Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Expansion Project of M/s Ispat Damodar Pvt. Ltd. in village- Nabagram, PO. Digha, PS: Neturia, Dist. Purulia, West Bengal
(b)Name of the Company / Organisation ISPAT DAMODAR PRIVATE LIMITED
(c)Registered Address 4th Floor, 37 Shakespeare Sarani,Kolkata,Kolkata,West Bengal-700017
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Vikas Bansal
(b)Designation (Owner/ Partner/ CEO) Director
(c)Address 37, Shakespeare Sarani,Kolkata,Kolkata,Kolkata,West Bengal-700017
(d)Pin code 700017
(e)E-mail idplacc@gmail.com
(f)STD Code. 0(f)Telephone No. 40138600
(g)Fax No. 22871400
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity2(b) Mineral beneficiation
3(a) Metallurgical industries (ferrous & non ferrous)
3(b) Cement plants
Minor Activity
(b)Category A
(c)Proposal Number IA/WB/IND/90432/2017
(d)Master Proposal Number(Single Window) SW/90386/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 1
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 146 to 155, 157 to 171, 175, 184, 185, 187 to 190,
(b)Pincode 700017
(c)Bounded Latitudes (North)
From
Degree 23.51944444
Minutes
Second
From
Degree 23.64888889
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 86.79416667
Minutes
Second
From
Degree 86.79888889
Minutes
Second
(e)Survey of India Topo Sheet No. 73I/4 (F45C14)
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 120
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 20
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project West Bengal
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)MaharashtraSindhudurgKankavliNardave
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number J-11011/52/2017-IA-II(I)
(b)Date of Apply of TOR 17 Jan 2020
(c)Date of Issue of TOR / Standard ToR 10 Feb 2020
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :29 Oct 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :29 Nov 2018
Distance of Public Hearing Venue from the Proposed Project :22
Sub-divisional office, Raghunathpur
State :West Bengal
District :Purulia
Tehsil :Raghunathpur
Village :Raghunathpur
36Employment to local youth on priority basis, Efficient Management and control of Pollution Control Devices, Expressed dissatisfaction over the functioning of the present pollution control devices, indOthersAdditional District, WBCS (Exe Magistrate(G)
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Ferro Alloys6X7.5 MVA
(2.)Captive Power Plant WHRB and Dolochar AFBC48 MW
(3.)Induction Furnace2x4T 1X8T 2X15T
(4.)Electric Arc Furnace1x20T
(5.)Laddle Refining and Tilting Furnace1x20T
(6.)Continuous Casting Machine2x6/11 mtrs.
(7.)Cement Grinding Plant300000 TPA
(8.)VOD/VID/AOD1X20T
(9.)Spong iron Plant165000 TPA
(10.)Iron Ore Beneficiation and Palletisation Plant600000 TPA
(11.)Rolling Mil with preheating furnace200000TPA
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Iron Ore Benefication and pelletization plant600000Tons per AnnumRoad,Rail
(2.)Electric Arc Furnace20OthersTonnesRoad,Rail
(3.)VOD/VID/AO20OthersTonnesRoad,Rail
(4.)Laddle Refining and Tilting Furnace20OthersTonnesRoad,Rail
(5.)Cement Grinding Plant300000Tons per AnnumRoad
(6.)Ferro Alloy (Ferrochrome/Manganese/silico manganaese/sillicon)45OthersMVARoad,Rail
(7.)Spong Iron Plant165000Tons per AnnumPipe Conveyor
(8.)Induction Furnace46OthersTonnesRoad,Rail
(9.)Continuous Casting Machine0.55OthersMetersRoad,Rail
(10.)Rolling Mill with preheating furnace200000Tons per AnnumRoad
(11.)Captive Power Plant WHRB + Dolochar AFBC48Mega Watt(MW)Road,Rail
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 30 Oct 2018
(iv)Valid Upto 30 Oct 2023
(v)File No. COO110173
(vi)Application No. 2076- WPBA/Red(Prl)/Cont(210)/10
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 190
(b) Funds Allocated for Environment Management (Capital) (in Crores) 9.62
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 1.225
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.95
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 3649410
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 3649410
