Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Proposed Expansion in Existing Capacity of Pesticides Technical, Intermediate & Pesticides Formulation Products & Addition of New Pesticides Technical Product within Existing Premises at M/s UPL Limit
(b)Name of the Company / Organisation UPL LIMITED UNIT TWO
(c)Registered Address Unit 2, Plot 3405/3406/3460-A, GIDC Estate, Ankleshwar,,Bharuch,Gujarat-393002
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Shankar M Karhale
(b)Designation (Owner/ Partner/ CEO) GM
(c)Address Plot no. 117/118, GIDC Notified Industrial Area,Ankleshwar,Anklesvar,Bharuch,Gujarat-393002
(d)Pin code 393002
(e)E-mail purvesh.soni@uniphos.com
(f)STD Code. 0(f)Telephone No. 6251223
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(b) Pesticides industry and pesticide specific intermediates (excluding formulations)
Minor Activity
(b)Category A
(c)Proposal Number IA/GJ/IND2/91392/2002
(d)Master Proposal Number(Single Window) SW/91383/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Plot No 3405/3406 & 3460/A
(b)Pincode 393002
(c)Bounded Latitudes (North)
From
Degree 21.6267
Minutes
Second
From
Degree 21.6287
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 73.033784
Minutes
Second
From
Degree 73.037854
Minutes
Second
(e)Survey of India Topo Sheet No. OSM No - F43M14 & F43N2
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 25
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 9
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-11011/180/2016-IA-II (I)
(c)Date of Issue of TOR 03 Sep 2002
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 04 Jul 2019
(c)Date of Issue of EC 14 Jan 2020
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason Proposed Expansion is located within Notified Indu
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Bhopal
(iii)Letter No. 5-77/2008(ENV)/609
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Jul 18 2018 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Pesticide Technical217534055580OthersTons per Month (TPM)Road
(2.)Pesticide Intermediate Chemicals189420903984OthersTons per Month (TPM)Road
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Pesticide Technical Grade Production2175 Tons per Month3405 Tons per month5580 Tons per MonthExpansion within existing plant area only
(2.)Pesticide Intermediate Chemicals1894 Tons per Month2090 Tons per Month3984 Tons per MonthExpansion within existing plant area only
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 27 Apr 2017
(iv)Valid Upto 02 Aug 2018
(v)File No. AWH-85575
(vi)Application No. GPCB/ANK/CCA-144(13)/ID-15832
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 445.8
(b) Funds Allocated for Environment Management (Capital) (in Crores) 26.02
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 7.72
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 33.93
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 234314.4
(b)Existing quantity of raw material/fuel 210291.5
(c)Total quantity of raw material/fuel 444605.9
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Dimethyl phosphoroamidothioate38700Tons per AnnumDomestic SupplyRoad200 Open MarketCopy of Linkage
(2.)ammonia solution29088Tons per AnnumDomestic SupplyRoad100 Open MarketCopy of Linkage
(3.)Acetic anhydride27576Tons per AnnumDomestic SupplyRoad200 Open MarketCopy of Linkage
(4.)Sulfuric Acid15624Tons per AnnumDomestic SupplyRoad100 Open MarketCopy of Linkage
(5.)Caustic Soda28277Tons per AnnumDomestic SupplyRoad100 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 26 Feb 2018 To 21 May 2018
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 9
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube64.215.858.960
(2.)NOxMicro Gram per Meter Cube45.411.539.280
(3.)PM10Micro Gram per Meter Cube12135.5100100
(4.)OthersNH3Micro Gram per Meter Cube26.98.820.7400
(5.)SO2Micro Gram per Meter Cube25.47.322.480
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TDSmg/l13958215002000
(2.)Total Hardnessmg/l888323200600
(3.)Fluoridemg/l0.80.411.5
(4.)pHNA8.37.46.58.5
(5.)Heavy MetalsArsenicmg/l0.000.000.010.05
(6.)TSSmg/l99100100
(7.)Chloridesmg/l4561682501000
    14.3.     No. of Surface Water monitoring locations : 4
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA8.36.5D
(2.)DOmg/l7.15.8D
(3.)BODmg/l1010D
(4.)CODmg/l2522D
    14.4.     No. of Ambient Noise monitoring locations : 9
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))68.841.170
(2.)Leq(Day)A-weighted decibels(dB(A))74.550.175
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH8.58.3
(2.)N(Nitrogen)Milligram per Kilogram2.871.24
(3.)K(Potassium)Milligram per Kilogram0.860.07
(4.)P(Phosphorus)Milligram per Kilogram1.750.89
(5.)Electric ConductivityMillisiemens per Centimetre2.0750.235
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 24.3 To 76
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 34
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersGIDC Supply37222Copy of Permission LetterPipelineOthersPipelineNTA/ANK/DEE(WS/1781)29 Oct 20183722
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Process, Cooling, Boiler Blowdown & MEE Condensate8291200ETP, RO & MEEReuse within the Plant & Recycling829
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 829
