1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Expansion of Sukurangi Chromite Ore Mining Project | (b)Name of the Company / Organisation | ODISHA MINING CORPORATION LIMITED | (c)Registered Address | Odisha Mining Corporation Limited
OMC House, Post Box No.: 34, Bhubaneswar,,Khordha,Orissa-751001 | (d)Legal Status of the Company | Central PSU | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Suman Krishna Sit | (b)Designation (Owner/ Partner/ CEO) | GENERAL MANAGER (GEO) | (c)Address | Odisha Mining Corporation Limited
OMC House, Post Box No.: 34, Bhubaneswar - 751 001, Dist.: Khurda, Odisha,,,Khordha,Orissa-751001 | (d)Pin code | 751001 | (e)E-mail | envcl.omc@gmail.com | (f)STD Code. | 674(f)Telephone No. | 2377458 | (g)Fax No. | 06742377458 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 1(a) Mining of minerals
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/OR/MIN/8903/2007 | (d)Master Proposal Number(Single Window) | SW/91473/2019 | (e)EAC concerned (for category A Projects only) | Non-Coal Mining | (f)Project Type | Expansion |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Plot details given in Form 1 | (b)Pincode | 755018 | (c)Bounded Latitudes (North) | | From | | Degree | 21.005236 | Minutes | | Second | | From | | Degree | 21.06305 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 85.795492 | Minutes | | Second | | From | | Degree | 85.822706 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 73 G/16 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 5 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 0 | (j)Seismic Zone | 2 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Orissa | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | J-11015/409/2008-IA.II(M) | (c)Date of Issue of TOR | 22 Dec 2008 | (f)Previous TOR Letter | Copy of Previous TOR letter | (b)Date of Apply of EC | 06 Nov 2009 | (c)Date of Issue of EC | 18 Feb 2010 | (d)Previous EC Letter | Copy of Previous EC letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 09 Nov 2018 | Distance of Public Hearing Venue from the Proposed Project : | 2 |
| Community Centre of OMC, Kaliapani (Khata No. 55, Plot No. 736, Patharabani, Kalapani) | State : | Orissa | District : | Jajpur | Tehsil : | Sukinda | Village : | Kaliapani |
| 129 | 1. Employment opportunities 2. Skill development measures 3. Pollution control and plantation 4. Public Health & Sanitation 5. Education facilities 6. Peripheral Development | Others | ADM, Jajpur | |
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Bhubaneswar | (iii)Letter No. | 101-280/07/EPE-24 | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Mar 2 2019 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Chromite Opencast Mining Project | 130000 | 170000 | 300000 | Tons per Annum(TPA) | | Road,Rail | | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | Fully-mechanised Opencast (FMOC) mining | FMOC mining with production capacity - 0.13 MTPA | FMOC mining with enhancement of another 0.17 MTPA | FMOC mining with production capacity - 0.30 MTPA | | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | Copy of Consent to Operate | (iii)Date of Issue | 16 Mar 2016 | (iv)Valid Upto | 31 Mar 2020 | (v)File No. | 4552/IND-I-CON-388 | (vi)Application No. | 436922 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 32.02 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 21.30 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0.32 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.44 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 5 | (b)Existing quantity of raw material/fuel | 2 | (c)Total quantity of raw material/fuel | 7 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | HSD | 8.89 | Kilo Litre per Day | | IOCL | Road | | 2 | Fuel Supply Agreement | | Copy of Linkage | (2.) | EXPLOSIVE | 7 | Others | TPD | Magazine OMC | Road | | 13 | Others | LICENCE | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Dec 2015 To 29 Feb 2016 | (b)Season | Winter | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 9 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM10 | | Micro Gram per Meter Cube | 97 | 52 | 84.23 | 100 | (2.) | PM2.5 | | Micro Gram per Meter Cube | 43 | 16 | 37.23 | 60 | (3.) | SO2 | | Micro Gram per Meter Cube | 9.1 | 4.0 | 7.8 | 80 | (4.) | NOx | | Micro Gram per Meter Cube | 27.5 | 12.6 | 22 | 80 | |