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Chromite ore Bariquttes153900Tons per AnnumOwn PlantRoad0 OthersOwn PlantCopy of Linkage
(2.)Low Ash Metallurgical Coke53460Tons per AnnumImported Coal from AustraliaRoad,Rail350 Open MarketCopy of Linkage
(3.)Iron Scrap53400Tons per AnnumLocal Rolling MillRoad20 Open MarketCopy of Linkage
(4.)Limestone9000Tons per AnnumSundergarh AreaRoad375 Open MarketCopy of Linkage
(5.)Coke40582Tons per AnnumOwn ProductionRoad0 OthersOwn PlantCopy of Linkage
(6.)Quartz84000Tons per AnnumMines in ChhattisgarhRoad,Rail707 Open MarketCopy of Linkage
(7.)Fe-Mn Slag53460Tons per AnnumOwn PlantRoad0 OthersOwn PlantCopy of Linkage
(8.)MS Round1140Tons per AnnumSAIL/TISCORoad,Rail325 Open MarketCopy of Linkage
(9.)Pig Iron48300Tons per AnnumLocal MarketRoad325 Open MarketCopy of Linkage
(10.)Cashing Sheets891Tons per AnnumSAIL/TISCORoad,Rail325 Open MarketCopy of Linkage
(11.)Fly ash105000Tons per AnnumOwn PlantRoad0 OthersOwn PlantCopy of Linkage
(12.)Coke breeze & fines9000Tons per AnnumDurgapur Steel PlantRoad60 Open MarketCopy of Linkage
(13.)Low Ash Metallurgical Coke71280Tons per AnnumDurgapur Steel PlantRoad,Rail60 Open MarketCopy of Linkage
(14.)Purchased Coal and Coke214500Tons per AnnumNearby Coal Mines of ECL and BCCLRoad,Rail25 Open MarketCopy of Linkage
(15.)Sponge Iron111350Tons per AnnumOwn PlantRoad0 OthersOwn PlantCopy of Linkage
(16.)Ferro Alloy2760Tons per AnnumOwn PlantRoad0 OthersOwn PlantCopy of Linkage
(17.)Lime6880Tons per AnnumSundergarh AreaRoad,Rail325 Open MarketCopy of Linkage
(18.)Billets214000Tons per AnnumOwn PlantRoad0 OthersOwn PlantCopy of Linkage
(19.)Furnace oil8400OthersKLLocal Oil TerminalsRoad10 Open MarketCopy of Linkage
(20.)Clinker180000Tons per Annumfrom neighboring cement unitsRoad25 Open MarketCopy of Linkage
(21.)Bentonite3000Tons per AnnumLocal MarketRoad325 Open MarketCopy of Linkage
(22.)Electrode Paste1782Tons per AnnumDurgapur AreaRoad,Rail60 Open MarketCopy of Linkage
(23.)Iron Ore fines825000Tons per AnnumMines in Barbil/Joda of OdishaRail400 Open MarketCopy of Linkage
(24.)Iron ore pellets264000Tons per AnnumMines in Barbil/Joda OdishaRoad,Rail400 Open MarketCopy of Linkage
(25.)Graphite Electrode860Tons per AnnumDurgapur AreaRoad60 Open MarketCopy of Linkage
(26.)Chromite Ore Friable Lump10287Tons per AnnumSukinda Jajpur OdishaRoad,Rail371 Open MarketCopy of Linkage
(27.)Manganese ore159442Tons per AnnumChhattisgarh AreaRoad,Rail707 Open MarketCopy of Linkage
(28.)Iron Ore Concentrate660000Tons per AnnumIn HouseRoad0 OthersIn House ProductionCopy of Linkage
(29.)Iron Scrap14700Tons per AnnumOwn ProductionRoad,Rail0 OthersOwn PlantCopy of Linkage
(30.)Electrode Paste2025Tons per AnnumMaharashtra Carbon Ltd.Road,Rail456 Open MarketCopy of Linkage
(31.)GYPSUM15000Tons per AnnumIFFCO and PPLRoad,Rail444 Open MarketCopy of Linkage
(32.)Char/Charcoal63000Tons per AnnumLocal MarketRoad,Rail25 Open MarketCopy of Linkage
(33.)Dolomite8250Tons per AnnumMines in North BengalRoad,Rail70 Open MarketCopy of Linkage
(34.)Chromites Ore Hard Lump25759Tons per AnnumSukinda Jajpur, OdishaRoad,Rail371 Open MarketCopy of Linkage
(35.)Coal23734Tons per AnnumNearby Coal Mines of ECL and BCCLRoad,Rail25 Open MarketCopy of Linkage
(36.)Dolomite41630Tons per AnnumSundergarh AreaRoad,Rail375 Open MarketCopy of Linkage
(37.)Manganese ore272918Tons per AnnumOMC Manganese Mines OdishaRoad,Rail369 Open MarketCopy of Linkage
(38.)Coal183535Tons per AnnumCoalfield of ECL and BCCLRoad,Rail50 Open MarketCopy of Linkage
(39.)Quartzite22599Tons per AnnumMines in Bankura, West BengalRoad,Rail50 Open MarketCopy of Linkage
(40.)DRI Flue Gas105000Othersnm3/hr at 950-1000 degree CelsiusOwn PlantOthersDuct0 OthersOwn PlantCopy of Linkage
(41.)Dolochar4585Tons per AnnumOwn PlantRoad0 OthersOwn PlantCopy of Linkage
(42.)Coal Fines14850Tons per AnnumOpen MarketRoad20 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Oct 2017 To 31 Dec 2017
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube41.530.241.3560
