Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Marki-Mangli Coal Block-III mine
(b)Name of the Company / Organisation B S ISPAT LIMITED
(c)Registered Address Kh. No. 97, 101, 190, Village Salori Yensa, Post Chinor, Taluka Warora, District Chandrapur, M.S.,,Chandrapur,Maharashtra-442914
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Bhawani Prasad Mishra
(b)Designation (Owner/ Partner/ CEO) ManagingDirector
(c)Address Khasra No. 97, 101, 190, Village Salori Yensa, Post Chinora, Taluka Warora, District Chandrapur, M.S.,,Warora,Chandrapur,Maharashtra-442914
(d)Pin code 442914
(e)E-mail bp.misra@bsilindia.com
(f)STD Code. 22(f)Telephone No. 39167386
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity1(a) Mining of minerals
Minor Activity1(a) Mining of minerals
(b)Category A
(c)Proposal Number IA/MH/CMIN/31533/2015
(d)Master Proposal Number(Single Window) SW/91479/2019
(e)EAC concerned (for category A Projects only) Coal Mining
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. List attached
(b)Pincode 445304
(c)Bounded Latitudes (North)
From
Degree 19.799766
Minutes
Second
From
Degree 19.830188
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 78.782123
Minutes
Second
From
Degree 78.844844
Minutes
Second
(e)Survey of India Topo Sheet No. 56 I/13
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 226
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 5
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Maharashtra
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)MaharashtraYavatmalZari-Jamani
(2.)MaharashtraYavatmalZari-Jamani
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number J-11015/425/2007-IA-II(M)
(b)Date of Apply of TOR 06 Oct 2015
(c)Date of Issue of TOR / Standard ToR 01 Feb 2016
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :29 Sep 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :03 Nov 2018
Distance of Public Hearing Venue from the Proposed Project :0
Project Site
State :Maharashtra
District :Yavatmal
Tehsil :Zari-Jamani
Village :Mukutban
600Pollution control measures, Employment, Cost of the land etc.OthersAdditional District Magistrate
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Explosive magazine5 tonneAs per aproved MP
(2.)Mining project with necessary site services-As per approved Mining Plan
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Coal Mining (275 Ha ML and 07 Ha for road / nala diversion)210000Tons per AnnumRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 147.1
(b) Funds Allocated for Environment Management (Capital) (in Crores) 8.46
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 2.942
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.45
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 144
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 144
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Diesel4320Otherskiloliter per annumNearby fuel stationRoad3 OthersPurchase as per requirementCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 06 Mar 2016 To 03 Jun 2016
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 9
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube54.742.254.3100
(2.)NOxMicro Gram per Meter Cube25.916.725.9100
(3.)PM2.5Micro Gram per Meter Cube29.719.529.460
(4.)SO2Micro Gram per Meter Cube19.412.418.5100
    14.2.     No. of Ground Water monitoring locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA8.37.26.58.5
(2.)Total Hardnessmg/l376320200600
(3.)Chloridesmg/l12959.62501000
(4.)Fluoridemg/l10.211.5
(5.)Heavy MetalsArsenicmg/l000.010.05
(6.)TDSmg/l9915965002000
(7.)TSSmg/l4100
    14.3.     No. of Surface Water monitoring locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l6.56.4C
(2.)BODmg/l7.37.0C
(3.)pHNA8.57.9C
(4.)CODmg/l2713C
    14.4.     No. of Ambient Noise monitoring locations : 9
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))53.841.755
(2.)Leq(Night)A-weighted decibels(dB(A))47.738.845
    14.5.     No. of Soil Sample Monitored locations : 3
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)P(Phosphorus)Kilogram per hectare124.729.5
(2.)Electric ConductivityOthersMicro-second per cm20075
(3.)K(Potassium)Kilogram per hectare266.5122.5
(4.)pH8.257.96
(5.)N(Nitrogen)Kilogram per hectare793.3326.7
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 15.1 To 4.4
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.5 To 10.6
(c)Whether Ground Water Intersection will be there ? Yes
(d)Upload Copy of Central Ground Water Authority Letter Copy of Central Ground Water Authority Letter
(e)Letter No. NOC awaited hence copy of application attached
(f)Date of Issue 20 Jun 2016
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater26780.5Copy of Permission LetterPipelineOthersMine water & Tubewell waterNOC awaited hence copy of application attached20 Jun 20162678
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic Water1015STPGreen Belt Renewal Plant10
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 10
