Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Genext Steels Private Limited
(b)Name of the Company / Organisation GENEXT STEELS PVT LTD
(c)Registered Address 5-4-83 to 85, TSK Chambers, MG Road, Secunderabad,,Hyderabad,Telangana-500003
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Vinod Kedia
(b)Designation (Owner/ Partner/ CEO) Director
(c)Address 5-4-83 to 85, TSK Chambers, MG Road, Secunderabad,,Secunderabad,Hyderabad,Telangana-500003
(d)Pin code 500003
(e)E-mail genextsteels@gmail.com
(f)STD Code. 40(f)Telephone No. 27537606
(g)Fax No. 27537595
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity3(a) Metallurgical industries (ferrous & non ferrous)
Minor Activity3(a) Metallurgical industries (ferrous & non ferrous)
(b)Category A
(c)Proposal Number IA/GJ/IND/70023/2017
(d)Master Proposal Number(Single Window) SW/91180/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 1
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Survey no. 661, 662, 664, 665, 1822 & 1823
(b)Pincode 382715
(c)Bounded Latitudes (North)
From
Degree 22.624425
Minutes
Second
From
Degree 22.628572
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 72.162125
Minutes
Second
From
Degree 72.168319
Minutes
Second
(e)Survey of India Topo Sheet No. F43G2, F43G6
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 55
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 30
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)GujaratAhmedabadBavla
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/501/2017-IA-II(I)
(b)Date of Apply of TOR 30 Sep 2017
(c)Date of Issue of TOR / Standard ToR 11 Nov 2017
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :02 Oct 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :03 Nov 2018
Distance of Public Hearing Venue from the Proposed Project :00
At Project Sit, Survey No. 661, 662, 664, 665, 1822 & 1823
State :Gujarat
District :Ahmedabad
Tehsil :Bavla
Village :Bagodara
113Employment GenerationOthersAdditional Collector and Additional District Magistrate as a representative of District Collector & District magistrate, Ahmedabad
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)DRI Kilns4 x 150 TPDRotary Kiln, Kiln Cooler
(2.)Steel Melting Shop8 StrandsContinuous Casting Machine
(3.)Rolling Mill2 x 500 TPDContinuous Rolling Mill
(4.)Power Plant1 x 7 MWWHRB
(5.)Pellet Plant4 x 200 TPDDisc Pelletizer/Travelling Grate
(6.)Steel Melting Shop4 x 25 MT/heatInduction furnace
(7.)Power Plant1 x 5 MWFBC
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Pellets800OthersTPDRoad
(2.)MS Billets1000OthersTPDRoad
(3.)Structural steel, TMT bars & Rolled products1000OthersTPDRoad
(4.)Power Plant (Electricity generation)12OthersMWOthersNot required
(5.)Sponge Iron600OthersTPDRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 261
(b) Funds Allocated for Environment Management (Capital) (in Crores) 261
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 5.22
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 8
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 1470300
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 1470300
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Attached file1470300Tons per AnnumLOcalRoad1000 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Jan 2018 To 31 Mar 2018
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube45.526.040.660
(2.)NOxMicro Gram per Meter Cube24.412.118.880
(3.)PM10Micro Gram per Meter Cube77.250.671.6100
(4.)SO2Micro Gram per Meter Cube18.29.615.580
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TSSmg/l11.27.90000
(2.)TDSmg/l294819635002000
(3.)Total Hardnessmg/l447362300600
(4.)pHOtherspH Unit7.97.58.58.5
(5.)Chloridesmg/l14869582501000
(6.)Fluoridemg/l0.720.6311.5
    14.3.     No. of Surface Water monitoring locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHOtherspH Unit8.027.46A
(2.)DOmg/l6.64.9B
(3.)CODmg/l0000B
(4.)BODmg/l0000B
    14.4.     No. of Ambient Noise monitoring locations : 9
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))56.65075
(2.)Leq(Night)A-weighted decibels(dB(A))45.940.670
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Milligram per Kilogram11798
(2.)K(Potassium)Milligram per Kilogram18997
(3.)Electric ConductivityOthersds/m2.11.6
(4.)P(Phosphorus)Milligram per Kilogram11221
(5.)pHOtherspH Unit87.6
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 25 To 30
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 20 To 25
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater90500Copy of Permission LetterPipelineOthersBorewell21-4/4653/GJ/IND/201807 Sep 2018905
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Utility & Water treatment reject110110ETP-RO-MEEReuse within the Plant & Recycling110
(2.)Domestic02020STPReuse within the Plant & Recycling20
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 130
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 130
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)SlagOthersSolid Waste1080Tons25RoadOthersSold to brick manufacturers/ for road construction
(2.)ETP SludgeHazardous Waste (as per Hazardous and Other Waste Management rules 2016)60Tons135RoadTreatment, Storage and Disposal Facility(TSDF)
(3.)DolocharOthersSolid Waste1200Tons25RoadOthersFBC power plant/brick manufacturing units.
