Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Balmukund Sponge and Iron Pvt. Ltd. (Mega Div.)
(b)Name of the Company / Organisation BALMUKUND SPONGE AND IRON PRIVATE LIMITED
(c)Registered Address Village: Manjhiladih, P.O. Gadisrirampur, District: Giridih, Jharkhand,,Giridih,Jharkhand-815302
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Prem Prasad Verma
(b)Designation (Owner/ Partner/ CEO) Manager
(c)Address Balmukund Sponge and Iron Private Limited. At: Bajrang Chok, Near Biswanath Nursing Home, Giridih, Jharkhand,815301,Giridih,Giridih,Jharkhand-815301
(d)Pin code 815301
(e)E-mail balmukundsponge2011@gmail.com
(f)STD Code. 6532(f)Telephone No. 250597
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity3(a) Metallurgical industries (ferrous & non ferrous)
5(k) Induction/arc furnaces/cupola furnaces 5TPH or more
Minor Activity
(b)Category A
(c)Proposal Number IA/JH/IND/91108/2014
(d)Master Proposal Number(Single Window) SW/91092/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 1
(f)Project Type Modernization
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Khata no.161,162 & Plot no.940, 941, 942, 943, 944
(b)Pincode 825322
(c)Bounded Latitudes (North)
From
Degree 24.117
Minutes
Second
From
Degree 24.121
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 86.348
Minutes
Second
From
Degree 86.352
Minutes
Second
(e)Survey of India Topo Sheet No. 72L/8
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 295
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 1.3
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Jharkhand
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number EC/SEIAA/2013-14/297/2014/1525
(b)Date of Apply of TOR 28 Apr 2014
(c)Date of Issue of TOR / Standard ToR 25 Jul 2014
(d)Date of Apply of EC 15 Mar 2015
(e)Date of Issue of EC 25 Aug 2015
(f)Previous TOR Letter Copy of Previous TOR letter
(g)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :10 Nov 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :15 Dec 2018
Distance of Public Hearing Venue from the Proposed Project :1.25
Utkramit Madhya Vidyalaya, Kalhamanjho, Giridih
State :Jharkhand
District :Giridih
Tehsil :Giridih
Village :Kalhamanjho
158Pollution Control Borewell for irrigation Construction and maintenance of road Health facilityOthersDirector, DRDO
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Ranchi
(iii)Letter No. F. No.103/225/09/EPE/3094
(iv)Status of Compliance Partially Complied
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Feb 20 2019 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Rolling Mill50220270OthersTons/ dayRoad
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Induction Furnace21240 TPA Billet--21240 TPANo expansion
(2.)Mini Blast Furnace39000TPA--39000TPANo expansion
(3.)Iron ore beneficiation plant94000TPA (266TPD)--94000TPA (266TPD)No expansion
(4.)Rolling mill16000TPA (50TPD)86400TPA (270TPD)86400TPA (270TPD)New Hot rolling mill replace existing oil firedmill
(5.)Induction Furnace(SMS with CCM)102660TPA (290TPD)--102660TPA (290TPD)No expansion
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 13 Aug 2018
(iv)Valid Upto 30 Jun 2020
(v)File No. JSPCB/HO/RNC/CTO-2335595/2018/1314
(vi)Application No. JSPCB/HO/RNC/CTO-2335595/2018/1314
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 14
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.65
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.35
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.17
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 89856
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 89856
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Scrap1300Tons per AnnumFrom nearby industries in JharkhandRoad50 Open MarketCopy of Linkage
(2.)Silico Manganese186Tons per AnnumIn HouseRoad1 CaptiveCopy of Linkage
(3.)Coke150Tons per AnnumFrom nearby industries in JharkhandRoad50 Open MarketCopy of Linkage
(4.)Aluminium Shots30Tons per AnnumFrom nearby industries in JharkhandRoad50 Open MarketCopy of Linkage
(5.)Coke30700Tons per AnnumDhanbad & RamgarhRoad250 Open MarketCopy of Linkage
(6.)Dolomite4435Tons per AnnumBhutanRoad,Rail1000 Open MarketCopy of Linkage
(7.)Quartz1535Tons per AnnumNear by minesRoad250 Open MarketCopy of Linkage
(8.)Sponge Iron97400Tons per AnnumFrom nearby industries in JharkhandRoad50 Open MarketCopy of Linkage
(9.)MS Billets17000Tons per AnnumIn HouseRoad1 Open MarketCopy of Linkage
(10.)Pig Iron36055Tons per AnnumIn HouseRoad1 CaptiveCopy of Linkage
(11.)Iron ore76725Tons per AnnumChaibasa MinesRoad200 Open MarketCopy of Linkage
(12.)Limestone3400Tons per AnnumNear by minesRoad250 Open MarketCopy of Linkage
(13.)Petcoke1410Tons per AnnumChaibasa, Barajamda & DhanbadRoad250 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2018 To 31 May 2018
(b)Season Pre-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube90.951.190.56100
(2.)NOxMicro Gram per Meter Cube39.415.23980
(3.)PM2.5Micro Gram per Meter Cube53.119.95360
(4.)SO2Micro Gram per Meter Cube25.08.220.080
(5.)OthersCOMicro Gram per Meter Cube597.72143194000
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.26.58.58.5
(2.)TSSmg/l0000
(3.)Fluoridemg/l0.550.221.01.5
(4.)Heavy MetalsZnmg/l0.090.039515
(5.)Chloridesmg/l36122501000
(6.)Total Hardnessmg/l21640200600
(7.)OthersTotal Alkalinitymg/l18942200600
(8.)TDSmg/l3501305002000
