1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Proposed unit of Municipal Solid Wast Management at Bharatpur | (b)Name of the Company / Organisation | ROLLZ MATERIAL HANDLING SYSTEMS PVT LTD | (c)Registered Address | Khasra No- 966, 992, 993, 1756, 1681, 1766, 1887, 1760 and 3103 Village- noh, Tehsil & District- Bharatpur (Raj),,Bharatpur,Rajasthan-321001 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Ankit Aggarwal | (b)Designation (Owner/ Partner/ CEO) | Director | (c)Address | R-10/107, Raj Nagar, Ghaziabad,Uttar Pradesh 201001,Ghaziabad,Ghaziabad,Uttar Pradesh-201001 | (d)Pin code | 201001 | (e)E-mail | rmhs.msw@gmail.com | (f)STD Code. | 0(f)Telephone No. | | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 7(i) Common Municipal Solid Waste Management Facility (CMSWMF)
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/RJ/MIS/71363/2017 | (d)Master Proposal Number(Single Window) | SW/90357/2019 | (e)EAC concerned (for category A Projects only) | INFRA-2 | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Khasra no 996, 992, 993, 1756, 1681, 1766, 1887, 1 | (b)Pincode | 321001 | (c)Bounded Latitudes (North) | | From | | Degree | 27.219142 | Minutes | | Second | | From | | Degree | 27.222282 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 77.546673 | Minutes | | Second | | From | | Degree | 77.548863 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 54E/12 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 178 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 1.0 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Rajasthan | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Rajasthan | Bharatpur | Bharatpur | | |
|
6. | Details of Terms of Reference (ToR): | (a)Whether TOR is mandatory for submitting application | Yes | (b)MoEF&CC / SEIAA File Number | 10-67/2017-IA-III | (c)Date of Apply of TOR | 02 Dec 2017 | (d)Date of Issue of TOR / Standard ToR | 15 May 2018 | (e)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 16 Oct 2018 | Distance of Public Hearing Venue from the Proposed Project : | 0.55 |
| Govt. Sr primary School, Vilage Noh, Bharatpur | State : | Rajasthan | District : | Bharatpur | Tehsil : | Bharatpur | Village : | Noh |
| 50 | Attached as annexure- 21 | Others | Additional District Collector | |
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | Shredder Machine, Ballistic separator, RDF machine | up to 300 TPD | Plant will run at starting with 101 TPD | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Refused derived fuel and compost | 60.6 | Others | TPD | Road | | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 12 May 2018 | (iv)Valid Upto | 04 Jan 2019 | (v)File No. | NA | (vi)Application No. | NA | (vii)Copy of Consent to operate valid as on date | NA | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 12.66 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 0.74 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0.25 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.08 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | Yes | a)Protected areas notified under the wildlife (Protection) Act, 1972 | Yes | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 101 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 101 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Municipal Solid Waste | 101 | Others | TPD | Municipal Council Bharatpur | Road | | 6 | MoU | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 15 Feb 2018 To 14 May 2018 | (b)Season | Pre-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 5 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM10 | | Micro Gram per Meter Cube | 84.6 | 55.42 | 83.92 | 100 | (2.) | SO2 | | Micro Gram per Meter Cube | 8.26 | 3.96 | 7.78 | 80 | (3.) | NOx | | Micro Gram per Meter Cube | 14.32 | 6.85 | 14.25 | 80 | (4.) | Others | CO | Micro Gram per Meter Cube | 420 | 240 | 420 | 2000 | (5.) | PM2.5 | | Micro Gram per Meter Cube | 42.56 | 25.38 | 41.94 | 60 | |
