Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Kalyani Khani - 6 incline Underground Coal Mining Project
(b)Name of the Company / Organisation The Singareni Collieries Company Limited
(c)Registered Address M/s. Singareni Collieries Company Limited PO: Kothagudem Collieries - 507 101 Dist: KHAMMAM, T.Sr,,Khammam,Telangana-507101
(d)Legal Status of the Company State Government
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Shri G Venkateswara Reddy
(b)Designation (Owner/ Partner/ CEO) Director (Planning & Projects)
(c)Address Kothagudem P.O -507101 Bhadradri Kothagudem District,,,Bhadradri Kothagudem,Telangana-507101
(d)Pin code 507101
(e)E-mail gm_env@scclmines.com
(f)STD Code. 8744(f)Telephone No. 243059
(g)Fax No. 08744244115
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity1(a) Mining of minerals
Minor Activity
(b)Category A
(c)Proposal Number IA/TG/CMIN/90278/2017
(d)Master Proposal Number(Single Window) SW/90277/2019
(e)EAC concerned (for category A Projects only) Coal Mining
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Sy. No. 33, 38,40, 41, 43, 46, 47, 50, 56, 57, 58
(b)Pincode 504231
(c)Bounded Latitudes (North)
From
Degree 185739
Minutes
Second
From
Degree 185916
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 793023
Minutes
Second
From
Degree 793139
Minutes
Second
(e)Survey of India Topo Sheet No. 56 N/9
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 206
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 370
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Telangana
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)MaharashtraSindhudurgKankavliNardave
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA/TG.CMIN/64575/2017
(b)Date of Apply of TOR 03 May 2017
(c)Date of Issue of TOR / Standard ToR 15 May 2017
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :10 Mar 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :11 Apr 2018
Distance of Public Hearing Venue from the Proposed Project :2.00
Anganwadi School
State :Telangana
District :Mancherial
Tehsil :Mandamarri
Village :Sandronipalli
600Employment for the Project affected families. Instead of the partial land they have requested to acquire complete land. Planning for providing basic facilities to the local people like education, meOthersJoint Collector and Additional District Magistrate
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Kalyani Khani - 6 inclineUnderground Coal Mining Project
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Coal800000Tons per AnnumRoad,Rail
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 615.75
(b) Funds Allocated for Environment Management (Capital) (in Crores) 2.0475
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 6.1575
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 1.0636
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Water7290Kilo Litre per DayProject siteOthersPumping Arrangement0 OthersApprovalCopy of Linkage
(2.)Power10.841Mega Watt(MW)From 132 KV Mandamarri sub-stationOthers33 KV OHT Line7 Fuel Supply AgreementCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 11 Mar 2016 To 02 Jun 2016
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube745073.4250
(2.)PM2.5Micro Gram per Meter Cube41.525.841.3NS
(3.)NOxMicro Gram per Meter Cube31.415.731.3120
(4.)SO2Micro Gram per Meter Cube15.410.615.4120
    14.2.     No. of Ground Water monitoring locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.36.96.58.5
(2.)Chloridesmg/l242482501000
(3.)Fluoridemg/l1.841.321.01.5
(4.)Heavy MetalsTotal Chromiummg/l0.050.050.050.05
(5.)TSSmg/l0000
(6.)TDSmg/l8903025002000
(7.)Total Hardnessmg/l544260200600
    14.3.     No. of Surface Water monitoring locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l6.04.3E
(2.)BODmg/l81B
(3.)pHNA7.47.2E
(4.)CODmg/l3010E
    14.4.     No. of Ambient Noise monitoring locations : 6
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))59.552.275
(2.)Leq(Night)A-weighted decibels(dB(A))54.740.370
    14.5.     No. of Soil Sample Monitored locations : 4
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Kilogram per hectare351236
(2.)K(Potassium)Kilogram per hectare677240
(3.)Electric ConductivityMillisiemens per Centimetre0.8250.426
(4.)pHOthersNA7.37.2
(5.)P(Phosphorus)Kilogram per hectare2.11.2
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 11.13 To 2.70
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.72 To 10.57
(c)Whether Ground Water Intersection will be there ? Yes
