Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Nardave Medium Irrigation Project Village Nardave, Tal - Kankavali, Dist – Sindhudurg Maharashtra
(b)Name of the Company / Organisation MEDIUM PROJECT DIVISION AMBADPAL
(c)Registered Address The Office of the Executive Engineer, Medium Project Division, Ambadpal Tal Kudal Dist Sindhudurg,,Sindhudurg,Maharashtra-416520
(d)Legal Status of the Company State Government
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Makarand Myakal
(b)Designation (Owner/ Partner/ CEO) Executive Engineer
(c)Address The Office of the Executive Engineer, Minor Irrigation Division Oras, Tal Kudal Dist Sindhudurg,,,Sindhudurg,Maharashtra-416812
(d)Pin code 416812
(e)E-mail eempd.ambdpalwrd@maharashtra.gov.in
(f)STD Code. 2362(f)Telephone No. 228529
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity1(c) River Valley projects
Minor Activity
(b)Category A
(c)Proposal Number IA/MH/RIV/62328/2017
(d)Master Proposal Number(Single Window) SW/90376/2019
(e)EAC concerned (for category A Projects only) River Valley and Hydroelectric Projects
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 00
(b)Pincode 416609
(c)Bounded Latitudes (North)
From
Degree 16.19
Minutes
Second
From
Degree 16.20
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 73.88
Minutes
Second
From
Degree 73.90
Minutes
Second
(e)Survey of India Topo Sheet No. 47 H 11 12 15 16
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 508
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Maharashtra
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)MaharashtraSolapurMoholChincholi
(2.)MaharashtraSindhudurgKankavli
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number J-11020/7/2017 -IA-I (R)
(b)Date of Apply of TOR 08 Feb 2017
(c)Date of Issue of TOR / Standard ToR 10 Oct 2017
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :28 Jul 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :29 Aug 2018
Distance of Public Hearing Venue from the Proposed Project :10
Sangave Kanedi Bazar
State :Maharashtra
District :Sindhudurg
Tehsil :Kankavli
Village :Sangave Kanedi Bazar
150People are demanding 100% land acquisition compensation and rehabilitation facilities before Socio economic survey of the PAPs All the affected families should get four times compensationDistrict Collector
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Medium Irrigation Project - Earthen DamIrrigable Command Area 8084 hector
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Irrigable Command Area8084HectaresOthersNA
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 446.7076
(b) Funds Allocated for Environment Management (Capital) (in Crores) 5.171123
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.3134
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 1
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? Yes
a)Protected areas notified under the wildlife (Protection) Act, 1972 Yes
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 324494
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 324494
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Muck324494OtherscumSubmergenceRoad0 OthersSubmergenceCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Oct 2017 To 31 May 2018
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube29.112.528.560
(2.)NOxMicro Gram per Meter Cube22.711.922.180
(3.)SO2Micro Gram per Meter Cube21.611.520.880
(4.)PM10Micro Gram per Meter Cube55.435.854100
    14.2.     No. of Ground Water monitoring locations : 9
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TDSmg/l2721225002000
(2.)pHNA7.547.398.58.5
(3.)Total Hardnessmg/l133.4264.49200600
(4.)Fluoridemg/l0.10.11.01.5
(5.)TSSmg/l5500
(6.)Chloridesmg/l22.16.352501000
    14.3.     No. of Surface Water monitoring locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)BODmg/l81E
(2.)pHNA7.547.42E
(3.)DOmg/l7.16.7E
(4.)CODmg/l275E
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))58.346.255
(2.)Leq(Night)A-weighted decibels(dB(A))42.838.545
    14.5.     No. of Soil Sample Monitored locations : 13
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pHOthersNA7.947.52
(2.)N(Nitrogen)Kilogram per hectare298238.1
(3.)P(Phosphorus)Kilogram per hectare8.586.96
(4.)K(Potassium)Kilogram per hectare193.3172.2
(5.)Electric ConductivityOthersµS/cm757578
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 5
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 4 To 5
(c)Whether Ground Water Intersection will be there ? NA
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersMedium Irrigation Project00Copy of Permission LettermodeOthersOwn LiftWeirNot Applicable03 Jan 20190
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)NA00NAOthersNA00
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 0
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)OtherOthersMuck114593Tons0RoadOthersreused
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube55.40055.4100
(2.)SO2Microgram per Meter Cube21.60021.680
(3.)NOxMicrogram per Meter Cube22.7022.7080
(4.)PM2.5Microgram per Meter Cube22.70022.760
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)NA000OthersNA0
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 0
(b)Source NA
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) NA
(e)Stack Height (in m) 0
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 34.14
(b)Private Land (ha.) 585.772
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 11.25
(e)Other Land (ha.) 0
    Total Land (ha.) 631.162
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 5049.274
(b)Waste/Barren Land (ha.) 3050.726
(c)Grazing/ Community Land (ha.) 3005.338
(d)Surface Water Bodies (ha.) 241.4592
(e)Settlements (ha.) 1466.266
(f)Industrial (ha.) 0
(g)Forest (ha.) 7384.204
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Vegetation 3933.792
    Total (ha.) 24131.0592
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)OthersProject work631.162
Total (ha.) 631.162
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)ESZsNardave0NA
(2.)CorridorsNA0NA
(3.)Wildlife CorridorsNA0NA
(4.)WLSRadhanagari Wild Life Sanctuary0.75The Radhanagari Wild Life Sanctuary situated 0.75 to 2 km away from the project site
(5.)ESAsNardave0Na
(6.)NPANA00
(7.)Critically Polluted AreaNA00
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestRadhanagari Wild Life Sanctuary0.75The Radhanagari Wild Life Sanctuary situated 0.75 to 2 km away from the project site
(2.)Archaeological SitesNA0NA
(3.)Defence InstallationsNA0NA
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? Yes
(a)Forests Clearance Status In-Principle(Stage-I) Approval Obtained
(i)MoEFCC file number FP/MH/IRRIG/1515/2011
(ii)Date of In-Principle (Stage-I) approval 30 Sep 2014
(iii)Area diverted 34.115
(iv)Uploaded FC Letter Copy of FC Letter
(b)Legal Status of Forest Land Private
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 1155
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 566.657
(b)Land yet to be acquired(Ha) 64.505
(c)Status of Land acquisition if not acquired Remaining land acquisition in in progress
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 5
(b)No. of Households 967
(c)No. of PDFs (Project Displaced Families) 967
(d)No. of PAFs (Project Affected Families) 967
(e)Funds Allocated for R&R(in INR) (in Lacs) 7840.832
(f)Status of R&R In-Progress
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 20
(b)Permanent Employment-During Operation 7
(c)Temporary Employment- During Construction 35
(d)Temporary Employment- During Operation 0
(e)No. of working days 6
(f)Total Manpower 62
32.