(2.)NOxMicro Gram per Meter Cube16.89.516.480
(3.)OthersCOMili Gram per Meter Cube0.30.20.294
(4.)PM10Micro Gram per Meter Cube71.852.171.05100
(5.)SO2Micro Gram per Meter Cube11.29.110.5580
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TSSmg/l0000
(2.)pHNA7.857.066.58.5
(3.)Heavy MetalsZincmg/l0.050.05515
(4.)Total Hardnessmg/l410320200600
(5.)TDSmg/l4153215002000
(6.)Chloridesmg/l67402501000
(7.)Fluoridemg/l0.810.6311.5
    14.3.     No. of Surface Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.917.53C
(2.)DOmg/l8.25.6C
(3.)BODmg/l2.81.2C
(4.)CODmg/l00C
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))72.540.875
(2.)Leq(Night)A-weighted decibels(dB(A))55.134.670
    14.5.     No. of Soil Sample Monitored locations : 6
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Kilogram per hectare342183
(2.)Electric ConductivityMillisiemens per Centimetre192106
(3.)pHOthersNA7.136.54
(4.)P(Phosphorus)Kilogram per hectare5328
(5.)K(Potassium)Kilogram per hectare21292
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 5
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 2 To 5
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface30287Copy of Permission LetterCanalBarrageMRO/Tariff Cell/-11522 Jan 2014909.22
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic Waste Water7272Settling Tank, Neutralization PlantOthersZero Discharge720
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 72
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 72
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)SlagIndustrial Waste20440Tons0Conveyor BeltOthersSold to Cement Manufacturers
(2.)Fe-Cr SlagIndustrial Waste128115Tons0Pipe ConveyorOthersused in road construction if non hazardous
(3.)Waste from WHRB and FBC boilerBottom Ash18250Tons0Pipe ConveyorOthersSold to Brick Manufacturers
(4.)Sludge from neutralization tankHazardous Waste (as per Hazardous and Other Waste Management rules 2016)255.2Tons0Pipe ConveyorOthersDisposed in impervious pits
(5.)DolocharIndustrial Waste60225Tons0Conveyor BeltOthersUsed in FBC Boiler for power generation
(6.)Coal FinesIndustrial Waste21717.5Tons0Conveyor BeltOthersUsed in FBC boiler
(7.)Dust from ESP and Bag Filters of DRIIndustrial Waste20075Tons0Conveyor BeltOthersFly Ash Brick Making and Low Land filling
(8.)Waste from WHRB and FBC boilerFly Ash130670Tons0Pipe ConveyorOthersused in cement making
(9.)Dust from APC deviceIndustrial Waste10950Tons0Conveyor BeltOthersRecycled back to the process
(10.)Kiln AccretionIndustrial Waste13687.5Tons0Conveyor BeltOthersUsed for Road Making
(11.)Si-Mn SlagIndustrial Waste99645Tons0Pipe ConveyorOthersUsed as road construction material
(12.)Fe-Si SlagIndustrial Waste7117.5Tons0Pipe ConveyorOthersUsed as Road Construction Material
(13.)Fly ashFly Ash130670Tons0Pipe ConveyorOthersused in cement making
(14.)Used Oil/LubricantsHazardous Waste (as per Hazardous and Other Waste Management rules 2016)438Tons0Pipe ConveyorTreatment, Storage and Disposal Facility(TSDF)
(15.)Fe-Mn SlagIndustrial Waste120815Tons0Pipe ConveyorOthersUsed as raw material for Si-Mn
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube71.810.8872.68100
(2.)NOxMicrogram per Meter Cube16.812.3619.1780
(3.)PM2.5Microgram per Meter Cube41.51041.660
(4.)SO2Microgram per Meter Cube11.111.3012.4580
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DRI 2X100 TPDCoal Fines522SO230.9
(2.)DRI 2X100 TPDDolochar, Coal Fines522PM100.58
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 77000
(b)Source Damodar Valley Corporation
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 1 DG set of capacity 500 KVA
(e)Stack Height (in m) 60
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 22.36
(c)Government Land (ha.) 19.32
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 41.68
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 20084
(b)Waste/Barren Land (ha.) 390
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 3165
(e)Settlements (ha.) 5567
(f)Industrial (ha.) 19
(g)Forest (ha.) 1441
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Mining, Open Forest, Plantation 762