(d)Upload Copy of Central Ground Water Authority Letter Copy of Central Ground Water Authority Letter
(e)Letter No. Lr.236/SCCL/2017
(f)Date of Issue 27 Dec 2017
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater40000Copy of Permission LetterPipelineOthersPumping236/SCCL/201727 Dec 20177290
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Mine water72900Settling PondsOthersInto local drainage40003290
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 7290
(b)Total Discharged Water (Kilolitre per Day) 3290
(c)Total Reused Water (Kilolitre per Day) 4000
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Shale & sand stoneOthersMine Waste58779Tons5RoadOthersUsed for low lying areas and plantation
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube00000
(2.)SO2Microgram per Meter Cube00000
(3.)NOxMicrogram per Meter Cube00000
(4.)PM2.5Microgram per Meter Cube00000
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)0000PM100
(2.)0000SO20
(3.)0000NOx0
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 10.841
(b)Source The source of power for the project will be from 1
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 0
(e)Stack Height (in m) 0
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 104.095
(b)Private Land (ha.) 71.98
(c)Government Land (ha.) 245.535
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 421.61
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 195.91
(b)Waste/Barren Land (ha.) 84.435
(c)Grazing/ Community Land (ha.) 24.64
(d)Surface Water Bodies (ha.) 11.27
(e)Settlements (ha.) 0
(f)Industrial (ha.) 0
(g)Forest (ha.) 104.095
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Roads 1.26
    Total (ha.) 421.61
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)OthersMine421.61
Total (ha.) 421.61
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNA00
(2.)WLSNA00
(3.)ESAsNA00
(4.)NPANA00
(5.)ESZsNA00
(6.)CorridorsNA00
(7.)Wildlife CorridorsNA00
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNil00
(2.)Defence InstallationsNil00
(3.)ForestBelampally RF1Stage I clerance accorded
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? Yes
(a)Forests Clearance Status In-Principle(Stage-I) Approval Obtained
(i)MoEFCC file number FP/TG/MIN/25689/2017
(ii)Date of In-Principle (Stage-I) approval 02 Nov 2018
(iii)Area diverted 0
(iv)Uploaded FC Letter Copy of FC Letter
(b)Legal Status of Forest Land Reserved
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 135.165
(b)Land yet to be acquired(Ha) 182.350
(c)Status of Land acquisition if not acquired Under Process
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R In-Progress
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Pala Vagu
(b)Whether there is Diversion Required ? Yes
(i)Details of Diversion Required 5.56
(ii)Details of Study Conducted Hydrogeological Studies
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Ralla vagu
(ii)Direction of Water Bodies in Buffer Area South West
(iii)Distance of Water Bodies in Buffer Area 2.45
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 738
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 365
(f)Total Manpower 738
32.
Green Belt in Ha:
(a)Total Area of Green Belt 177.75
(b)Percentage of Total Project Area 42.16
(c)No. of Plants to be Planted 444375
(d)Funds Allocated for Plantation 975000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialEducation facilities Banking facilities Post offices and communication facilities Medical facilities Recreation facilities Business establishments & community facilities Plantation and parks
(2.)FinancialNearly 738 employees will be employed
(3.)EnvironmentalOut of the total Project area 421.6 ha. An about 177. 75 ha shall be taken up as a green belt development. As an Underground Mine there shall not be much impact on the Air, Noise pollution.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Coal Mining
S. No.Item Details
     1.       No. of Mineral(s) to be Mined : 1
S. No.Mineral(s) to be Mined Major or Minor Mineral
(1.)CoalMajor
2.
Mine Capacity in ROM (Run of Mine) 0.80 MTPA
3.
Uploaded 500 meters Cluster Certificate from State Mines and Geology in case of minor minerals Copy of 500 meters Cluster Certificate from State Mines and Geology
4.
Mining Plan:
(a)Approval Letter No. NO.13016/7/2016-CA II
(b)Date of Approval 02 Sep 2016
(c)Approved Letter Copy of Approved Letter
(d)Approved By State Mining and Geology Department Coal
(e)Approved Mining Lease Area 421.61
(f)Approved Capacity 1.2303
5.
