1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | BPCL Jhansi-Augmentation of LPG Storage Capacity | (b)Name of the Company / Organisation | BPCL JHANSI | (c)Registered Address | Plot no. 5/6 sector 1, Noida,,Gautam Buddha Nagar,Uttar Pradesh-201301 | (d)Legal Status of the Company | Central PSU | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Nishant Kumar | (b)Designation (Owner/ Partner/ CEO) | TM | (c)Address | Village PO Ambabai, gwalier Road Jhansi UP,,Jhansi,Jhansi,Uttar Pradesh-284003 | (d)Pin code | 284003 | (e)E-mail | bpcljhansi2017@gmail.com | (f)STD Code. | 141(f)Telephone No. | 402915 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 6(b)Isolated storage & handling of hazardous chemicals (As per threshold planning
| Minor Activity | 8(a) Building and Construction projects
| (b)Category | A | (c)Proposal Number | IA/UP/IND2/69498/2017 | (d)Master Proposal Number(Single Window) | SW/90692/2019 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 2 | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Bharat Petroleum Corp. Ltd, LPG Territory Office & | (b)Pincode | 284003 | (c)Bounded Latitudes (North) | | From | | Degree | 253203 | Minutes | | Second | | From | | Degree | 253220 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 783018 | Minutes | | Second | | From | | Degree | 783032 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 54K/10 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 243 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 3.5 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Uttar Pradesh | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Uttar Pradesh | Jhansi | Jhansi | | |
|
6. | Details of Terms of Reference (ToR): | (a)MoEF&CC / SEIAA File Number | IA-J-11011/471/2017-IA-II(I) | (b)Date of Apply of TOR | 16 Sep 2017 | (c)Date of Issue of TOR / Standard ToR | 26 Oct 2017 | (d)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 28 Nov 2018 | Distance of Public Hearing Venue from the Proposed Project : | 0.5 |
| Elementary school, Pretampur, development block - Badgaon, Tehsil and Districtj Jhansi | State : | Uttar Pradesh | District : | Jhansi | Tehsil : | Jhansi | Village : | Ambabai |
| 38 | Mainly following issues raised during Public Hearing:-
1. Will local villagers have any preference for available job opportunity?
2.In case of any onsite and offsite incident is there any provision | Others | Additional District Magistrate (Administration), | |
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | LPG Storage | mounded storage vessel | 450 MT to 1350 MT | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Mounded Storage Vessel | 1350 | Others | MT | Road | | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 14 Jan 2016 | (iv)Valid Upto | 31 Dec 2020 | (v)File No. | 5059/Air Pollution/16 | (vi)Application No. | NIL | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 26.11 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 0.12 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0.2611 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.019 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | Yes | d)Inter-State boundaries and international boundaries | Yes | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 00 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 0 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | 70% Per Chloric Acid (Acid) | 00 | Tons per Annum | | 00 | Road | | 00 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Oct 2017 To 31 Dec 2017 | (b)Season | Post-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM10 | | Micro Gram per Meter Cube | 89.3 | 65.01 | 89.3 | 100 | (2.) | PM2.5 | | Micro Gram per Meter Cube | 55.9 | 35.1 | 55.6 | 60 | (3.) | NOx | | Micro Gram per Meter Cube | 29.9 | 17.1 | 29.9 | 80 | (4.) | Others | CO | Mili Gram per Meter Cube | 1.13 | 0.22 | 1.12 | 2 | (5.) | SO2 | | Micro Gram per Meter Cube | 12.9 | 6.0 | 12.8 | 80 | |
14.2. No. of Ground Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | TDS | | | mg/l | | 498 | 420 | 500 | 2000 | (2.) | TSS | | | mg/l | | 00 | 00 | 00 | 00 | (3.) | Total Hardness | | | mg/l | | 287 | 230 | 200 | 600 | (4.) | Chlorides | | | mg/l | | 50.9 | 35.7 | 250 | 1000 | (5.) | Fluoride | | | mg/l | | 00 | 00 | 1 | 1.5 | (6.) | Heavy Metals | | Lead | mg/l | | 00 | 00 | 0.01 | 0.01 | (7.) | pH | | | NA | | 7.65 | 7.11 | 6.5 | 8.5 | |
14.3. No. of Surface Water monitoring locations : 5 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | NA | | 7.24 | 7.05 | A | (2.) | DO | | mg/l | | 6.2 | 5.9 | B | (3.) | COD | | mg/l | | 38.2 | 25.4 | C | (4.) | BOD | | mg/l | | 6.4 | 5.2 | B | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 65.1 | 60.2 | 75 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 48.9 | 42.3 | 70 | |
14.5. No. of Soil Sample Monitored locations : 6 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | Others | NA | 8.14 | 7.75 | (2.) | N(Nitrogen) | Percent | | 0.093 | 0.084 | (3.) | P(Phosphorus) | Milligram per Kilogram | | 190.5 | 76.5 | (4.) | K(Potassium) | Milligram per Kilogram | | 340.7 | 240.5 | (5.) | Electric Conductivity | Millisiemens per Centimetre | | 460.5 | 320.9 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 15 To 5 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 16.07 To 2.47 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | GroundWater | | 10 | 00 | Not Appliacble | Pipeline | | Tube Well | | NIL | 26 Jan 2017 | 10 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Cleaning & Washing | 0.8 | 5 | Physico-Chemical | Green Belt Renewal Plant,Others | Landscape | 0.4 | 0.4 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 0.8 | (b)Total Discharged Water (Kilolitre per Day) | 0.4 | (c)Total Reused Water (Kilolitre per Day) | 0.4 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Solid Waste | Municipal Solid Waste | | 8.2 | Tons | 00 | Road | | Others | Municipal Disposal | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 84.4 | 1.4 | 0.37 | 84.77 | 100 | (2.) | PM2.5 | | Microgram per Meter Cube | 00 | 1400 | 00 | 00 | 00 | (3.) | SO2 | | Microgram per Meter Cube | 10.9 | 1.4 | 0.016 | 10.92 | 80 | (4.) | NOx | | Microgram per Meter Cube | 27.9 | 1.4 | 13.58 | 41.48 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | DG | 76 L/Hr. | 4 | 0.10 | PM10 | | 0.021 | (2.) | DG | 76L/Hr. | 4 | 0.10 | SO2 | | 0.069 | (3.) | DG | 76L/Hr. | 4 | 0.10 | NOx | | 0.654 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 200 | (b)Source | DVVNL | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 380 | (e)Stack Height (in m) | 4 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 00 | (b)Private Land (ha.) | 00 | (c)Government Land (ha.) | 26 | (d)Revenue Land (ha.) | 00 | (e)Other Land (ha.) | 00 | Total Land (ha.) | 26 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 10587.83 | (b)Waste/Barren Land (ha.) | 00 | (c)Grazing/ Community Land (ha.) | 00 | (d)Surface Water Bodies (ha.) | 1200.5 | (e)Settlements (ha.) | 1070.57 | (f)Industrial (ha.) | 00 | (g)Forest (ha.) | 3826.47 | (h)Mangroves (ha.) | 00 | (i)Marine Area (ha.) | 00 | (j)Others (ha.) : Open Land & Fallow Land | 14729.36 | Total (ha.) | 31414.73 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 2.96 | Plant area, office area & All covered Area | (2.) | Green belt | | 3.56 | Landscape Area | (3.) | Others | Road & Paved Area | 4.0 | Road & Open area | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Critically Polluted Area | None | 00 | None | (2.) | NPA | None | 00 | None | (3.) | ESZs | None | 00 | None | (4.) | Corridors | None | 00 | None | (5.) | Wildlife Corridors | None | 00 | None | (6.) | WLS | None | 00 | None | (7.) | ESAs | None | 00 | None | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Archaeological Sites | | None | 00 | NA | (2.) | Forest | | NONE | 00 | NA | (3.) | Defence Installations | | NONE | 00 | NA | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | Not Applicable | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 10.52 | (b)Land yet to be acquired(Ha) | 00 | (c)Status of Land acquisition if not acquired | NIL | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 00 | (b)No. of Households | 00 | (c)No. of PDFs (Project Displaced Families) | 00 | (d)No. of PAFs (Project Affected Families) | 00 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 00 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Pahuj Reservoir | (ii)Direction of Water Bodies in Buffer Area | South East | (iii)Distance of Water Bodies in Buffer Area | 3.54 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 0 | (c)Temporary Employment- During Construction | 0 | (d)Temporary Employment- During Operation | 0 | (e)No. of working days | 0 | (f)Total Manpower | 0 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 3.56 | (b)Percentage of Total Project Area | 13.69 | (c)No. of Plants to be Planted | 250 | (d)Funds Allocated for Plantation | 80000 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Environmental | The augmented capacity will help reduce waiting time and overcome the congestion of traffic, in various regions in the state of U.P. Thus, proposed Expansion will directly or indirectly reduce the consumption of natural resources such as wood and coal which will eventually help in saving the environment. | (2.) | Financial | There will be an additional central excise, and other applicable taxes through the proposed storage capacity augmentation. This will contribute to the regional/central revenue and will be further put in public expenditure. | (3.) | Social | There will be a positive impact on the indirect employment of the region.
• Transporters (Trucks and logistics) contract with BPCL for distribution purpose will increase and this would result in the additional employment by the transporter (in-contract).
• Due to gas transportation activity, petty food joints and & others en-route (fruits and vegetable markets) will be benefitted, to full fill the need of associated people. | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 2 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | Yes | (b)Details of Direction Issued Under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act | Consent To Operate | (c)Uploaded Copy of Direction Issued Under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act | Copy of Direction Issued | (d)Compliance status of the directions | Complied With | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | QCI/NABET/ENV/ACO/17/0336 | (ii)Name of the EIA Consultant | Gaurang Environmental Solutions Pvt. Ltd. | (iii)Address | 501, Paris Point, Near Collectorate Circle, Bani Park, Jaipur | (iv)Mobile No. | 9782074776 | (v)Landline No. | 0140402911 | (vi)Email Id | gaurangenviro@gmail.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 2 | (ix)Validity of Accreditation | 22 Jan 2020 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | The project/activity is covered under category B of item 6(b) of the schedule to the EIA Notification, 2006 and requires appraisal/approval at State level. Please submit your proposal accordingly. | 11 Jan 2019 | 2. | NA | The correction have been made as per the instruction received | 31 Jan 2019 | 3. | NA | - Applicability of general conditions needs to be confirmed with the authentic supporting documents.
- Status of EC for the present LPG storage capacity of 450 MT, and the compliance status thereof.
- CTO for the present LPG storage. | 02 Feb 2019 | 4. | NA | The correction have been made as per the instruction received | 06 Feb 2019 | 5. | NA | As requested earlier also, please inform whether the CTO issued in 1996 mentions about present LPG storage capacity of 450 MT. How the same shall be established. | 09 Feb 2019 | 6. | NA | The correction have been made as per the instruction received | 12 Feb 2019 | |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |