Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Expansion of Sukurangi Chromite Ore Mining Project
(b)Name of the Company / Organisation ODISHA MINING CORPORATION LIMITED
(c)Registered Address Odisha Mining Corporation Limited OMC House, Post Box No.: 34, Bhubaneswar,,Khordha,Orissa-751001
(d)Legal Status of the Company Central PSU
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Suman Krishna Sit
(b)Designation (Owner/ Partner/ CEO) GENERAL MANAGER (GEO)
(c)Address Odisha Mining Corporation Limited OMC House, Post Box No.: 34, Bhubaneswar - 751 001, Dist.: Khurda, Odisha,,,Khordha,Orissa-751001
(d)Pin code 751001
(e)E-mail envcl.omc@gmail.com
(f)STD Code. 674(f)Telephone No. 2377458
(g)Fax No. 06742377458
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity1(a) Mining of minerals
Minor Activity
(b)Category A
(c)Proposal Number IA/OR/MIN/8903/2007
(d)Master Proposal Number(Single Window) SW/91473/2019
(e)EAC concerned (for category A Projects only) Non-Coal Mining
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Plot details given in Form 1
(b)Pincode 755018
(c)Bounded Latitudes (North)
From
Degree 21.005236
Minutes
Second
From
Degree 21.06305
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 85.795492
Minutes
Second
From
Degree 85.822706
Minutes
Second
(e)Survey of India Topo Sheet No. 73 G/16
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 5
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Orissa
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-11015/409/2008-IA.II(M)
(c)Date of Issue of TOR 22 Dec 2008
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 06 Nov 2009
(c)Date of Issue of EC 18 Feb 2010
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :06 Oct 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :09 Nov 2018
Distance of Public Hearing Venue from the Proposed Project :2
Community Centre of OMC, Kaliapani (Khata No. 55, Plot No. 736, Patharabani, Kalapani)
State :Orissa
District :Jajpur
Tehsil :Sukinda
Village :Kaliapani
1291. Employment opportunities 2. Skill development measures 3. Pollution control and plantation 4. Public Health & Sanitation 5. Education facilities 6. Peripheral DevelopmentOthersADM, Jajpur
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Bhubaneswar
(iii)Letter No. 101-280/07/EPE-24
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Mar 2 2019 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Chromite Opencast Mining Project130000170000300000Tons per Annum(TPA)Road,Rail
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Fully-mechanised Opencast (FMOC) miningFMOC mining with production capacity - 0.13 MTPAFMOC mining with enhancement of another 0.17 MTPAFMOC mining with production capacity - 0.30 MTPA
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception Copy of Consent to Operate
(iii)Date of Issue 16 Mar 2016
(iv)Valid Upto 31 Mar 2020
(v)File No. 4552/IND-I-CON-388
(vi)Application No. 436922
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 32.02
(b) Funds Allocated for Environment Management (Capital) (in Crores) 21.30
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.32
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.44
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 5
(b)Existing quantity of raw material/fuel 2
(c)Total quantity of raw material/fuel 7
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)HSD8.89Kilo Litre per DayIOCLRoad2 Fuel Supply AgreementCopy of Linkage
(2.)EXPLOSIVE7OthersTPDMagazine OMCRoad13 OthersLICENCECopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Dec 2015 To 29 Feb 2016
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 9
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube975284.23100
(2.)PM2.5Micro Gram per Meter Cube431637.2360
(3.)SO2Micro Gram per Meter Cube9.14.07.880
(4.)NOxMicro Gram per Meter Cube27.512.62280
    14.2.     No. of Ground Water monitoring locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.46.66.58.5
(2.)TDSmg/l282805002000