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 10
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)OverburdenOthersOverburden2239111Tons1RoadOthersConcurrent backfilling
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube54.121.4156.11100
(2.)PM2.5Microgram per Meter Cube29.720.0929.860
(3.)SO2Microgram per Meter Cube19.40.10.0219.4280
(4.)NOxMicrogram per Meter Cube25.90.10.0425.9480
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)NANA00OthersNANA
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 100
(b)Source MSEGCL
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 1
(e)Stack Height (in m) 0
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 262.5
(c)Government Land (ha.) 19.5
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 282
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 90
(b)Waste/Barren Land (ha.) 19.5
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 10
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Private land 162.5
    Total (ha.) 282
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant0-
(2.)Township0-
(3.)Ash Pond0-
(4.)OB Dump Area2013 Ha for external dump and 7 Ha for soil dump
(5.)Safety Zone7-
(6.)Tailing Pond0-
(7.)Desalination Plant0-
(8.)Built Up Area15.5-
(9.)Quarry Area12859 Ha Void and 69 Ha back filled
(10.)Green belt111.5By rounding off in available format
Total (ha.) 282
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted Areanone0Not within 15 Km radius
(2.)NPAnone0Not within 15 Km radius
(3.)ESAsnone0Not within 15 Km radius
(4.)ESZsnone0Not within 15 Km radius
(5.)Wildlife Corridorsnone0Not within 15 Km radius
(6.)WLSTipeshwar wildlife sanctuary30more than 15 km radius
(7.)Corridorsnone0Not within 15 Km radius
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNone0Not within 15 Km radius
(2.)OthersInterstate BoundaryMaharashtra Telangana Border6Maharashtra Telangana Border
(3.)Defence InstallationsNone0Not within 15 Km radius
(4.)ForestReserved forest0.5Besides this there are 7 RF within buffer zone
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) Not Applicable
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 62.42
(b)Land yet to be acquired(Ha) 219.58
(c)Status of Land acquisition if not acquired Under process
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Yet To Start
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Peacock, Panther, Slothbear
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Water logged mined out pit will be reclaimed and seasonal nala
(b)Whether there is Diversion Required ? Yes
(i)Details of Diversion Required Seasonal nala
(ii)Details of Study Conducted Yes
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Penganga River
(ii)Direction of Water Bodies in Buffer Area South
(iii)Distance of Water Bodies in Buffer Area 5
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 288
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 300
(f)Total Manpower 288
32.
Green Belt in Ha:
(a)Total Area of Green Belt 204
(b)Percentage of Total Project Area 72.34
(c)No. of Plants to be Planted 408000
(d)Funds Allocated for Plantation 17500000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalImproving green belt, backfilling of existing pit /OB and its reclaimation.
(2.)SocialDirect employment to 288 eligible persons preferable local persons besides creating indirect employment opportunities. Various CSR/CER activities in adjoining villages will help in improving social status.
(3.)FinancialCapital cost of 147.10 crores improves 8.46 Cr for environmental protection, 0.9087 Cr as capital cost of CSR activities and 0.136 Cr as recurring CSR cost. The project will contribute to state through various taxes.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Coal Mining
S. No.Item Details
     1.       No. of Mineral(s) to be Mined : 1
S. No.Mineral(s) to be Mined Major or Minor Mineral
(1.)CoalMajor
2.
Mine Capacity in ROM (Run of Mine) 210000
3.
Uploaded 500 meters Cluster Certificate from State Mines and Geology in case of minor minerals Copy of 500 meters Cluster Certificate from State Mines and Geology
4.
Mining Plan:
(a)Approval Letter No. CPAM – 34011/38/2017
(b)Date of Approval 10 Apr 2018
(c)Approved Letter Copy of Approved Letter
(d)Approved By State Mining and Geology Department Coal
(e)Approved Mining Lease Area 275
(f)Approved Capacity 210000
5.
Technical Details:
(a)Total Geological Reserves (Million Ton) 6.19
(b)Mineable Reserves (Million Ton) 4.42
(c)Extractable Reserves(Million Ton) 3.65
(d)Percent(%) of Extraction 58.96
(e)Grade of Coal /Ore /Mineral D to E
(f)Stripping Ratio 1 : 6.9
(g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) Non gaseous
(h)Average Gradient(Degree) 7.5 to 8
(i)Mining Method Opencast
(j)Life of Mine (Years) 18
6.
Details of Beneficiations:
(a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area No
(b)Whether it is proposed to install crusher within the mining lease area No
7.
