1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Proposed Expansion in Existing Capacity of Pesticides Technical, Intermediate & Pesticides Formulation Products & Addition of New Pesticides Technical Product within Existing Premises at M/s UPL Limit | (b)Name of the Company / Organisation | UPL LIMITED UNIT TWO | (c)Registered Address | Unit 2, Plot 3405/3406/3460-A, GIDC Estate, Ankleshwar,,Bharuch,Gujarat-393002 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Shankar M Karhale | (b)Designation (Owner/ Partner/ CEO) | GM | (c)Address | Plot no. 117/118, GIDC Notified Industrial Area,Ankleshwar,Anklesvar,Bharuch,Gujarat-393002 | (d)Pin code | 393002 | (e)E-mail | purvesh.soni@uniphos.com | (f)STD Code. | 0(f)Telephone No. | 6251223 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 5(b) Pesticides industry and pesticide specific intermediates (excluding formulations)
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/GJ/IND2/91392/2002 | (d)Master Proposal Number(Single Window) | SW/91383/2019 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 2 | (f)Project Type | Expansion |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Plot No 3405/3406 & 3460/A | (b)Pincode | 393002 | (c)Bounded Latitudes (North) | | From | | Degree | 21.6267 | Minutes | | Second | | From | | Degree | 21.6287 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 73.033784 | Minutes | | Second | | From | | Degree | 73.037854 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | OSM No - F43M14 & F43N2 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 25 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 9 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Gujarat | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | J-11011/180/2016-IA-II (I) | (c)Date of Issue of TOR | 03 Sep 2002 | (f)Previous TOR Letter | Copy of Previous TOR letter | (b)Date of Apply of EC | 04 Jul 2019 | (c)Date of Issue of EC | 14 Jan 2020 | (d)Previous EC Letter | Copy of Previous EC letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | Yes | (b)Reason | Proposed Expansion is located within Notified Indu | (c)Supporting Document | Copy of Supporting Document | |
|
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Bhopal | (iii)Letter No. | 5-77/2008(ENV)/609 | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Jul 18 2018 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Pesticide Technical | 2175 | 3405 | 5580 | Others | Tons per Month (TPM) | Road | | (2.) | Pesticide Intermediate Chemicals | 1894 | 2090 | 3984 | Others | Tons per Month (TPM) | Road | | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | Pesticide Technical Grade Production | 2175 Tons per Month | 3405 Tons per month | 5580 Tons per Month | Expansion within existing plant area only | (2.) | Pesticide Intermediate Chemicals | 1894 Tons per Month | 2090 Tons per Month | 3984 Tons per Month | Expansion within existing plant area only | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 27 Apr 2017 | (iv)Valid Upto | 02 Aug 2018 | (v)File No. | AWH-85575 | (vi)Application No. | GPCB/ANK/CCA-144(13)/ID-15832 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 445.8 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 26.02 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 7.72 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 33.93 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 234314.4 | (b)Existing quantity of raw material/fuel | 210291.5 | (c)Total quantity of raw material/fuel | 444605.9 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Dimethyl phosphoroamidothioate | 38700 | Tons per Annum | | Domestic Supply | Road | | 200 | Open Market | | Copy of Linkage | (2.) | ammonia solution | 29088 | Tons per Annum | | Domestic Supply | Road | | 100 | Open Market | | Copy of Linkage | (3.) | Acetic anhydride | 27576 | Tons per Annum | | Domestic Supply | Road | | 200 | Open Market | | Copy of Linkage | (4.) | Sulfuric Acid | 15624 | Tons per Annum | | Domestic Supply | Road | | 100 | Open Market | | Copy of Linkage | (5.) | Caustic Soda | 28277 | Tons per Annum | | Domestic Supply | Road | | 100 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 26 Feb 2018 To 21 May 2018 | (b)Season | Summer | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 9 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM2.5 | | Micro Gram per Meter Cube | 64.2 | 15.8 | 58.9 | 60 | (2.) | NOx | | Micro Gram per Meter Cube | 45.4 | 11.5 | 39.2 | 80 | (3.) | PM10 | | Micro Gram per Meter Cube | 121 | 35.5 | 100 | 100 | (4.) | Others | NH3 | Micro Gram per Meter Cube | 26.9 | 8.8 | 20.7 | 400 | (5.) | SO2 | | Micro Gram per Meter Cube | 25.4 | 7.3 | 22.4 | 80 | |