(3.)Fluoridemg/l0.260.01211.5
(4.)Heavy MetalsCoppermg/l0.0110.0110.051.5
(5.)Otherstotal alkalinitymg/l18428200600
(6.)Chloridesmg/l1252501000
(7.)Total Hardnessmg/l19636200600
(8.)TSSNA0000
    14.3.     No. of Surface Water monitoring locations : 4
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l7.46.5A
(2.)BODmg/l31C
(3.)OthersTotal coliform organismOthersMPN/ 100ml48040B
(4.)pHNA7.497.2A
(5.)CODNA00A
    14.4.     No. of Ambient Noise monitoring locations : 9
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))59.342.575
(2.)Leq(Night)A-weighted decibels(dB(A))53.233.770
    14.5.     No. of Soil Sample Monitored locations : 5
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)P(Phosphorus)Kilogram per hectare15.21.4
(2.)Electric ConductivityMillisiemens per Centimetre36298
(3.)pH6.75.9
(4.)K(Potassium)Kilogram per hectare280112
(5.)N(Nitrogen)Kilogram per hectare389151
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 5
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 5
(c)Whether Ground Water Intersection will be there ? Yes
(d)Upload Copy of Central Ground Water Authority Letter Copy of Central Ground Water Authority Letter
(e)Letter No. 21-4/1156/OR/MIN/2017-1.1.35
(f)Date of Issue 20 Nov 2017
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersQuarry discharge water10001.5Copy of Permission LetterPipelineOthersPump21-4/1156/OR/MIN/2017-1.1.3520 Nov 20171060
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic and drinking400NONEDischarge into Surface Water Body,Green Belt Renewal Plant2416
(2.)Pit head bath160NONEGreen Belt Renewal Plant160
(3.)Quarry discharge from Sukurangi mine10001000ETPDischarge into Surface Water Body,Othersdrilling/spraying; Pithead Bath; Equipment washing47953
(4.)Equipment and vehicle washing90NONEOthersDRILLING AND SPRAYING90
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 1065
(b)Total Discharged Water (Kilolitre per Day) 969
(c)Total Reused Water (Kilolitre per Day) 96
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)SUB GRADEOthersSub-grade (+10-30% Cr2O3 content)1930000Tons1RoadOthersTO BE STACKED
(2.)TOP SOILOthersTop soil & Sub Soil548722Tons1RoadOthersconcurrent reclamation/afforestation
(3.)OVER BURDENOthersOVERBURDEN/INTER BURDEN91650000Tons1RoadOthersTO BE STACKED
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)NOxMicrogram per Meter Cube23.70023.7180
(2.)PM10Microgram per Meter Cube9701.0698.07100
(3.)PM2.5Microgram per Meter Cube350035.0160
(4.)SO2Microgram per Meter Cube8.2008.2180
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)noneNA00SO2NA
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 50
(b)Source Kalarangi sub-station belonging to GRIDCO
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) One 10 KVA DG Set
(e)Stack Height (in m) 0
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 267.210
(b)Private Land (ha.) 74.599
(c)Government Land (ha.) 31.947
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 8.953
    Total Land (ha.) 382.709
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 74.599
(b)Waste/Barren Land (ha.) 31.947
(c)Grazing/ Community Land (ha.) 4.691
(d)Surface Water Bodies (ha.) 3.753
(e)Settlements (ha.) 0.509
(f)Industrial (ha.) 0
(g)Forest (ha.) 267.210
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : None 0
    Total (ha.) 382.709
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Quarry Area141.090Area to be excavated
(2.)OB Dump Area67.980
(3.)Green belt53.307
(4.)Main Plant16.810Infrastructure (Work-shop, Adm. Building)
(5.)Built Up Area1.060Road
(6.)Area for Solid Waste Management18.910Mineral storage area
(7.)OthersUndisturbed area83.552Undisturbed area
Total (ha.) 382.709
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)ESAsNone0NA
(2.)ESZsNone0NA
(3.)WLSNone0NA
(4.)NPANone0NA
(5.)CorridorsNone0NA
(6.)Wildlife CorridorsNone0No notified WL corridor. However, ML area adjoins the elephant movement area of Mahagiri DPF, which is about 18 towards NW and 3 km towards East from the ML area.
(7.)Critically Polluted AreaNone0NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNone0NA
(2.)ForestMahagiri P.F.,Daitari P.F.,Tamka P.F.,Rebna P.0within 10 km
(3.)Defence InstallationsNone0NA
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? Yes
(a)Forests Clearance Status In-Principle(Stage-I) Approval Obtained
(i)MoEFCC file number FP/OR/MIN/8471/2014
(ii)Date of In-Principle (Stage-I) approval 14 Sep 2017
(iii)Area diverted 0
(iv)Uploaded FC Letter Copy of FC Letter
(b)Legal Status of Forest Land Reserved
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) Not Applicable
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 136.737
(b)Land yet to be acquired(Ha) 162.420
(c)Status of Land acquisition if not acquired Stage-I clearance obtained. Stage-II FC is awaited
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species 1. Core Zone: Ratel / Honey Badger 2. Buffer Zone: Indian elephant, Sloth Bear/Black bear, Mouse Deer, Ratel / Honey Badger, Pangolin, Wolf
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 154 lakh; 56 lakh (core zone) & 98 lakh (ZoI)
(iii)Period of Implementation • 10 years (To be revisited at every five years)98
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? Yes
(i)Uploaded copy of approval Copy of approval
(ii)Letter No. 4415 [memo no.]
(iii)Date of issue 21 Jul 2009
(iv)Recommendation NA
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Damsal nala crossing the ML from east to west
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Damsal nala- crossing the ML from east to west ; Talangi nala – 1.4 km
(ii)Direction of Water Bodies in Buffer Area West
(iii)Distance of Water Bodies in Buffer Area 1.4
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 308
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 300
(f)Total Manpower 308
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt53.307053.307
(2.)Percentage of Total Project Area13.93013.93
(3.)No. of Plants85300085300
(4.)Funds Allocated224926002249260
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)FinancialTo meet the rising demand of chromite ore
(2.)EnvironmentalOMC have formulated socio-environmental performance indicators and contrive management programmes with best management practices for implementation.
(3.)Social-OMC is committed towards welfare activities of surrounding areas through peripheral development and CSR activities. -Impetus to the agriculture sector, physical infrastructures like roads, railways, electricity generation -Improvement in social infrastructures like education, health sector, water supply and training etc.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Non-Coal Mining
S. No.Item Details
     1.       No. of Mineral(s) to be Mined : 1
S. No.Mineral(s) to be Mined Major or Minor Mineral
(1.)ChromiteMajor
2.
Mine Capacity in ROM (Run of Mine) 0.3 MTPA
3.
Uploaded 500 meters Cluster Certificate from State Mines and Geology in case of minor minerals Copy of 500 meters Cluster Certificate from State Mines and Geology
4.
Mining Plan:
(a)Approval Letter No. MPM/FM/08-ORI/BHU/2018-19
(b)Date of Approval 04 Jun 2018
(c)Approved Letter Copy of Approved Letter
(d)Approved By State Mining and Geology Department IBM
(e)Approved Mining Lease Area 382.709
(f)Approved Capacity 300000
5.
Technical Details:
(a)Total Geological Reserves (Million Ton) 10.01
(b)Mineable Reserves (Million Ton) 6.67
(c)Extractable Reserves(Million Ton) 6.67
(d)Percent(%) of Extraction 100
(e)Grade of Coal /Ore /Mineral 46.33
(f)Stripping Ratio 1 : 5.68
(g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) NA
(h)Average Gradient(Degree) 70
(i)Mining Method Opencast
(j)Life of Mine (Years) 22
6.
Details of Beneficiations:
(a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area No
(b)Whether it is proposed to install crusher within the mining lease area No
7.
Details of Seams:
(a)Whether details of seam applicable No
8.