14.2. No. of Ground Water monitoring locations : 6 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | pH | | | NA | | 7.4 | 6.6 | 6.5 | 8.5 | (2.) | TDS | | | mg/l | | 282 | 80 | 500 | 2000 | (3.) | Fluoride | | | mg/l | | 0.26 | 0.012 | 1 | 1.5 | (4.) | Heavy Metals | | Copper | mg/l | | 0.011 | 0.011 | 0.05 | 1.5 | (5.) | Others | total alkalinity | | mg/l | | 184 | 28 | 200 | 600 | (6.) | Chlorides | | | mg/l | | 12 | 5 | 250 | 1000 | (7.) | Total Hardness | | | mg/l | | 196 | 36 | 200 | 600 | (8.) | TSS | | | NA | | 0 | 0 | 0 | 0 | |
14.3. No. of Surface Water monitoring locations : 4 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | DO | | mg/l | | 7.4 | 6.5 | A | (2.) | BOD | | mg/l | | 3 | 1 | C | (3.) | Others | Total coliform organism | Others | MPN/ 100ml | 480 | 40 | B | (4.) | pH | | NA | | 7.49 | 7.2 | A | (5.) | COD | | NA | | 0 | 0 | A | |
14.4. No. of Ambient Noise monitoring locations : 9 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 59.3 | 42.5 | 75 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 53.2 | 33.7 | 70 | |
14.5. No. of Soil Sample Monitored locations : 5 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | P(Phosphorus) | Kilogram per hectare | | 15.2 | 1.4 | (2.) | Electric Conductivity | Millisiemens per Centimetre | | 362 | 98 | (3.) | pH | | | 6.7 | 5.9 | (4.) | K(Potassium) | Kilogram per hectare | | 280 | 112 | (5.) | N(Nitrogen) | Kilogram per hectare | | 389 | 151 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 10 To 5 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 10 To 5 | (c)Whether Ground Water Intersection will be there ? | Yes | (d)Upload Copy of Central Ground Water Authority Letter | Copy of Central Ground Water Authority Letter | (e)Letter No. | 21-4/1156/OR/MIN/2017-1.1.35 | (f)Date of Issue | 20 Nov 2017 | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | Quarry discharge water | 1000 | 1.5 | Copy of Permission Letter | Pipeline | | Others | Pump | 21-4/1156/OR/MIN/2017-1.1.35 | 20 Nov 2017 | 1060 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Domestic and drinking | 40 | 0 | NONE | Discharge into Surface Water Body,Green Belt Renewal Plant | | 24 | 16 | (2.) | Pit head bath | 16 | 0 | NONE | Green Belt Renewal Plant | | 16 | 0 | (3.) | Quarry discharge from Sukurangi mine | 1000 | 1000 | ETP | Discharge into Surface Water Body,Others | drilling/spraying; Pithead Bath; Equipment washing | 47 | 953 | (4.) | Equipment and vehicle washing | 9 | 0 | NONE | Others | DRILLING AND SPRAYING | 9 | 0 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 1065 | (b)Total Discharged Water (Kilolitre per Day) | 969 | (c)Total Reused Water (Kilolitre per Day) | 96 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | SUB GRADE | Others | Sub-grade (+10-30% Cr2O3 content) | 1930000 | Tons | 1 | Road | | Others | TO BE STACKED | (2.) | TOP SOIL | Others | Top soil & Sub Soil | 548722 | Tons | 1 | Road | | Others | concurrent reclamation/afforestation | (3.) | OVER BURDEN | Others | OVERBURDEN/INTER BURDEN | 91650000 | Tons | 1 | Road | | Others | TO BE STACKED | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | NOx | | Microgram per Meter Cube | 23.7 | 0 | 0 | 23.71 | 80 | (2.) | PM10 | | Microgram per Meter Cube | 97 | 0 | 1.06 | 98.07 | 100 | (3.) | PM2.5 | | Microgram per Meter Cube | 35 | 0 | 0 | 35.01 | 60 | (4.) | SO2 | | Microgram per Meter Cube | 8.2 | 0 | 0 | 8.21 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | none | NA | 0 | 0 | SO2 | | NA | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 50 | (b)Source | Kalarangi sub-station belonging to GRIDCO | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | One 10 KVA DG Set | (e)Stack Height (in m) | 0 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 267.210 | (b)Private Land (ha.) | 74.599 | (c)Government Land (ha.) | 31.947 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 