Details of Seams:
(a)Whether details of seam applicable Yes
(b)No. of seams 1
(c)Thickness of seams to be worked on 3.05
(d)Maximum Thickness of Seams (metres) 5.1
8.
Details of Mining Lease:
(a)Mining Lease Area (in Hectare) 275
(b)Whether obtained Letter of Intent (LOI) from the state government ? Yes
(i)Copy of Letter of Intent Copy of Letter of Intent
(ii)Date of issue of LOI 23 Sep 2015
(iii)Validity of LOI 20
(iv)Reference No. of LOI MMN-0615/C.R.62/IND-9
(c)Whether Lease Deed Executed ? No
(i)Reason thereof Environment Clearance awaited
(d)Whether Lease Deed Renewed ? No
(i)Reason thereof Lease yet to be executed
9.
OB (Over Burden) Management:
(a) Details of External Dumps:
(i)No. of OB Dumps
(ii)Total Area (in Hectare)
(iii)Height (in meter)
(iv)Quantity (in Million Cubic meter)
(v)No. of year back fill up
(b) Details of Internal Dumps:
(i)No. of Internal Dumps
(ii)Total Area (in Hectare)
(iii)Height (in meter)
(iv)Quantity (in Million Cubic meter)
10.
Details of Topsoil Management:
(a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) 3
(b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) 3
(c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) 0
11.
Details of Final Mine Void:
(a)Area (in Hectare)
(b)Depth (in meter)
(c)Volume (in Million Cubic meter)
12.
Details of Quarry:
(a)Final Void of 59 (hectare) at a Depth of 60 meter which is Proposed to be Converted into a Water Body.
(b)Total Quarry Area (ha) 128
13.
Details of Transportation:
(a)In Pit/Underground to Surface Haul road
(b)Surface to Siding/Loading Road transport
(c)Transportation / Conveyor Details Road transport
     14.      Details of Land Usage (Pre-Mining)
S. No.LAND USE Other LAND USEWITHIN ML AREA (Hectare)OUTSIDE ML AREA (Hectare)TOTAL (Hectare)
(1.)FOREST LAND000
(2.)GRAZING LAND000
(3.)OTHERS(Specify)Excavated, Infrastructure, Dumps, Undisturbed162.50162.5
(4.)AGRICULTURE LAND90090
(5.)WASTE LAND19.5019.5
(6.)SURFACE WATER BODIES000
(7.)SETTLEMENTS10010
TOTAL2820282
     15.      Details of Land Usage (Post-Mining)
S. No.LAND USE Other LAND USEPlantation (ha)Water Body (ha)Public Use (ha)Undisturbed (ha)Total
(1.)EXCAVATION/QUARRY69590128
(2.)TOP SOIL STORAGE7007
(3.)INTERNAL OB DUMPS690069
(4.)BUILT UP AREA (COLONY/OFFICE)0000
(5.)OtherInfrastructure and Populated area1101425
(6.)VIRGIN AREA0000
(7.)ROADS0055
(8.)GREEN BELT350035
(9.)EXTERNAL OB DUMPS130013
TOTAL20459190282
16.
Details of Reclamation:
Total Afforestation Plan shall be Implemented Covering of Mining.
This will Include:
(a)External OB Dump(in hectare) 20
(b)Internal Dump(in hectare) 69
(c)Quarry(in hectare) 128
(d)Safety Zone(in hectare) 7
(e)Final Void of 59 (hectare) at a Depth of 60 meter which is Proposed to be Converted into a Water Body.
(f)Density of Tree Plantation per ha (in no.) 2000
(g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) 19
(h)Total afforestation plant (in hectare) 204
17.
Status of progressive Mining Closure Plan:
Details Not Applicable
     18.      Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception:
S. No.Financial Year Sanctioned Capacity as per EC (MTPA)Sanctioned Capacity as per CTOSanctioned Capacity as per approved mining planActual Production Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA)
(1.)201900000
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1720/RA 0105
(ii)Name of the EIA Consultant Srushri Seva Private Limited
(iii)Address Harihar Niwas, Giripeth, Near Adiwasi Bhavan, Nagpur
(iv)Mobile No. 9422108095
(v)Landline No. 2542426
(vi)Email Id srspl15@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Coal Mining
(ix)Validity of Accreditation 15 May 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantBhawani Prasad Mishra
DesignationManagingDirector
Name of Company (Applicant Name should not be given here)B S ISPAT LIMITED
AddressKh. No. 97, 101, 190, Village Salori Yensa, Post Chinor, Taluka Warora, District Chandrapur, M.S.