Green Belt in Ha:
(a)Total Area of Green Belt 200
(b)Percentage of Total Project Area 31.69
(c)No. of Plants to be Planted 200000
(d)Funds Allocated for Plantation 140.07229
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.       Project Benefits
S. No. Type of Project BenefitsDetails of Project Benefits
NIL
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For River Valley and Hydroelectric Projects
S. No.Item Details
1. Project Sub Sector Irrigation Project
2. Name of the River Gad
3.
Whether Cumulative Impact Assessment and Carrying Capacity Study of River Basin is Carried Out? No
     4.      Type of Project: (Construction of Dam/ Barrage/ Run of the River/ Lift Irrigation Scheme)
S. No.Project TypeDam Height (in meters)Dam Length (in meters)Total Submergence Area (in hectare)Gross Command Area (GCA) (in hectare)Irrigable Command Area (ICA) (in hectare)Culturable Command Area (CCA) (in hectare)Total Command Area (in hectare)
(1.)Construction of Dam66.431749356.352126319978808430693
5.
Powerhouse Installed Capacity No
(a) Type of Powerhouse Surface
(b) Capacity (in megawatts) 0
(c) No. of Tunnels 0
(d) No. of Units 0
(e) Bank of River Both
6.
Generation of Electricity Annually.
(a) Quantity of Generation of Electricity Annually (in giga watt hours) 0
(b) Water Availability at Various percentage
S. No.PercentageWater availability (in cusecs)Dependable yearRemarks
(1.)75 %00Not Applicable; No Electricity Generation
(2.)50 %00Not Applicable; No Electricity Generation
(3.)90 %00Not Applicable; No Electricity Generation
(c) Machine Availability (in percent) 0
(d) Cost of Electricity Generation (in INR) 0
(e) Internal Rate of Return (in percent) 0
(f) Year of achievement of Internal Rate of Return 0
7. Catchment Area Treatment Plan Copy of Catchment Plan
8.
Muck Management Plan
(a)Muck Management Plan Copy of Muck Management Plan
(b) Total Excavation Muck (in cubic meter) 324494
(c) Utilized for Construction (in cubic meter)324494
(d) No. of Muck Disposal sites5
(e) Total Muck Disposal Area (in hectare)136
9.
Fishery Development and Management Plan
(a)Fishery Development and Management Plan Copy of Fishery Development and Management Plan
(b) No. of Fish Species 14
(c) Name of the umbrella Fish Species (Scientific Name)Labeo rohita
10.
Status of Environmental Flow
S. No.SeasonAverage Inflow (in cumec)Percent of Flow
(1.)Monsoon0.0000021125
(2.)Non-Lean Non-Monsoon0.0000016920
(3.)Lean0.0000016920
11. Free Flow Stretch (in km) 5
12.
Approval of Central Water Commission No
13.
Approval of Central Electricity Authority No
14.
Details of Coffer Dam (Upstream) None
15.
Details of Coffer Dam (Downstream) None
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1720/RA 0075
(ii)Name of the EIA Consultant MITCON Consultancy & Engineering Services Ltd.
(iii)Address MITCON Consultancy & Engineering Services Ltd. Environment Management and Engineering Division Behind DIC Office, Agri College Campus, Shivajinagar, Pune 411 005, Maharashtra (INDIA),
(iv)Mobile No. 9665043400
(v)Landline No. 0206628940
(vi)Email Id eme@mitconindia.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation River Valley and Hydroelectric Projects
(ix)Validity of Accreditation 17 Mar 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply Letterwe are herewith submitting the additional information sought as per Minutes of the 24th Meeting of the Expert Appraisal Committee for River Valley and Hydroelectric Projects held on 27.05.2019 Item No. 24.2 05 Sep 2019
2.NA

fter detailed deliberation on the information as presented and submitted to the Ministry, EAC defer the project for want of  information:

25 Jun 2019
3. ADS Reply LetterDear Sir, we are herewith submitting the additional information sought as per Minutes of the 21st Meeting of the Expert Appraisal Committee for River Valley and Hydroelectric Projects held on 28.01.2019 Item No. 21.5 26 Apr 2019
4.NANA 19 Feb 2019
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantMakarand Myakal
DesignationExecutive Engineer
Name of Company (Applicant Name should not be given here)MEDIUM PROJECT DIVISION AMBADPAL
AddressThe Office of the Executive Engineer, Medium Project Division, Ambadpal Tal Kudal Dist Sindhudurg