Details of Mining Lease:
(a)Mining Lease Area (in Hectare) 382.709
(b)Whether obtained Letter of Intent (LOI) from the state government ? No
(i)Reason thereof Proposal pertains to Expansion of an existing Mine
(c)Whether Lease Deed Executed ? Yes
(i)Copy of Executed Lease deed valid as on Date Copy of Executed Lease deed
(ii)Provide area in Hectare as per executed lease deed (initial) document 382.709
(iii)Validity of the lease deed From : 20 Sep 1980 To : 19 Sep 2030
(iv)Date of Execution of Mining Lese 03 Oct 2015
(v)Reference Number 12184
(d)Whether Lease Deed Renewed ? Yes
     8.1.    Earlier Renewals:
S. No.Lease Details Date of Renewal Period Copy of Earlier Lease Letter No.Area Remarks
(1.)Initial 01 Jan 1900 From : 20 Sep 1980 To : 19 Sep 2000 Copy of Earlier LeaseForm K 382.709 Granted for 20 years
(2.)Renewal 19 Sep 1999 From : 20 Sep 2000 To : 31 Mar 2020 Copy of Earlier Lease249 382.709 Deemed renewal since 20.09.2000
9.
OB (Over Burden) Management:
(a) Details of External Dumps:
(i)No. of OB Dumps 5
(ii)Total Area (in Hectare) 67.98
(iii)Height (in meter) 60
(iv)Quantity (in Million Cubic meter) 45.825
(v)No. of year back fill up 0
(b) Details of Internal Dumps:
(i)No. of Internal Dumps 0
(ii)Total Area (in Hectare) 0
(iii)Height (in meter) 0
(iv)Quantity (in Million Cubic meter) 0
10.
Details of Topsoil Management:
(a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) 0.343
(b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) 0.343
(c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) 0
11.
Details of Final Mine Void:
(a)Area (in Hectare) 141.0904
(b)Depth (in meter) 98
(c)Volume (in Million Cubic meter) 46.235
12.
Details of Quarry:
(a)Final Void of 141.0904 (hectare) at a Depth of 0 meter which is Proposed to be Converted into a Water Body.
(b)Total Quarry Area (ha) 141.0904
13.
Details of Transportation:
(a)In Pit/Underground to Surface Dumper/trucks
(b)Surface to Siding/Loading Dumper/trucks
(c)Transportation / Conveyor Details ROM is transported to Stockyard via road
     14.      Details of Land Usage (Pre-Mining)
S. No.LAND USE Other LAND USEWITHIN ML AREA (Hectare)OUTSIDE ML AREA (Hectare)TOTAL (Hectare)
(1.)AGRICULTURE LAND74.599074.599
(2.)SURFACE WATER BODIES3.75303.753
(3.)SETTLEMENTS0.50900.509
(4.)FOREST LAND267.2100267.21
(5.)GRAZING LAND4.69104.691
(6.)WASTE LAND31.947031.947
TOTAL382.7090382.709
     15.      Details of Land Usage (Post-Mining)
S. No.LAND USE Other LAND USEPlantation (ha)Water Body (ha)Public Use (ha)Undisturbed (ha)Total
(1.)EXCAVATION/QUARRY141.090400141.0904
(2.)TOP SOIL STORAGE0000
(3.)EXTERNAL OB DUMPS67.97980067.9798
(4.)INTERNAL OB DUMPS0000
(5.)ROADS001.05961.0596
(6.)VIRGIN AREA0083.552283.5522
(7.)OtherSub-grade18.910018.91
(8.)GREEN BELT53.30700053.307
(9.)BUILT UP AREA (COLONY/OFFICE)0016.8116.81
TOTAL281.28720101.42180382.709
16.
Details of Reclamation:
Total Afforestation Plan shall be Implemented Covering of Mining.
This will Include:
(a)External OB Dump(in hectare) 67.9798
(b)Internal Dump(in hectare) 0
(c)Quarry(in hectare) 141.0904
(d)Safety Zone(in hectare) 53.3070
(e)Final Void of 0 (hectare) at a Depth of 98 meter which is Proposed to be Converted into a Water Body.
(f)Density of Tree Plantation per ha (in no.) 1600
(g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) 18.91
(h)Total afforestation plant (in hectare) 227.9802
17.
