Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Grain based Distillery (2* 45 KLD) and Co-generation Power Plant (2*3MW) and IMFL/IMIL bottling (2*8000 day).
(b)Name of the Company / Organisation Starlight Energy Pvt. Ltd.
(c)Registered Address NIL
(d)Legal Status of the Company NIL
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant
(b)Designation (Owner/ Partner/ CEO) Director
(c)Address NIL
(d)Pin code 769001
(e)E-mail jain_yp@yahoo.com
(f)STD Code. (f)Telephone No.
(g)Fax No. 2600528
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(g) Distilleries
Minor Activity
(b)Category A
(c)Proposal Number IA/OR/IND2/69696/2014
(d)Master Proposal Number(Single Window) SW/90719/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 3
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 212,244,248,240,250,251,252,253,254,255,256,257,25
(b)Pincode 769001
(c)Bounded Latitudes (North)
From
Degree 19.324
Minutes
Second
From
Degree 19.826
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 82.875
Minutes
Second
From
Degree 82.88
Minutes
Second
(e)Survey of India Topo Sheet No. 65I/13 & 65 I/14
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 232.2
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 123.89
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Orissa
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number MoEF File No. J-11011/298/2014 IA II (I)
(b)Date of Apply of TOR 16 Sep 2014
(c)Date of Issue of TOR / Standard ToR 23 Jan 2015
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :29 Sep 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :01 Nov 2018
Distance of Public Hearing Venue from the Proposed Project :2
At gram panchayat office, palas, under Jhunagarh Block, Distt: Kalahandi
State :Orissa
District :Kalahandi
Tehsil :Junagarh
Village :gourd-sariguda
41During Public Hearing, Issues regarding the pollution c and employment generation were raisedDistrict Magistrate
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)captive power plant2*3 mw
(2.)IMFL/IMIL bottling plant2*8000
(3.)grain based distillery2*45 KLD
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)ENA/RS/Ethyl Alcohol90Kilo Litre per DayRoad
(2.)IMFL/country liquor16000OtherscasesRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 01 Jan 2019
(iv)Valid Upto 07 Jan 2019
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 92
(b) Funds Allocated for Environment Management (Capital) (in Crores) 9.1
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.18
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 04
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 00
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Enzymes66000Otherskgnearby marketRoad01 Open MarketCopy of Linkage
(2.)Non- Edible/ Waste Grain - Broken Rice, Sorghum, Bajra, Maize etc.75900Othersmetric tonnnearby marketRoad01 Open MarketCopy of Linkage
(3.)Urea148500Otherskgnearby marketRoad01 Open MarketCopy of Linkage
(4.)Boiler Fuel Biomass (Rice Husk)116160Othersmetric tonnnearby marketRoad1 Open MarketCopy of Linkage
(5.)Anti-foam Agent16500Otherskgnearby marketRoad01 Open MarketCopy of Linkage
(6.)Yeast66000Otherskgnearby marketRoad01 Open MarketCopy of Linkage
(7.)Sodium hydroxide33000Otherskgnearby marketRoad01 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Jan 2015 To 31 Mar 2015
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 06
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube40.830.940.7560
(2.)SO2Micro Gram per Meter Cube18.7718.4580
(3.)NOxMicro Gram per Meter Cube26.915.226.6580
(4.)PM10Micro Gram per Meter Cube78.950.378.9100
    14.2.     No. of Ground Water monitoring locations : 06
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.857.426.58.5
(2.)Fluoridemg/l0.770.261.01.5
(3.)Heavy MetalsIronmg/l0.770.261.01.5
(4.)TDSmg/l685.123705002000
(5.)Chloridesmg/l168.5018.542501000
(6.)Total Hardnessmg/l472.55276.65200600
(7.)TSSmg/l00000000
    14.3.     No. of Surface Water monitoring locations : 02
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.927.42C
(2.)DOmg/l5.605C
(3.)CODmg/l3936C
(4.)BODmg/l12.5011.20C
    14.4.     No. of Ambient Noise monitoring locations : 06
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))44.5040.2055
(2.)Leq(Day)A-weighted decibels(dB(A))53.6351.9265
    14.5.     No. of Soil Sample Monitored locations : 06
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pHOthersNA7.787.34
(2.)P(Phosphorus)Kilogram per hectare46.1032.81
(3.)K(Potassium)Kilogram per hectare258.92210
(4.)N(Nitrogen)Kilogram per hectare271.49228.88
(5.)Electric ConductivityMillisiemens per Centimetre0.5210.328
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.3 To 9.4
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.84 To 4.47
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface8902.5Copy of Permission LetterPipelineOthersriver0008 Jan 201900
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Industrial Projects - 20000Multiple Effect Evaporator & ETPReuse within the Plant & Recycling,Green Belt Renewal Plant00
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 0
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)boiler AhBottom Ash15Tons00Conveyor BeltOthersbrick manufacturing
(2.)SludgeOthersMEE27Kilolitre00Conveyor BeltOthersburn in the boiler
