Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) M/s Gurudatt Sugars Ltd.
(b)Name of the Company / Organisation RAHUL MADHAVRAO GHATAGE
(c)Registered Address M/s Shree Gurudatt Sugars Ltd.Gat no.61, Akiwat-Takaliwadi Road,Tal.Shirol, Dist.Kolhapur Maharashtra.,,Kolhapur,Maharashtra-416108
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Rahul Madhavrao Ghatage
(b)Designation (Owner/ Partner/ CEO) Executive Director
(c)Address M/s Shree Gurudatt Sugars Ltd. Gat No. 61, Akiwat-Takaliwadi Road, Tal.Shirol, Dist.Kolhapur Maharashtra,,Shirol,Kolhapur,Maharashtra-416108
(d)Pin code 416108
(e)E-mail gslsugars.env@gmail.com
(f)STD Code. 2322(f)Telephone No. 241577
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(g) Distilleries
5(j) Sugar Industry
Minor Activity1(d) Thermal Power Plants
(b)Category A
(c)Proposal Number IA/MH/IND2/59911/2014
(d)Master Proposal Number(Single Window) SW/90842/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Gut No. 61/A
(b)Pincode 416108
(c)Bounded Latitudes (North)
From
Degree 16.6202456
Minutes
Second
From
Degree 16.6224139
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 74.5959333
Minutes
Second
From
Degree 74.5983
Minutes
Second
(e)Survey of India Topo Sheet No. 47L10
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 540
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 5
(j)Seismic Zone 4
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Maharashtra
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)MaharashtraKolhapurShirol
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-11011/41/2015-IA II
(c)Date of Issue of TOR 18 May 2015
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 22 Oct 2016
(c)Date of Issue of EC 20 Mar 2017
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :04 Nov 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :05 Dec 2018
Distance of Public Hearing Venue from the Proposed Project :0
Shri Gurudatt Sugars Ltd.,Gut No.61/A, Akiwat Takaliwadi Road
State :Maharashtra
District :Kolhapur
Tehsil :Shirol
Village :Akiwat
11021. Quantity of Waste water. 2. Employment opportunities given to local peoples. 3. Increased Sugarcane production 4. Treatment for waste water ETP Scheme 5. Water lifting from river. 6. Proper diOthersAdditional District Magistrate
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Nagpur
(iii)Letter No. EC-830/RON/2018-NGP/4811
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Nov 11 2018 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Distillery0150150Kilo Litre per Day(KLD)Road
(2.)Refined Sugar017551755OthersTPDRoad
(3.)Co-Generation216990Mega Watt(MW)Road
(4.)Sugar6000700013000Tons Crushed per Day(TCD)Road
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Sugar Plant6000700013000TCD
(2.)Co-generation Plant216990MW
(3.)Distillery Plant0150150KLPD
(4.)Refined Sugar Plant017551755TPD
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 19 Apr 2018
(iv)Valid Upto 31 Jul 2019
(v)File No. Consent no. Format 1.0/BO/CAC-CELL/UAN No. 0000016
(vi)Application No. UAN No. 000001616 & 00000197783
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 350
(b) Funds Allocated for Environment Management (Capital) (in Crores) 19.6
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 3.5
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 1.65
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? Yes
d)Inter-State boundaries and international boundaries Yes
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel 0
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Sugar cane13000Tons Crushed per DayAround factory premisesRoad0 Open MarketAround factory premisesCopy of Linkage
(2.)Molasses520OthersMT/DIn-houseOthersPipeline0 OthersIn-houseCopy of Linkage
(3.)Spent Wash355OthersTPDIn-houseOthersNA0 OthersIn-houseCopy of Linkage
(4.)Coal344.14OthersTPDLocal MarketRoad40 Open MarketCopy of Linkage
(5.)Lime20.8OthersMT/DLocal MarketRoad40 Open MarketCopy of Linkage
(6.)Sulphur7.8OthersMT/DLocal MarketRoad40 Open MarketCopy of Linkage
(7.)Bagasse2128.7OthersTPDOwn/Local marketRoad0 OthersOwn/Local marketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Oct 2015 To 31 Dec 2015
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 9
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube47.802543.606100
(2.)PM2.5Micro Gram per Meter Cube18.57.517.57660
(3.)OthersCOMicro Gram per Meter Cube0.900.010.164
(4.)SO2Micro Gram per Meter Cube9.27.18.580
(5.)NOxMicro Gram per Meter Cube13.17.911.52280
    14.2.     No. of Ground Water monitoring locations : 9
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TSSmg/l20100
(2.)TDSmg/l12362845002000
(3.)Fluoridemg/l0.110.0911.5
(4.)Heavy MetalsArsenicmg/l000.050
(5.)pHNA8.097.078.50
(6.)Total Hardnessmg/l44534200600
(7.)Chloridesmg/l199.969.982501000
    14.3.     No. of Surface Water monitoring locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.97.5A
(2.)DOmg/l6.25.2A
(3.)BODmg/l00A
(4.)CODmg/l7.23.2A
    14.4.     No. of Ambient Noise monitoring locations : 13
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))433865
(2.)Leq(Day)A-weighted decibels(dB(A))534375
    14.5.     No. of Soil Sample Monitored locations : 9
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Milligram per Kilogram995376
(2.)K(Potassium)Milligram per Kilogram2176176
(3.)Electric ConductivityMillisiemens per Centimetre4160315
(4.)pH86.7
(5.)P(Phosphorus)Milligram per Kilogram157129.63
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 12.8 To 15
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 10.9 To 7.63