14.2. No. of Ground Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | TDS | | | mg/l | | 1395 | 821 | 500 | 2000 | (2.) | Total Hardness | | | mg/l | | 888 | 323 | 200 | 600 | (3.) | Fluoride | | | mg/l | | 0.8 | 0.4 | 1 | 1.5 | (4.) | pH | | | NA | | 8.3 | 7.4 | 6.5 | 8.5 | (5.) | Heavy Metals | | Arsenic | mg/l | | 0.00 | 0.00 | 0.01 | 0.05 | (6.) | TSS | | | mg/l | | 9 | 9 | 100 | 100 | (7.) | Chlorides | | | mg/l | | 456 | 168 | 250 | 1000 | |
14.3. No. of Surface Water monitoring locations : 4 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | NA | | 8.3 | 6.5 | D | (2.) | DO | | mg/l | | 7.1 | 5.8 | D | (3.) | BOD | | mg/l | | 10 | 10 | D | (4.) | COD | | mg/l | | 25 | 22 | D | |
14.4. No. of Ambient Noise monitoring locations : 9 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Night) | A-weighted decibels(dB(A)) | 68.8 | 41.1 | 70 | (2.) | Leq(Day) | A-weighted decibels(dB(A)) | 74.5 | 50.1 | 75 | |
14.5. No. of Soil Sample Monitored locations : 8 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | | | 8.5 | 8.3 | (2.) | N(Nitrogen) | Milligram per Kilogram | | 2.87 | 1.24 | (3.) | K(Potassium) | Milligram per Kilogram | | 0.86 | 0.07 | (4.) | P(Phosphorus) | Milligram per Kilogram | | 1.75 | 0.89 | (5.) | Electric Conductivity | Millisiemens per Centimetre | | 2.075 | 0.235 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 24.3 To 76 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 10 To 34 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | GIDC Supply | 3722 | 2 | Copy of Permission Letter | Pipeline | | Others | Pipeline | NTA/ANK/DEE(WS/1781) | 29 Oct 2018 | 3722 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Process, Cooling, Boiler Blowdown & MEE Condensate | 829 | 1200 | ETP, RO & MEE | Reuse within the Plant & Recycling | | 829 | | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 829 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 829 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Lead Acid Batteries | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 1 | Tons | 100 | Road | | Authorized Recyclers | | (2.) | Incinerable Waste | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 3404 | Tons | 2 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (3.) | Land Filling Waste | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 3151 | Tons | 2 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (4.) | Used Oil | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 3.7 | Kilolitre | 100 | Road | | Authorized Recyclers | | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 121 | 3.5 | 0.18 | 121.2 | 100 | (2.) | PM2.5 | | Microgram per Meter Cube | 64.2 | 3.5 | 0.18 | 64.4 | 60 | (3.) | SO2 | | Microgram per Meter Cube | 25.41 | 2.5 | 0.41 | 25.9 | 80 | (4.) | NOx | | Microgram per Meter Cube | 45.41 | 3.5 | 0.06 | 45.5 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Boiler Stacks | Natural Gas / FO | 30 | 0.9 | PM10 | | 0.55 | (2.) | Process Stack 2 | Nil | 30 | 0.6 | Others | H2S | 0.004 | (3.) | Process Stack 3 | Nil | 30 | 0.6 | Others | HCl | 0.017 | (4.) | Process Stacks | Nil | 30 | 0.6 | Others | VOCs | 0.005 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 20998 | (b)Source | Dakshin Gujarat Vij Company Limited (DGVCL) | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 2000 KVA | (e)Stack Height (in m) | 30 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0.00 | (b)Private Land (ha.) | 0.00 | (c)Government Land (ha.) | 0.00 | (d)Revenue Land (ha.) | 0.00 | (e)Other Land (ha.) | 6.5625 | Total Land (ha.) | 6.5625 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 