8.953 | Total Land (ha.) | 382.709 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 74.599 | (b)Waste/Barren Land (ha.) | 31.947 | (c)Grazing/ Community Land (ha.) | 4.691 | (d)Surface Water Bodies (ha.) | 3.753 | (e)Settlements (ha.) | 0.509 | (f)Industrial (ha.) | 0 | (g)Forest (ha.) | 267.210 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : None | 0 | Total (ha.) | 382.709 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Quarry Area | | 141.090 | Area to be excavated | (2.) | OB Dump Area | | 67.980 | | (3.) | Green belt | | 53.307 | | (4.) | Main Plant | | 16.810 | Infrastructure (Work-shop, Adm. Building) | (5.) | Built Up Area | | 1.060 | Road | (6.) | Area for Solid Waste Management | | 18.910 | Mineral storage area | (7.) | Others | Undisturbed area | 83.552 | Undisturbed area | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | ESAs | None | 0 | NA | (2.) | ESZs | None | 0 | NA | (3.) | WLS | None | 0 | NA | (4.) | NPA | None | 0 | NA | (5.) | Corridors | None | 0 | NA | (6.) | Wildlife Corridors | None | 0 | No notified WL corridor. However, ML area adjoins the elephant movement area of Mahagiri DPF, which is about 18 towards NW and 3 km towards East from the ML area. | (7.) | Critically Polluted Area | None | 0 | NA | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Archaeological Sites | | None | 0 | NA | (2.) | Forest | | Mahagiri P.F.,Daitari P.F.,Tamka P.F.,Rebna P. | 0 | within 10 km | (3.) | Defence Installations | | None | 0 | NA | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | Yes | (a)Forests Clearance Status | In-Principle(Stage-I) Approval Obtained | (i)MoEFCC file number | FP/OR/MIN/8471/2014 | (ii)Date of In-Principle (Stage-I) approval | 14 Sep 2017 | (iii)Area diverted | 0 | (iv)Uploaded FC Letter | Copy of FC Letter | (b)Legal Status of Forest Land | Reserved | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | Not Applicable | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 136.737 | (b)Land yet to be acquired(Ha) | 162.420 | (c)Status of Land acquisition if not acquired | Stage-I clearance obtained. Stage-II FC is awaited | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | Yes | (i)Details of Schedule-I Species | 1. Core Zone: Ratel / Honey Badger 2. Buffer Zone: Indian elephant, Sloth Bear/Black bear, Mouse Deer, Ratel / Honey Badger, Pangolin, Wolf | (b)Whether conservation plan for Schedule-I Species has been prepared ? | Yes | (i)Uploaded copy of conservation plan | Copy of conservation plan | (ii)Fund Provision made | 154 lakh; 56 lakh (core zone) & 98 lakh (ZoI) | (iii)Period of Implementation | • 10 years (To be revisited at every five years)98 | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | Yes | (i)Uploaded copy of approval | Copy of approval | (ii)Letter No. | 4415 [memo no.] | (iii)Date of issue | 21 Jul 2009 | (iv)Recommendation | NA | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | Yes | (i)Details of Water Bodies in Core Area | Damsal nala crossing the ML from east to west | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Damsal nala- crossing the ML from east to west ; Talangi nala – 1.4 km | (ii)Direction of Water Bodies in Buffer Area | West | (iii)Distance of Water Bodies in Buffer Area | 1.4 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 308 | (c)Temporary Employment- During Construction | 0 | (d)Temporary Employment- During Operation | 0 | (e)No. of working days | 300 | (f)Total Manpower | 308 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 53.307 | 0 | 53.307 | (2.) | Percentage of Total Project Area | 13.93 | 0 | 13.93 | (3.) | No. of Plants | 85300 | 0 | 85300 | (4.) | Funds Allocated | 2249260 | 0 | 2249260 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Financial | To meet the rising demand of chromite ore | (2.) | Environmental | OMC have formulated socio-environmental performance indicators and contrive management programmes with best management practices for implementation. | (3.) | Social | -OMC is committed towards welfare activities of surrounding areas through peripheral development and CSR activities.