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)SO2Microgram per Meter Cube18.71.33.522.280
(2.)NOxMicrogram per Meter Cube0000000000
(3.)PM10Microgram per Meter Cube78.96.6886.9100
(4.)PM2.5Microgram per Meter Cube0000000000
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Stackrice husk361.2SO211.7
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 4000
(b)Source its own co-generation power plant of capacity2* 3
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 500
(e)Stack Height (in m) 30
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 00
(b)Private Land (ha.) 37.2
(c)Government Land (ha.) 00
(d)Revenue Land (ha.) 00
(e)Other Land (ha.) 00
    Total Land (ha.) 37.2
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 10779
(b)Waste/Barren Land (ha.) 00
(c)Grazing/ Community Land (ha.) 10138
(d)Surface Water Bodies (ha.) 1084
(e)Settlements (ha.) 1228
(f)Industrial (ha.) 00
(g)Forest (ha.) 469
(h)Mangroves (ha.) 00
(i)Marine Area (ha.) 00
(j)Others (ha.) : sandy/fallow land 9228
    Total (ha.) 32926
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Green belt9.71
(2.)Main Plant5.56
(3.)Otherspaved area/open are12.13
Total (ha.) 27.4
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSNA0000
(2.)NPAna0000
(3.)CorridorsNA0000
(4.)Critically Polluted AreaNA0000
(5.)ESAsNA0000
(6.)Wildlife CorridorsNA0000
(7.)ESZsNA0000
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Defence InstallationsNA0000
(2.)Archaeological SitesNA0000
(3.)ForestNear mathura0.3RF
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 00
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 37.2
(b)Land yet to be acquired(Ha) 00
(c)Status of Land acquisition if not acquired 00
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 00
(b)No. of Households 00
(c)No. of PDFs (Project Displaced Families) 00
(d)No. of PAFs (Project Affected Families) 00
(e)Funds Allocated for R&R(in INR) (in Lacs) 00
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species sloth bear, leopard, Indian Python, Indian Grey Hornbill, Indian peafowl
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area hatti nadi
(ii)Direction of Water Bodies in Buffer Area East
(iii)Distance of Water Bodies in Buffer Area 2.5
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 35
(b)Permanent Employment-During Operation 100
(c)Temporary Employment- During Construction 15
(d)Temporary Employment- During Operation 50
(e)No. of working days 330
(f)Total Manpower 200
32.
Green Belt in Ha:
(a)Total Area of Green Belt 9.71
(b)Percentage of Total Project Area 26.10
(c)No. of Plants to be Planted 12000
(d)Funds Allocated for Plantation 2000000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)FinancialProposed project shall generate the direct employment to approx. 200 peoples & much indirect employment opportunity for the local peoples.
(2.)SocialAs the project is located in the area where there is no major industry is available and the villagers depend majorly on agriculture. This project shall provide the employment opportunity to the villagers. Total fund of Rs. 115 lakhs earmarked towards CSR and Rs.18 lakhs for CER activities
(3.)EnvironmentalCompany is committed towards the environment & shall spend approx. The company shall spend approx. Rs. 4.55 crore of rupees towards the EMP budget also approx. Rs 2.05 crore rupees shall be spent as the recurring cost to ensure the effective working
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Industrial Projects - 3
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. QCI/NABET/ENV/ACO/17/ 0279
(ii)Name of the EIA Consultant Vardan Environet
(iii)Address D-142, Ground Floor, Sushant Lok-III, Golf Course Ext. Road, Sector-57, Gurugram, Haryana- 122002
(iv)Mobile No. 9953147268
(v)Landline No. 0124429103
(vi)Email Id vardanenviro165@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 3
(ix)Validity of Accreditation 09 Nov 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAProposal has been submitted after expiry of validity of the ToR on 23/1/2018 (3 years validity from the date of issue), which is not acceptable as per the extant norms/guidelines. 16 Jan 2019
2.NAThe correction have been made as per the instruction received 18 Jan 2019
3.NAPlease submit legible copy pf the public hearing proceedings dated 1/11/2018. Also, please submit proposal seeking permission from the concerned regulatory authority for surface water requirement of 890 cum/day. 22 Jan 2019
4.NAThe correction have been made as per the instruction received 05 Feb 2019
5.NA- As per the public hearing proceedings, it is revealed that more than 90% locals/public have opposed the project. - Still no proposal submitted to meet the water requirement of 890 cum/day for the proposed distillery. - Present status of request dated 7/10/2015 to the State Govt seeking permission for surface water withdrawal. 09 Feb 2019
6.NAThe correction have been made as per the instruction received 26 Feb 2019
7.NAPlease refer our earlier observations dated 9/2/2019 and your response thereto. There being conflicting statements/versions and no specific reply, it is requested that the matter may be discussed with us in the Ministry to arrive at a logical conclusion. 03 Mar 2019
8.NAThe correction have been made as per the instruction received 30 Apr 2019
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1.NA