    Total (ha.) 31428.0000
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant16.59
(2.)OthersStorage Yard4.85
(3.)Area for Solid Waste Management2.43Ash and Solid Waste Disposal
(4.)Green belt13.76
(5.)Water Reservoir1.62
Total (ha.) 39.25
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSBallavpur79Away from project site
(2.)Wildlife CorridorsNA0Not Present
(3.)Critically Polluted AreaNA0Not Present
(4.)CorridorsNA0Not Present
(5.)NPANA0Not Present
(6.)ESAsNA0Not Present
(7.)ESZsNA0Not Present
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestSudarban300Away from project site
(2.)Archaeological SitesNA0Not Present
(3.)Defence InstallationsNA0Not Present
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 43.42
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Private land
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R NA
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Damodar River
(ii)Direction of Water Bodies in Buffer Area North East
(iii)Distance of Water Bodies in Buffer Area 4.50
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 500
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 330
(f)Total Manpower 500
32.
Green Belt in Ha:
(a)Total Area of Green Belt 13.75
(b)Percentage of Total Project Area 32.99
(c)No. of Plants to be Planted 5600
(d)Funds Allocated for Plantation 3500000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialEmployment Generation
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 1
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1720/RA 0119
(ii)Name of the EIA Consultant Centre for Envotech & Management Consultancy Pvt.
(iii)Address N-5/305, IRC Village, Nayapalli, Bhubneshwar-751015
(iv)Mobile No. 9861032826
(v)Landline No. 0674236034
(vi)Email Id cemc_consultancy@yahoo.co.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 1
(ix)Validity of Accreditation 18 Jan 2021
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAProposal is returned due to the following shortcomings: Form 2: i. In Sl. No. 2, documents in support of the competence/authority of the person making this application i.e., Shri. Vikas Bansal shall be submitted. ii. In Sl. No.4, not able to access the KML file. Appropriate KML file shall be uploaded. iii. In Sl.No. 7.1, entire PH proceedings inter-alia including SPCB cover letter, actual proceedings, authenticated English translation, attendance sheet, written representations and the response submitted shall be uploaded. iv. In Sl.no.26, out of the total land 41.68 ha, only 31.57 ha have been acquired. Remaining 10.12 ha is yet to be acquired. Consent of the land owners for said land acquisition shall be submitted as mandated under the requirement of MoEF&CC O.M. dated 7/10/2014. v. Certified copy of the compliance report of CTO conditions from Regional Office of SPCB shall be submitted as per specific ToR no. (v). EIA report i. Plant layout submitted is illegible. Layout indicating the dimensions of existing unit as well as proposed unit including storage area, plant area, greenbelt area, utilities etc. shall be submitted. ii. BOD values are reported as 1.2 mg/lit. Analysis method used for BOD estimation shall be submitted. iii. Cumulative AAQ modeling for the worst case scenario shall be submitted. iv. HIRA is not project specific. v. PP shall submit the EMP Matrix indicating; EMP details, Time line for implementation; Budgetary Provisions and Monitoring Schedule and monitoring methodology. 13 Oct 2020
2.NAThe correction have been made as per the instruction received 17 Nov 2020
3.NAWith respect to the EDS sought on 13/10/2020, Point wise replies along with the requisite supporting documents have not been furnished. It is once again requested to upload the same. 17 Nov 2020
4.NAThe correction have been made as per the instruction received 17 Nov 2020
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantVikas Bansal
DesignationDirector
Name of Company (Applicant Name should not be given here)ISPAT DAMODAR PRIVATE LIMITED
Address4th Floor, 37 Shakespeare Sarani