21530 | (b)Waste/Barren Land (ha.) | 3860 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 480 | (e)Settlements (ha.) | 3250 | (f)Industrial (ha.) | 1880 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : Road, Canal | 640 | Total (ha.) | 31640 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 0 | No Additional Land is Required | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | WLS | Shoolpaneshwar WLS | 60 | Out side of study area | (2.) | ESZs | Shoolpaneshwar WLS | 60 | Out side of study area | (3.) | Corridors | Shoolpaneshwar WLS | 60 | Out side of study area | (4.) | Wildlife Corridors | Shoolpaneshwar WLS | 60 | Out side of study area | (5.) | Critically Polluted Area | Ahmedabad Vatva GIDC | 200 | Out side of study area | (6.) | NPA | Not Located within study area | 300 | Out side of study area | (7.) | ESAs | Shoolpaneshwar WLS | 60 | Out side of study area | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | Netrang Range Forest | 48 | Out side of study area | (2.) | Archaeological Sites | | Jami Masjid, Bharuch | 11 | Out side of study area | (3.) | Defence Installations | | Surat Base Camp | 80 | Out side of study area | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 6.5625 | (b)Land yet to be acquired(Ha) | 0.00 | (c)Status of Land acquisition if not acquired | Not Applicable | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Narmada River | (ii)Direction of Water Bodies in Buffer Area | North | (iii)Distance of Water Bodies in Buffer Area | 9 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 15 | (b)Permanent Employment-During Operation | 88 | (c)Temporary Employment- During Construction | 75 | (d)Temporary Employment- During Operation | 75 | (e)No. of working days | 365 | (f)Total Manpower | 253 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 13911.58 | 7744 | 21655.58 | (2.) | Percentage of Total Project Area | 21 | 12 | 33 | (3.) | No. of Plants | 2250 | 1500 | 3750 | (4.) | Funds Allocated | 4300000 | 2000000 | 6300000 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Social | Employment generation | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 2 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | Yes | (b)Name of the Court | Supreme Court of India | (c)Case No. | 3175 | (d)Orders/Directions of the court ,if any and its relevance with the proposed project | Stay order issued by Honorable supreme court of In | (e)Case Details | Stay order issued by Honorable supreme court of In | (f)Uploaded Court Order | Copy of Court Order | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1619/0055 | (ii)Name of the EIA Consultant | ERM India Pvt Ltd | (iii)Address | Building 10, Tower A, 4th Floor, DLF Cyber City, Gurgaon - 122002 | (iv)Mobile No. | 8238088022 | (v)Landline No. | 0794900231 | (vi)Email Id | sankalp.anand@erm.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 2 | (ix)Validity of Accreditation | 31 Oct 2019 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | Please inform/clarify/submit the following:-
- Copies of earlier ECs dated 17/7/2003 & 15/4/2008 and details to be mentioned against item 6 of Form-2.
- CTO issued by SPCB shows certain products banned by Ministry of Agriculture. Whether modification therein has been sought. Present status in this regard.
- Present industrial operations (Pesticide Technical 2175 TPM & Pesticide Intermediate Chemicals 1894 TPM) to be consistent with the ECs issued.
- Confirmation about the products actually requiring EC. | 07 Feb 2019 | 2. | NA | The correction have been made as per the instruction received | 14 Feb 2019 | 3. | NA | In view of complexity of the issues and the discrepancy still prevails, it is requested that the matter may be discussed with us in the Ministry for further action into the matter. | 24 Feb 2019 | 4. | NA | The correction have been made as per the instruction received | 04 Jul 2019 | |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Shankar M Karhale | Designation | GM | Name of Company (Applicant Name should not be given here) | UPL LIMITED UNIT TWO | Address | Unit 2, Plot 3405/3406/3460-A, GIDC Estate, Ankleshwar |
|