Status of progressive Mining Closure Plan:
Copy of Implementation of Various Activities as per Approved Progressive Mine Closure Plan Copy of Implementation of Various Activities as per Approved Progressive Mine Closure Plan
Any Deviation from the Approved Progressive Mine Closure Plan None
Total Area Excavated (in hectare) 27.296
Total Area Backfilled after Excavation (in hectare) 0
Total Area Reclaimed (in hectare) 0
     18.      Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception:
S. No.Financial Year Sanctioned Capacity as per EC (MTPA)Sanctioned Capacity as per CTOSanctioned Capacity as per approved mining planActual Production Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA)
(1.)19850.133000.190
(2.)19860.133000.1980
(3.)19880.133000.2010
(4.)19890.133000.2030
(5.)19930.133000.1330
(6.)19950.1330.0120.0250.1190.107
(7.)19990.13300.0020.0150.015
(8.)20000.1330.0120.0210.2050.193
(9.)20020.1330.0120.0090.0900.081
(10.)19980.13300.0500.0030.003
(11.)20040.1330.0120.0320.1000.088
(12.)20050.1330.0120.0330.0500.038
(13.)20110.1300.1300.1140.2100.096
(14.)20120.1300.1300.1240.6750.551
(15.)20170.1300.1300.1301.3001.170
(16.)19940.133000.1000.100
(17.)20060.1330.0120.0710.1210.109
(18.)20070.1330.0120.1020.1100.098
(19.)20140.1300.1300.1310.5020.372
(20.)20010.1330.0120.0150.1510.139
(21.)20080.1330.0120.1270.1640.152
(22.)19970.13300.0400.2790.279
(23.)20130.1300.1300.1320.9610.831
(24.)19900.133000.2240
(25.)19920.133000.1040
(26.)19960.13300.0300.0160.016
(27.)20030.1330.0120.0170.1650.153
(28.)20090.1300.0120.1120.0460.034
(29.)20100.1300.1300.1130.0920
(30.)20150.1300.1300.1301.2951.165
(31.)20160.1300.1300.1301.2981.168
(32.)19870.133000.200
(33.)19910.133000.2000
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? Yes
(b)Name of the Court Tribunals
(c)Name of the Sub Court Central Administrative Tribunal
(d)Case No. Case No. RA NO.No. 22/52/2018-RC-I
(e)Orders/Directions of the court ,if any and its relevance with the proposed project Having considered the revision petition of project
(f)Case Details An application/revision petition was filed by the
(g)Uploaded Court Order Copy of Court Order
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA 0068
(ii)Name of the EIA Consultant MECON Limited
(iii)Address MECON Limited Vivekananda Path PO. Doranda, Dist – Ranchi, Jharkhand – 834002
(iv)Mobile No. 9431101160
(v)Landline No. 0651248364
(vi)Email Id mining@mecon.co.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation Non-Coal Mining
(ix)Validity of Accreditation 02 Oct 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NA(i) This is an expansion project. PP uploaded old compliance report. However latest Certified compliance report of earlier EC condition has not been uploaded. PP needs to upload latest Certified compliance report as per Ministry’s OM dated 30.05.2012 (ii) The documents related to the PH (viz Notice etc.) is not legible (iii) Details of past production of mine since its inception, duly authenticated by Department of Mines & Geology, State Government. (iv) Copy of affidavit needs to be submitted by PP in compliance of the Ministry’s OM no. 3-50/2017-IA.III (Pt.), dated 30th May 2018. (v) CTO is not legible (vi) Conservation plan is not legible (vii) Details of court cases and its updated status needs to be submitted 01 Feb 2019
2.NAThe correction have been made as per the instruction received 27 Apr 2019
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterNA 13 Nov 2019
2.NA

Deferred the proposal

24 Jun 2019
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantSuman Krishna Sit
DesignationGENERAL MANAGER (GEO)
Name of Company (Applicant Name should not be given here)ODISHA MINING CORPORATION LIMITED
AddressOdisha Mining Corporation Limited OMC House, Post Box No.: 34, Bhubaneswar