    14.3.     No. of Surface Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.66.6C
(2.)DOmg/l7.36.5C
(3.)OthersChloridemg/l366C
(4.)CODmg/l205C
(5.)BODmg/l61C
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))72.350.275
(2.)Leq(Night)A-weighted decibels(dB(A))68.537.370
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH7.75.2
(2.)N(Nitrogen)Kilogram per hectare420114
(3.)K(Potassium)Kilogram per hectare56460
(4.)Electric ConductivityMillisiemens per Centimetre10318.8
(5.)P(Phosphorus)Kilogram per hectare8.82.02
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 12 To 9
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 3 To 6
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater690.5Copy of Permission LetterPipelineOthersBorewell21-4(166)/MER/CGWA/2013-39604 Mar 2014120
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)MBF200200SettlingReuse within the Plant & Recycling200
(2.)Beneficiation Plant500500SettlingReuse within the Plant & Recycling500
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 700
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 700
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Pig SlagIndustrial Waste77795Tons1RoadOtherssold to cement plant
(2.)Rolling mill end cuttingIndustrial Waste1560Tons1RoadCo-Processing
(3.)FinesIndustrial Waste20000Tons1RoadCo-Processing
(4.)Induction furnace slagIndustrial Waste4781Tons1RoadOthers8% recovered and land filling
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube85.60.10.2985.9100
(2.)PM2.5Microgram per Meter Cube35.80.10.236.260
(3.)NOxMicrogram per Meter Cube33.80.10.4334.380
(4.)SO2Microgram per Meter Cube22.30.10.422.7280
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)MBFCoal/ Coke301.0PM100.222 g/s
(2.)Induction FurnaceElectricity290.6PM100.083g/s
(3.)Induction FurnaceElectricity290.6SO20.016mg/Nm3
(4.)MBFCoal/Coke301SO20.069mg/Nm3
(5.)Induction FurnaceElectricity290.6NOx0.052mg/Nm3
(6.)MBFCoal/Coke301NOx0.042
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 24720
(b)Source Damodar Valley Corporation
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 350 KVA
(e)Stack Height (in m) 3.0
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0.0
(b)Private Land (ha.) 10.66
(c)Government Land (ha.) 0.0
(d)Revenue Land (ha.) 0.0
(e)Other Land (ha.) 0.0
    Total Land (ha.) 10.66
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0.0
(d)Surface Water Bodies (ha.) 0.0
(e)Settlements (ha.) 0.0
(f)Industrial (ha.) 10.66
(g)Forest (ha.) 0.0
(h)Mangroves (ha.) 0.0
(i)Marine Area (ha.) 0.0
(j)Others (ha.) : Nil 0.0
    Total (ha.) 10.66
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant5.66
(2.)OthersNew Rolling Mill0.752
(3.)Green belt3.52
(4.)Built Up Area0.724
Total (ha.) 10.656
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)NPANil0More than 10 Km from project site
(2.)ESAsNil0More than 10 Km from project site
(3.)WLSParashnath Wild Life Sanctuary25More than 10 Km from project site
(4.)ESZsNil0More than 10 Km from project site
(5.)CorridorsNil0More than 10 Km from project site
(6.)Critically Polluted AreaNA0More than 10 Km from project site
(7.)Wildlife CorridorsNil0More than 10 Km from project site
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestGangapur Forest1.5Protected Forest
(2.)Defence InstallationsNil0No defence installation within 10 Km of the project site
(3.)Archaeological SitesUshri fall2.0Tourist place
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 10.66
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Land already acquired
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Ushri River
(ii)Direction of Water Bodies in Buffer Area East
(iii)Distance of Water Bodies in Buffer Area 1.5
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 89
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 330
(f)Total Manpower 89
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt5.73.08.7
(2.)Percentage of Total Project Area221133
(3.)No. of Plants100001000020000
(4.)Funds Allocated5.05.010
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)Socialbenefit direct and indirectly
(2.)EnvironmentalPollution control, water sprinkling, plantation
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 1
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA0086
(ii)Name of the EIA Consultant Kalyani Laboratories Private Limited
(iii)Address Plot No. 78/944, Millenium City, Pahala, Bhubaneswar
(iv)Mobile No. 9437306091
(v)Landline No. 0674297405
(vi)Email Id kalyanilab@yahoo.co.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 1
(ix)Validity of Accreditation 31 May 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAi. Closure report on the observed non-compliances from Regional Office of the MoEF&CC shall be furnished. ii. CGWA water abstraction permission is of 4.3.2014 and already expired on 3.3.2016. Renewed water abstraction permission may be furnished. Possibility to use surface water in place of Ground water may also be submitted. 18 Jun 2019
2.NAThe correction have been made as per the instruction received 26 Aug 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantPrem Prasad Verma
DesignationManager
Name of Company (Applicant Name should not be given here)BALMUKUND SPONGE AND IRON PRIVATE LIMITED
AddressVillage: Manjhiladih, P.O. Gadisrirampur, District: Giridih, Jharkhand