14.2. No. of Ground Water monitoring locations : 3 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | TDS | | | mg/l | | 2805 | 520 | 500 | 2000 | (2.) | Others | Sodium | | mg/l | | 504.68 | 260 | 00 | 00 | (3.) | pH | | | NA | | 7.49 | 7.38 | 7.5 | 00 | (4.) | Chlorides | | | mg/l | | 979.7 | 129.96 | 250 | 1000 | (5.) | Total Hardness | | | mg/l | | 946.2 | 188 | 200 | 600 | (6.) | Fluoride | | | mg/l | | 3.83 | 0.36 | 1 | 1.5 | (7.) | TSS | | | mg/l | | 00 | 00 | 00 | 00 | |
14.3. No. of Surface Water monitoring locations : 0 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | NA | | 00 | 00 | A | (2.) | DO | | NA | | 00 | 00 | A | (3.) | BOD | | NA | | 00 | 00 | A | (4.) | COD | | NA | | 00 | 00 | A | |
14.4. No. of Ambient Noise monitoring locations : 5 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 61.5 | 43.75 | 75 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 49.9 | 39.35 | 70 | |
14.5. No. of Soil Sample Monitored locations : 5 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | Others | NA | 8.18 | 7.60 | (2.) | N(Nitrogen) | Percent | | 0.05 | 0.02 | (3.) | P(Phosphorus) | Others | NA | 00 | 00 | (4.) | K(Potassium) | Milligram per Kilogram | | 11.2 | 7.4 | (5.) | Electric Conductivity | Millisiemens per Centimetre | | 3.621 | 3.0 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 27 To 40 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 24 To 30 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | GroundWater | | 2.0 | 6 | Not Appliacble | modeOthers | Tanker | Others | Govt tanker supply | 00 | 03 Jan 2019 | 2.0 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Leachate and domestic waste water | 6.2 | 10 | SBR | Reuse within the Plant & Recycling | | 6.2 | | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 6.2 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 6.2 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Sludge from ETP | Others | Sludge | 20 | Tons | 00 | Others | NA | Others | compost | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | NA | 00 | 00 | 00 | 00 | 00 | (2.) | PM2.5 | | NA | 00 | 00 | 00 | 00 | 00 | (3.) | SO2 | | NA | 00 | 00 | 00 | 00 | 00 | (4.) | NOx | | NA | 00 | 00 | 00 | 00 | 00 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | DG Set | Diesel | 00 | 00 | PM10 | | 00 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 200 | (b)Source | Rajasthan State Electricity Board | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 2 | (e)Stack Height (in m) | 00 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 00 | (b)Private Land (ha.) | 00 | (c)Government Land (ha.) | 7.0 | (d)Revenue Land (ha.) | 00 | (e)Other Land (ha.) | 00 | Total Land (ha.) | 7.0 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 00 | (b)Waste/Barren Land (ha.) | 00 | (c)Grazing/ Community Land (ha.) | 00 | (d)Surface Water Bodies (ha.) | 00 | (e)Settlements (ha.) | 00 | (f)Industrial (ha.) | 00 | (g)Forest (ha.) | 00 | (h)Mangroves (ha.) | 00 | (i)Marine Area (ha.) | 00 | (j)Others (ha.) : Municipal waste dumping site | 7.0 | Total (ha.) | 7 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 2.0 | | (2.) | LandFill | | 5.0 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | NPA | Keoladeo National Park | 4.0 | NOC obtained | (2.) | Wildlife Corridors | NA | 00 | NA | (3.) | Critically Polluted Area | NA | 00 | NA | (4.) | WLS | NA | 00 | NA | (5.) | ESAs | NA | 00 | NA | (6.) | ESZs | NA | 00 | NA | (7.) | Corridors | NA | 00 | NA | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Archaeological Sites | | Lohagarh Fort | 5.1 | NA | (2.) | Forest | | NA | 00 | NA | (3.) | Defence Installations | | NA | 00 | NA | |
|