-Impetus to the agriculture sector, physical infrastructures like roads, railways, electricity generation
-Improvement in social infrastructures like education, health sector, water supply and training etc. | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For Non-Coal Mining |
|
1. No. of Mineral(s) to be Mined : 1 |
---|
S. No. | Mineral(s) to be Mined | Major or Minor Mineral |
---|
(1.) | Chromite | Major | |
|
2. | Mine Capacity in ROM (Run of Mine) | 0.3 MTPA | |
|
|
4. | Mining Plan: | (a)Approval Letter No. | MPM/FM/08-ORI/BHU/2018-19 | (b)Date of Approval | 04 Jun 2018 | (c)Approved Letter | Copy of Approved Letter | (d)Approved By State Mining and Geology Department | IBM | (e)Approved Mining Lease Area | 382.709 | (f)Approved Capacity | 300000 | |
|
5. | Technical Details: | (a)Total Geological Reserves (Million Ton) | 10.01 | (b)Mineable Reserves (Million Ton) | 6.67 | (c)Extractable Reserves(Million Ton) | 6.67 | (d)Percent(%) of Extraction | 100 | (e)Grade of Coal /Ore /Mineral | 46.33 | (f)Stripping Ratio | 1 : 5.68 | (g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) | NA | (h)Average Gradient(Degree) | 70 | (i)Mining Method | Opencast | (j)Life of Mine (Years) | 22 | |
|
6. | Details of Beneficiations: | (a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area | No | (b)Whether it is proposed to install crusher within the mining lease area | No | |
|
7. | Details of Seams: | (a)Whether details of seam applicable | No | |
|
8. | Details of Mining Lease: | (a)Mining Lease Area (in Hectare) | 382.709 | (b)Whether obtained Letter of Intent (LOI) from the state government ? | No | (i)Reason thereof | Proposal pertains to Expansion of an existing Mine | (c)Whether Lease Deed Executed ? | Yes | (i)Copy of Executed Lease deed valid as on Date | Copy of Executed Lease deed | (ii)Provide area in Hectare as per executed lease deed (initial) document | 382.709 | (iii)Validity of the lease deed | From : 20 Sep 1980 To : 19 Sep 2030 | (iv)Date of Execution of Mining Lese | 03 Oct 2015 | (v)Reference Number | 12184 | (d)Whether Lease Deed Renewed ? | Yes | |
|
8.1. Earlier Renewals: |
---|
S. No. | Lease Details | Date of Renewal | Period | Copy of Earlier Lease | Letter No. | Area | Remarks |
---|
(1.) | Initial | 01 Jan 1900 | From : 20 Sep 1980 To : 19 Sep 2000 | Copy of Earlier Lease | Form K | 382.709 | Granted for 20 years | (2.) | Renewal | 19 Sep 1999 | From : 20 Sep 2000 To : 31 Mar 2020 | Copy of Earlier Lease | 249 | 382.709 | Deemed renewal since 20.09.2000 | |
|
9. | OB (Over Burden) Management: | (a) Details of External Dumps: | (i)No. of OB Dumps | 5 | (ii)Total Area (in Hectare) | 67.98 | (iii)Height (in meter) | 60 | (iv)Quantity (in Million Cubic meter) | 45.825 | (v)No. of year back fill up | 0 | (b) Details of Internal Dumps: | (i)No. of Internal Dumps | 0 | (ii)Total Area (in Hectare) | 0 | (iii)Height (in meter) | 0 | (iv)Quantity (in Million Cubic meter) | 0 | |
|
10. | Details of Topsoil Management: | (a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) | 0.343 | (b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) | 0.343 | (c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) | 0 | |
|
11. | Details of Final Mine Void: | (a)Area (in Hectare) | 141.0904 | (b)Depth (in meter) | 98 | (c)Volume (in Million Cubic meter) | 46.235 | |
|
12. | Details of Quarry: | (a)Final Void of 141.0904 (hectare) at a Depth of 0 meter which is Proposed to be Converted into a Water Body. | (b)Total Quarry Area (ha) | 141.0904 | |
|
13. | Details of Transportation: | (a)In Pit/Underground to Surface | Dumper/trucks | (b)Surface to Siding/Loading | Dumper/trucks | (c)Transportation / Conveyor Details | ROM is transported to Stockyard via road | |
|
|
14. Details of Land Usage (Pre-Mining) |
---|
S. No. | LAND USE | Other LAND USE | WITHIN ML AREA (Hectare) | OUTSIDE ML AREA (Hectare) | TOTAL (Hectare) |
---|
(1.) | AGRICULTURE LAND | | 74.599 | 0 | 74.599 | (2.) | SURFACE WATER BODIES | | 3.753 | 0 | 3.753 | (3.) | SETTLEMENTS | | 0.509 | 0 | 0.509 | (4.) | FOREST LAND | | 267.210 | 0 | 267.21 | (5.) | GRAZING LAND | | 4.691 | 0 | 4.691 | (6.) | WASTE LAND | | 31.947 | 0 | 31.947 | |
TOTAL | 382.709 | 0 | 382.709 | |
|
15. Details of Land Usage (Post-Mining) |
---|
S. No. | LAND USE | Other LAND USE | Plantation (ha) | Water Body (ha) | Public Use (ha) | Undisturbed (ha) | Total |
---|
(1.) | EXCAVATION/QUARRY | | 141.0904 | 0 | 0 | | 141.0904 | (2.) | TOP SOIL STORAGE | | 0 | 0 | 0 | | 0 | (3.) | EXTERNAL OB DUMPS | | 67.9798 | 0 | 0 | | 67.9798 | (4.) | INTERNAL OB DUMPS | | 0 | 0 | 0 | | 0 | (5.) | ROADS | | 0 | 0 | 1.0596 | | 1.0596 | (6.) | VIRGIN AREA | | 0 | 0 | 83.5522 | | 83.5522 | (7.) | Other | Sub-grade | 18.91 | 0 | 0 | | 18.91 | (8.) | GREEN BELT | | 53.3070 | 0 | 0 | | 53.307 | (9.) | BUILT UP AREA (COLONY/OFFICE) | | 0 | 0 | 16.81 | | 16.81 | |
TOTAL | 281.2872 | 0 | 101.4218 | 0 | 382.709 | |
16. | Details of Reclamation: | Total Afforestation Plan shall be Implemented Covering of Mining.This will Include: | (a)External OB Dump(in hectare) | 67.9798 | (b)Internal Dump(in hectare) | 0 | (c)Quarry(in hectare) | 141.0904 | (d)Safety Zone(in hectare) | 53.3070 | (e)Final Void of 0 (hectare) at a Depth of 98 meter which is Proposed to be Converted into a Water Body. | (f)Density of Tree Plantation per ha (in no.) | 1600 | (g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) | 18.91 | (h)Total afforestation plant (in hectare) | 227.9802 | |
|
|
18. Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception: |
---|
S. No. | Financial Year | Sanctioned Capacity as per EC (MTPA) | Sanctioned Capacity as per CTO | Sanctioned Capacity as per approved mining plan | Actual Production | Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA) |
---|
(1.) | 1985 | 0.133 | 0 | 0 | 0.19 | 0 | (2.) | 1986 | 0.133 | 0 | 0 | 0.198 | 0 | (3.) | 1988 | 0.133 | 0 | 0 | 0.201 | 0 | (4.) | 1989 | 0.133 | 0 | 0 | 0.203 | 0 | (5.) | 1993 | 0.133 | 0 | 0 | 0.133 | 0 | (6.) | 1995 | 0.133 | 0.012 | 0.025 | 0.119 | 0.107 | (7.) | 1999 | 0.133 | 0 | 0.002 | 0.015 | 0.015 | (8.) | 2000 | 0.133 | 0.012 | 0.021 | 0.205 | 0.193 | (9.) | 2002 | 0.133 | 0.012 | 0.009 | 0.090 | 0.081 | (10.) | 1998 | 0.133 | 0 | 0.050 | 0.003 | 0.003 | (11.) | 2004 | 0.133 | 0.012 | 0.032 | 0.100 | 0.088 | (12.) | 2005 | 0.133 | 0.012 | 0.033 | 0.050 | 0.038 | (13.) | 2011 | 0.130 | 0.130 | 0.114 | 0.210 | 0.096 | (14.) | 