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface8922Copy of Permission LetterPipelineOthersRiver Water304918 Jun 20021400
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Co-gen Boiler blowdon & DM Water100125Primary+Secondary+Tertiary TreatmentOthersIrrigation on Own land0100
(2.)Domestic80100Septic Tank + Anaerobic FilterOthersIrrigation on own land080
(3.)Distillery Condensate & Spent Lease15001650Primary+Secondary+Tertiary TreatmentReuse within the Plant & Recycling1500
(4.)Sugar Condensate31203500Primary+Secondary+Tertiary TreatmentReuse within the Plant & Recycling3120
(5.)Sugar Factory Washing471600Primary+Secondary+Tertiary TreatmentOthersIrrigation on Own Land0471
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 5271
(b)Total Discharged Water (Kilolitre per Day) 651
(c)Total Reused Water (Kilolitre per Day) 4620
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)ETP SludgeMunicipal Solid Waste13.5Tons0RoadOthersUsed as a Manure
(2.)Garden TrashMunicipal Solid Waste180Tons0RoadOthersUsed for Composting
(3.)Spent OilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)7200Kilolitre0Pipe ConveyorOthersReuse in Own Boiler as fuel
(4.)Office Waste paperMunicipal Solid Waste72Tons40RoadAuthorized Recyclers
(5.)Boiler AshFly Ash53222.4Tons40RoadOthersSold to brick manufacturer
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube47.83.159.558100
(2.)PM2.5Microgram per Meter Cube18.53.154.22360
(3.)NOxMicrogram per Meter Cube9.23.151.31180
(4.)SO2Microgram per Meter Cube9.23.151.31180
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Proposed Bolier II 120 TPHBagasse & Coal705.5OthersPM10, SO2 , PM2.5100, 80, 60
(2.)Proposed Boiler I 120 TPHBagasse & Coal705.5OthersPM10, SO2 , PM2.5100, 80, 60
(3.)Proposed Boiler III 60 TPHSpent Wash & Coal904.4OthersPM10, SO2 , PM2.5100, 80, 60
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 90000
(b)Source Own/Inhouse Production
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 2 Nos of 625 KVA Capacity each
(e)Stack Height (in m) 30
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 22.25
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 22.25
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 15262.57
(b)Waste/Barren Land (ha.) 631.64
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 534.93
(e)Settlements (ha.) 804
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Fallow Land 14182
    Total (ha.) 31415.14
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Green belt7.44
(2.)OthersProcess house, storage, utilities, ETP14.81Open Space & area for Proposed expansion
Total (ha.) 22.25
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNA0NA
(2.)ESZsNA0NA
(3.)Wildlife CorridorsNA0NA
(4.)NPANA0NA
(5.)CorridorsNA0NA
(6.)WLSNA0NA
(7.)ESAsNA0NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNA0NA
(2.)Archaeological SitesNA0NA
(3.)Defence InstallationsNA0NA
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 22.25
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Krishna River
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Panchganaga River, Dudhganga River
(ii)Direction of Water Bodies in Buffer Area South West
(iii)Distance of Water Bodies in Buffer Area 6
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 10
(b)Permanent Employment-During Operation 140
(c)Temporary Employment- During Construction 120
(d)Temporary Employment- During Operation 30
(e)No. of working days 284
(f)Total Manpower 300
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt153.418.4
(2.)Percentage of Total Project Area27.276.1833.45
(3.)No. of Plants50080580
(4.)Funds Allocated1.20.51.7
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)Environmental1.By product like Molasses & Bagases will generated from Sugar Industry, it will be used in in-house Distillery & cogeneration plant. 2.Green Belt will be developed in area about 18.4 hec. which helps in pollution control and increase in aesthetic value of area.
(2.)Financial1. The project will contribute additional revenue to the state & central exchange in the form of different kind of taxes. 2. Maharashtra State is contributing nearly 40% if India’s total sugar production. The said project will contribute to enhance total sugar production of state.
(3.)Social1. There is an open market for sugarcane cultivator which increase in sugarcane productivity in the vicinity of plant area. 2. CER Cost 3. 5 Cr. for project will be used for social welfare of farmers and shareholders of surrounding area.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. 130
(ii)Name of the EIA Consultant sd engineering services pvt ltd
(iii)Address 14, Age Arcade, New Osmanpura, Near Sant Eknath Rang Mandir, Aurangabad
(iv)Mobile No. 9960634559
(v)Landline No. 0240233362
(vi)Email Id deepak.sanghai@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 10 Feb 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAPlease submit/clarify the following:- - Certified compliance report for the EC dated 20/3/2017 from the Ministry's Regional Office at Nagpur. - Permission of the regulatory authority to meet surface water requirement of 892 cum/day. 27 Jan 2019
2.NAThe correction have been made as per the instruction received 27 Jan 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantRahul Madhavrao Ghatage
DesignationExecutive Director
Name of Company (Applicant Name should not be given here)RAHUL MADHAVRAO GHATAGE
AddressM/s Shree Gurudatt Sugars Ltd.Gat no.61, Akiwat-Takaliwadi Road,Tal.Shirol, Dist.Kolhapur Maharashtra.
Print