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 829
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Lead Acid BatteriesHazardous Waste (as per Hazardous and Other Waste Management rules 2016)1Tons100RoadAuthorized Recyclers
(2.)Incinerable WasteHazardous Waste (as per Hazardous and Other Waste Management rules 2016)3404Tons2RoadTreatment, Storage and Disposal Facility(TSDF)
(3.)Land Filling WasteHazardous Waste (as per Hazardous and Other Waste Management rules 2016)3151Tons2RoadTreatment, Storage and Disposal Facility(TSDF)
(4.)Used OilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)3.7Kilolitre100RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube1213.50.18121.2100
(2.)PM2.5Microgram per Meter Cube64.23.50.1864.460
(3.)SO2Microgram per Meter Cube25.412.50.4125.980
(4.)NOxMicrogram per Meter Cube45.413.50.0645.580
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Boiler StacksNatural Gas / FO300.9PM100.55
(2.)Process Stack 2Nil300.6OthersH2S0.004
(3.)Process Stack 3Nil300.6OthersHCl0.017
(4.)Process StacksNil300.6OthersVOCs0.005
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 20998
(b)Source Dakshin Gujarat Vij Company Limited (DGVCL)
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 2000 KVA
(e)Stack Height (in m) 30
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0.00
(b)Private Land (ha.) 0.00
(c)Government Land (ha.) 0.00
(d)Revenue Land (ha.) 0.00
(e)Other Land (ha.) 6.5625
    Total Land (ha.) 6.5625
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 21530
(b)Waste/Barren Land (ha.) 3860
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 480
(e)Settlements (ha.) 3250
(f)Industrial (ha.) 1880
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Road, Canal 640
    Total (ha.) 31640
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant0No Additional Land is Required
Total (ha.) 0
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSShoolpaneshwar WLS60Out side of study area
(2.)ESZsShoolpaneshwar WLS60Out side of study area
(3.)CorridorsShoolpaneshwar WLS60Out side of study area
(4.)Wildlife CorridorsShoolpaneshwar WLS60Out side of study area
(5.)Critically Polluted AreaAhmedabad Vatva GIDC200Out side of study area
(6.)NPANot Located within study area300Out side of study area
(7.)ESAsShoolpaneshwar WLS60Out side of study area
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNetrang Range Forest48Out side of study area
(2.)Archaeological SitesJami Masjid, Bharuch11Out side of study area
(3.)Defence InstallationsSurat Base Camp80Out side of study area
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 6.5625
(b)Land yet to be acquired(Ha) 0.00
(c)Status of Land acquisition if not acquired Not Applicable
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Narmada River
(ii)Direction of Water Bodies in Buffer Area North
(iii)Distance of Water Bodies in Buffer Area 9
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 15
(b)Permanent Employment-During Operation 88
(c)Temporary Employment- During Construction 75
(d)Temporary Employment- During Operation 75
(e)No. of working days 365
(f)Total Manpower 253
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt13911.58774421655.58
(2.)Percentage of Total Project Area211233
(3.)No. of Plants225015003750
(4.)Funds Allocated430000020000006300000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialEmployment generation
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? Yes
(b)Name of the Court Supreme Court of India
(c)Case No. 3175
(d)Orders/Directions of the court ,if any and its relevance with the proposed project Stay order issued by Honorable supreme court of In
(e)Case Details Stay order issued by Honorable supreme court of In
(f)Uploaded Court Order Copy of Court Order
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/0055
(ii)Name of the EIA Consultant ERM India Pvt Ltd
(iii)Address Building 10, Tower A, 4th Floor, DLF Cyber City, Gurgaon - 122002
(iv)Mobile No. 8238088022
(v)Landline No. 0794900231
(vi)Email Id sankalp.anand@erm.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 31 Oct 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAPlease inform/clarify/submit the following:- - Copies of earlier ECs dated 17/7/2003 & 15/4/2008 and details to be mentioned against item 6 of Form-2. - CTO issued by SPCB shows certain products banned by Ministry of Agriculture. Whether modification therein has been sought. Present status in this regard. - Present industrial operations (Pesticide Technical 2175 TPM & Pesticide Intermediate Chemicals 1894 TPM) to be consistent with the ECs issued. - Confirmation about the products actually requiring EC. 07 Feb 2019
2.NAThe correction have been made as per the instruction received 14 Feb 2019
3.NAIn view of complexity of the issues and the discrepancy still prevails, it is requested that the matter may be discussed with us in the Ministry for further action into the matter. 24 Feb 2019
4.NAThe correction have been made as per the instruction received 04 Jul 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantShankar M Karhale
DesignationGM
Name of Company (Applicant Name should not be given here)UPL LIMITED UNIT TWO
AddressUnit 2, Plot 3405/3406/3460-A, GIDC Estate, Ankleshwar
Print