(4.)Mill scaleOthersSolid Waste300Tons25RoadOthersWill be reused in the Pellet Plant.
(5.)Fly AshFly Ash21684Tons25RoadOthersCement plant/Brick Manufacturer
(6.)MEE saltHazardous Waste (as per Hazardous and Other Waste Management rules 2016)156Tons150RoadTreatment, Storage and Disposal Facility(TSDF)
(7.)Discarded Drums/ContainerHazardous Waste (as per Hazardous and Other Waste Management rules 2016)500Tons30RoadOthersRegistered recycler
(8.)Used Lubricating OilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)60Kilolitre50RoadOthersRegistered re-processors
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube66.161.4111.7477.901100
(2.)SO2Microgram per Meter Cube13.181.418.42321.60480
(3.)PM2.5Microgram per Meter Cube34.811.4111.7446.55160
(4.)NOxMicrogram per Meter Cube16.181.417.84224.02380
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Pellet plant kiln 2Imported coal311OthersPM, SO2, NOx00
(2.)WHRB boiler (30 TPH)Waste gas generated from imported coal in DRI kiln752.0OthersPM,SO2,NOx00
(3.)Pellet Plant Kiln 1Imported coal311OthersPM, SO2, NOx00
(4.)Pellet Plant Kiln 3Imported coal311OthersPM,SO2,NOx00
(5.)Rotary Kiln 1Imported coal481.8OthersPM,SO2,NOx00
(6.)Rotart kiln 2imported coal481.8OthersPM,SO2,NOx00
(7.)Rotary Kiln 4imported coal481.8OthersPM,SO2,NOx00
(8.)Induction Furnace 1Electrity301OthersPM,SO2,NOx00
(9.)Induction furnace 2Electricity301OthersPM,SO2,NOx00
(10.)Induction Furnace 4Electricity301OthersPM,SO2,NOx00
(11.)FBC Boiler (25 TPH)Imported coal & Dolochar301.2OthersPM,SO2,NOx00
(12.)DG set (300 KVA X 8 Nos.) Stand byHSD110.375OthersPM,SO2,NOx00
(13.)DG set (750 KVA x 4 nos.) STand byHSD150.375OthersPM,SO2,NOx00
(14.)Vent of process area rotary kiln 1, 5 nos.not required110.450OthersPM00
(15.)vent of process area rotary kiln-2 (5 Nos,)None110.450OthersPM00
(16.)Vent of process area rotary kiln-4 (5 Nos.)NOne110.450OthersPM00
(17.)Rotart kiln 2imported coal481.8OthersPM,SO2,NOx00
(18.)Induction Furnace 3Electricity301OthersPM,SO2,NOx00
(19.)Vent of process area of Rotary kin -3 (5 nos.)NOne110.450OthersPM00
(20.)Pellet plant kiln 4Imported coal311OthersPM,SO2,NOx00
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 57000
(b)Source Captive Power Plant (12 MW) + Gujarat State Electr
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) Stand by DG set 300 KVA x 8 Nos. 750 KVA x 4 Nos
(e)Stack Height (in m) 15
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 00
(b)Private Land (ha.) 15.3061
(c)Government Land (ha.) 00
(d)Revenue Land (ha.) 00
(e)Other Land (ha.) 00
    Total Land (ha.) 15.3061
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 24774.6
(b)Waste/Barren Land (ha.) 4270.4
(c)Grazing/ Community Land (ha.) 00
(d)Surface Water Bodies (ha.) 847.8
(e)Settlements (ha.) 910.7
(f)Industrial (ha.) 596.6
(g)Forest (ha.) 00
(h)Mangroves (ha.) 00
(i)Marine Area (ha.) 00
(j)Others (ha.) : no other land 00
    Total (ha.) 31400.1
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Green belt5.0500
(2.)Built Up Area3.2375
(3.)OthersInternal Road, storage yard, Parking, open area7.0186
Total (ha.) 15.3061
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSNone within 10 Km00None within 10 Km
(2.)NPANone within 10 Km00None within 10 Km
