2010423
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)HVAC Cooling, Food Court221300STPReuse within the Plant & Recycling,Green Belt Renewal Plant,Others22 KLD Losses19922
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 221
(b)Total Discharged Water (Kilolitre per Day) 22
(c)Total Reused Water (Kilolitre per Day) 199
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Used OilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.74Kilolitre0.1RoadAuthorized Recyclers
(2.)Electronic WasteE Waste1.095Tons0.1RoadAuthorized Recyclers
(3.)Municipal Solid Waste (Non Biodegradable)Municipal Solid Waste177.755Tons0.1RoadAuthorized Recyclers
(4.)Plastic WastePlastic Waste177.755Tons0.1RoadAuthorized Recyclers
(5.)Municipal Solid Waste (Biodegradable)Municipal Solid Waste237.25Tons0OthersOrganic Waste Converter is installed within siteOthersOrganic Waste Converter
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube222.350.91.05223.41100
(2.)NOxMicrogram per Meter Cube40.150.92.1542.3180
(3.)PM2.5Microgram per Meter Cube137.5000.90.851138.35260
(4.)SO2Microgram per Meter Cube7.30.90.7018.001180
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG set of 3x2000 kVALow sulphur diesel fuel440.40PM100.051
(2.)DG set of 3x2000 kVALow sulphur diesel fuel440.40NOx0.114
(3.)DG set of 3x2000 kVALow sulphur diesel fuel440.40OthersPM2.50.035
(4.)DG set of 2x1010 kVALow sulphur diesel fuel440.40PM100.032
(5.)DG set of 2x1010 kVALow sulphur diesel fuel440.40NOx0.084
(6.)DG set of 2x1010 kVALow sulphur diesel fuel440.40OthersPM2.50.023
(7.)DG set of 3x2000 kVALow sulphur diesel fuel440.40SO20.082
(8.)DG set of 2x1010 kVALow sulphur diesel fuel440.40SO20.074
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 6340
(b)Source BSES
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 3 x 2000 kVA and 2 x 1010 kVA
(e)Stack Height (in m) 44
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 2.4174
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 2.4174
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Plot area 2.4174
    Total (ha.) 2.4174
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Built Up Area11.2704253
Total (ha.) 11.2704253
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSOkhla Bird Sanctuary9.83North East East direction from project site
(2.)NPANone0None
(3.)ESZsNone0None
(4.)Critically Polluted AreaOkhla Industrial Area5.18North East East direction from project site
(5.)CorridorsNone0None
(6.)Wildlife CorridorsNone0None
(7.)ESAsNone0None
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesKhirki Masjid0.29North North East direction from project site
(2.)Defence InstallationsArjangarh Air Force Station10.62South East direction from project site
(3.)ForestCentral Ridge Reserve Forest9.06North North West direction from project site
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 2.4174
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired NA
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 1121
(c)Temporary Employment- During Construction 150
(d)Temporary Employment- During Operation 0
(e)No. of working days 365
(f)Total Manpower 1271
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt0.82901600.829016
(2.)Percentage of Total Project Area34.30034.3
(3.)No. of Plants179601796
(4.)Funds Allocated1.870.051.9200000000000002
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalTotal plantation area for the project of 8290. 16 m2 (34.30% of plot area) has already been provided in the complex
(2.)SocialIt will increase employment opportunities for people of nearby area
(3.)FinancialRevenue generation through taxes
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For INFRA-2
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 38
(b)Total No. of Flats to be Build 0
(c)No. of Buildings 4
(d)Total plot area (sqm) 24174.66
(e)Total built up area (sqm) 112704.253
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 0
(b)Capacity 0
(c)No. of Recharge Pits 15
(d)Capacity 225
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking 1187 ECS
5.
Energy Saving Measures:
(a)Source/Mode LED lights, chillers and solar panel
(b)Percentage 1
(c)Quantity 63.4
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area No impact
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. Rev 72/ 17th Dec, 2018 at S.No. 117
(ii)Name of the EIA Consultant Perfact Enviro Solutions Pvt. Ltd.
(iii)Address 5th floor, NN Mall, Mangalam Palace Sector 3, Rohini, New Delhi
(iv)Mobile No. 9818362330
(v)Landline No. 0114928136
(vi)Email Id info@perfactgroup.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation INFRA-2
(ix)Validity of Accreditation 27 May 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAThis is an Expansion project. Kindly provide Certified Compliance Report issued by the MoEF&CC, Regional Office or concerned regional office of Central Pollution Control Board or the Member Secretary of the respective State Pollution Control Board for the conditions stipulated in the Environmental Clearance granted for the existing project. 23 Jan 2019
2.NAThe correction have been made as per the instruction received 15 May 2019
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterNA 31 Jul 2019
2.NA

Kindly see the final Minutes of the 42nd EAC (Infra-2) metting held during 10-12 July, 2019

26 Jul 2019
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantShashi Sharma
DesignationSeniorVicePresidentEnggandOpps
Name of Company (Applicant Name should not be given here)SELECT INFRASTRUCTURE PRIVATE LIMITED
AddressSelect Citywalk, A-3 District Centre, Saket
Print