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 7.0 | (b)Land yet to be acquired(Ha) | 00 | (c)Status of Land acquisition if not acquired | NA | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 00 | (b)No. of Households | 00 | (c)No. of PDFs (Project Displaced Families) | 00 | (d)No. of PAFs (Project Affected Families) | 00 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 00 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | Yes | (i)Details of Schedule-I Species | Attached file | (b)Whether conservation plan for Schedule-I Species has been prepared ? | Yes | (i)Uploaded copy of conservation plan | Copy of conservation plan | (ii)Fund Provision made | 100 Lakhs | (iii)Period of Implementation | 30 years | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | Yes | (i)Uploaded copy of approval | Copy of approval | (ii)Letter No. | 1533 | (iii)Date of issue | 28 Mar 2018 | (iv)Recommendation | NA | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Pond at Noh village | (ii)Direction of Water Bodies in Buffer Area | South East | (iii)Distance of Water Bodies in Buffer Area | 0.55 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 00 | (b)Permanent Employment-During Operation | 37 | (c)Temporary Employment- During Construction | 00 | (d)Temporary Employment- During Operation | 00 | (e)No. of working days | 365 | (f)Total Manpower | 37 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 2.45 | (b)Percentage of Total Project Area | 35.00 | (c)No. of Plants to be Planted | 2450 | (d)Funds Allocated for Plantation | 1200000 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Environmental | Control Environmental pollution by waste handling | (2.) | Social | Employment, Clean environment
availability of bio compost | (3.) | Financial | contribute to increase state govt. revenue. | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For INFRA-2 |
|
1. | Details of Building Construction: | (a)Maximum Height of the Building (Meters) | 8 | (b)Total No. of Flats to be Build | 00 | (c)No. of Buildings | 2 | (d)Total plot area (sqm) | 70000 | (e)Total built up area (sqm) | 7000 | |
|
2. | Foreshore Facilities and/or Marine Disposal: | (a)Whether Project Involves Foreshore Activities and/or marine Disposal? | No | |
|
3. | Rain Water Harvesting: | (a)No. of Storage | 7 | (b)Capacity | 36 | (c)No. of Recharge Pits | 7 | (d)Capacity | 36 | |
|
4. | Parking: | (a)Details of 4 Wheeler/ 2 Wheeler Parking | 10 ECS | |
|
5. | Energy Saving Measures: | (a)Source/Mode | Solar | (b)Percentage | 0.5 | (c)Quantity | 1 | |
|
|
7. Type of Industries to be established with Industrial Estate as per their category A/B |
---|
S. No. | Type of Industry | No. of Units | Category A/B |
---|
NIL | |
8. | Length of the alignment | N/A | |
|
9. | Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass | Details Not Applicable | |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1720/RA 051 | (ii)Name of the EIA Consultant | Eco Chem Sales & Service | (iii)Address | Office floor, Ashoka Pavillion- A, opp. Kapadia Health Club, New Civil Road, Surat - 395 001, Gujrat | (iv)Mobile No. | 9227934111 | (v)Landline No. | 9227934111 | (vi)Email Id | eco@ecoshripad.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | INFRA-2 | (ix)Validity of Accreditation | 03 Feb 2020 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought : NIL |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | NA | ADS reply is inadequate. Please provide following information /clarification:
1. Permission/NOC from TTZ Authority and its translation in English, if document is in regional language.
2. Submit valid certificate of EIA Consultant.
3. EIA Report to include duly signed Disclosure of Consultants in the relevant Chapter. | 11 May 2022 | 2. | ADS Reply Letter | NA | 11 May 2022 | 3. | NA | Kindly see the Final Minutes of 38th EAC Infra-2 meeting held on 6-8 Feb. 2019 | 15 Feb 2019 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Ankit Aggarwal | Designation | Director | Name of Company (Applicant Name should not be given here) | ROLLZ MATERIAL HANDLING SYSTEMS PVT LTD | Address | Khasra No- 966, 992, 993, 1756, 1681, 1766, 1887, 1760 and 3103 Village- noh, Tehsil & District- Bharatpur (Raj) |
|