(3.)ESAsNone within 10 Km00None within 10 Km
(4.)Critically Polluted AreaNone within 10 Km00None within 10 Km
(5.)CorridorsNone within 10 Km00None within 10 Km
(6.)Wildlife CorridorsNone within 10 Km00None within 10 Km
(7.)ESZsESZ of Nal sarovar bird sanctuary1.9Towards NNW direction
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNone within 10 Km00None within 10 Km
(2.)Archaeological SitesNone within 10 Km00None within 10 Km
(3.)Defence InstallationsNone within 10 Km00None within 10 Km
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 00
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 15.3061
(b)Land yet to be acquired(Ha) 00
(c)Status of Land acquisition if not acquired 00
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 00
(b)No. of Households 00
(c)No. of PDFs (Project Displaced Families) 00
(d)No. of PAFs (Project Affected Families) 00
(e)Funds Allocated for R&R(in INR) (in Lacs) 00
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Pond of village Bagodara, Gundanapara, mithapur
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Pond of village rohika, Shiyal and Dhingada is located in buffer Area.
(ii)Direction of Water Bodies in Buffer Area East
(iii)Distance of Water Bodies in Buffer Area 10
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 50
(b)Permanent Employment-During Operation 300
(c)Temporary Employment- During Construction 150
(d)Temporary Employment- During Operation 200
(e)No. of working days 26
(f)Total Manpower 700
32.
Green Belt in Ha:
(a)Total Area of Green Belt 50500
(b)Percentage of Total Project Area 329933.82
(c)No. of Plants to be Planted 5000
(d)Funds Allocated for Plantation 400000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialEmployment Opportunity
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 1
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA0084
(ii)Name of the EIA Consultant San Envirotech Pvt. Ltd., Ahmedabad
(iii)Address 401/402/423/424/324, Medicine Market, Opp. Shefali Centre, Paldi cross Road, Ahmedabad
(iv)Mobile No. 9825007201
(v)Landline No. 0792658307
(vi)Email Id mahendra.sepl@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 1
(ix)Validity of Accreditation 23 Dec 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAa. Social impact assessment study atleast covering the secondary sources has not been conducted as stipulated in the specific ToR. b. Traffic assessment study conducted and concluded in chapter 3 and 4 respectively are contradictory in nature. No conclusion was drawn with respect to the project. c. Lay out plan is not in the scale, legible and the legends has not been provided. 23 Jan 2019
2.NAThe correction have been made as per the instruction received 25 Jan 2019
3.NAThe brief note on corrections as mentioned by you may be provided by uploading the same to this EDS. The uploaded EIA on the portal does not contain the corrections as mentioned by you. 01 Feb 2019
4.NAThe correction have been made as per the instruction received 01 Feb 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantVinod Kedia
DesignationDirector
Name of Company (Applicant Name should not be given here)GENEXT STEELS PVT LTD
Address5-4-83 to 85, TSK Chambers, MG Road, Secunderabad
Print