2012 | 0.130 | 0.130 | 0.124 | 0.675 | 0.551 | (15.) | 2017 | 0.130 | 0.130 | 0.130 | 1.300 | 1.170 | (16.) | 1994 | 0.133 | 0 | 0 | 0.100 | 0.100 | (17.) | 2006 | 0.133 | 0.012 | 0.071 | 0.121 | 0.109 | (18.) | 2007 | 0.133 | 0.012 | 0.102 | 0.110 | 0.098 | (19.) | 2014 | 0.130 | 0.130 | 0.131 | 0.502 | 0.372 | (20.) | 2001 | 0.133 | 0.012 | 0.015 | 0.151 | 0.139 | (21.) | 2008 | 0.133 | 0.012 | 0.127 | 0.164 | 0.152 | (22.) | 1997 | 0.133 | 0 | 0.040 | 0.279 | 0.279 | (23.) | 2013 | 0.130 | 0.130 | 0.132 | 0.961 | 0.831 | (24.) | 1990 | 0.133 | 0 | 0 | 0.224 | 0 | (25.) | 1992 | 0.133 | 0 | 0 | 0.104 | 0 | (26.) | 1996 | 0.133 | 0 | 0.030 | 0.016 | 0.016 | (27.) | 2003 | 0.133 | 0.012 | 0.017 | 0.165 | 0.153 | (28.) | 2009 | 0.130 | 0.012 | 0.112 | 0.046 | 0.034 | (29.) | 2010 | 0.130 | 0.130 | 0.113 | 0.092 | 0 | (30.) | 2015 | 0.130 | 0.130 | 0.130 | 1.295 | 1.165 | (31.) | 2016 | 0.130 | 0.130 | 0.130 | 1.298 | 1.168 | (32.) | 1987 | 0.133 | 0 | 0 | 0.20 | 0 | (33.) | 1991 | 0.133 | 0 | 0 | 0.200 | 0 | |
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | Yes | (b)Name of the Court | Tribunals | (c)Name of the Sub Court | Central Administrative Tribunal | (d)Case No. | Case No. RA NO.No. 22/52/2018-RC-I | (e)Orders/Directions of the court ,if any and its relevance with the proposed project | Having considered the revision petition of project | (f)Case Details | An application/revision petition was filed by the | (g)Uploaded Court Order | Copy of Court Order | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1619/RA 0068 | (ii)Name of the EIA Consultant | MECON Limited | (iii)Address | MECON Limited Vivekananda Path PO. Doranda, Dist – Ranchi, Jharkhand – 834002 | (iv)Mobile No. | 9431101160 | (v)Landline No. | 0651248364 | (vi)Email Id | mining@mecon.co.in | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Non-Coal Mining | (ix)Validity of Accreditation | 02 Oct 2019 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | (i) This is an expansion project. PP uploaded old compliance report. However latest Certified compliance report of earlier EC condition has not been uploaded. PP needs to upload latest Certified compliance report as per Ministry’s OM dated 30.05.2012
(ii) The documents related to the PH (viz Notice etc.) is not legible
(iii) Details of past production of mine since its inception, duly authenticated by Department of Mines & Geology, State Government.
(iv) Copy of affidavit needs to be submitted by PP in compliance of the Ministry’s OM no. 3-50/2017-IA.III (Pt.), dated 30th May 2018.
(v) CTO is not legible
(vi) Conservation plan is not legible
(vii) Details of court cases and its updated status needs to be submitted | 01 Feb 2019 | 2. | NA | The correction have been made as per the instruction received | 27 Apr 2019 | |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | NA | 13 Nov 2019 | 2. | NA | Deferred the proposal | 24 Jun 2019 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Suman Krishna Sit | Designation | GENERAL MANAGER (GEO) | Name of Company (Applicant Name should not be given here) | ODISHA MINING CORPORATION LIMITED | Address | Odisha Mining Corporation Limited
OMC House, Post Box No.: 34, Bhubaneswar |
|