Technical Details:
(a)Total Geological Reserves (Million Ton) 59.196
(b)Mineable Reserves (Million Ton) 36.89
(c)Extractable Reserves(Million Ton) 15.65
(d)Percent(%) of Extraction 26.43
(e)Grade of Coal /Ore /Mineral G 12 & G 14
(f)Stripping Ratio 0 : 0
(g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) Degree 1
(h)Average Gradient(Degree) 1 in 5.5
(i)Mining Method Underground
(j)Life of Mine (Years) 19
6.
Details of Beneficiations:
(a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area No
(b)Whether it is proposed to install crusher within the mining lease area No
7.
Details of Seams:
(a)Whether details of seam applicable Yes
(b)No. of seams 2
(c)Thickness of seams to be worked on 4.59
(d)Maximum Thickness of Seams (metres) 6.84
8.
Details of Mining Lease:
(a)Mining Lease Area (in Hectare) 421.61
(b)Whether obtained Letter of Intent (LOI) from the state government ? Yes
(i)Copy of Letter of Intent Copy of Letter of Intent
(ii)Date of issue of LOI 12 Jan 2015
(iii)Validity of LOI 20
(iv)Reference No. of LOI GO MS no. 01
(c)Whether Lease Deed Executed ? No
(i)Reason thereof After EC
(d)Whether Lease Deed Renewed ? No
(i)Reason thereof After EC
9.
OB (Over Burden) Management:
Details Not Applicable
10.
Details of Topsoil Management:
(a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre)
(b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre)
(c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre)
11.
Details of Final Mine Void:
(a)Area (in Hectare)
(b)Depth (in meter)
(c)Volume (in Million Cubic meter)
12.
Details of Quarry:
(a)Final Void of (hectare) at a Depth of meter which is Proposed to be Converted into a Water Body.
(b)Total Quarry Area (ha)
13.
Details of Transportation:
(a)In Pit/Underground to Surface Belt Conveyor
(b)Surface to Siding/Loading Trucks
(c)Transportation / Conveyor Details by Road
     14.      Details of Land Usage (Pre-Mining)
S. No.LAND USE Other LAND USEWITHIN ML AREA (Hectare)OUTSIDE ML AREA (Hectare)TOTAL (Hectare)
(1.)SURFACE WATER BODIES11011
(2.)FOREST LAND1050105
(3.)WASTE LAND84084
(4.)AGRICULTURE LAND1960196
(5.)GRAZING LAND25025
(6.)SETTLEMENTS000
TOTAL4210421
     15.      Details of Land Usage (Post-Mining)
S. No.LAND USE Other LAND USEPlantation (ha)Water Body (ha)Public Use (ha)Undisturbed (ha)Total
(1.)INTERNAL OB DUMPS0000
(2.)EXTERNAL OB DUMPS0000
(3.)BUILT UP AREA (COLONY/OFFICE)8.28008.28
(4.)ROADS001.261.26
(5.)GREEN BELT16400164
(6.)VIRGIN AREA00239.26239.26
(7.)EXCAVATION/QUARRY0000
(8.)TOP SOIL STORAGE0000
(9.)OtherPalavagu, Tank & Palavagu diversion63.3409.34
TOTAL178.283.34240.520422.14
16.
Details of Reclamation:
Total Afforestation Plan shall be Implemented Covering of Mining.
This will Include:
(a)External OB Dump(in hectare)
(b)Internal Dump(in hectare)
(c)Quarry(in hectare)
(d)Safety Zone(in hectare)
(e)Final Void of (hectare) at a Depth of meter which is Proposed to be Converted into a Water Body.
(f)Density of Tree Plantation per ha (in no.)
(g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc)
(h)Total afforestation plant (in hectare)
17.
Status of progressive Mining Closure Plan:
Details Not Applicable
     18.      Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception:
S. No.Financial Year Sanctioned Capacity as per EC (MTPA)Sanctioned Capacity as per CTOSanctioned Capacity as per approved mining planActual Production Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA)
(1.)000000
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET Certificate No. & Issue Date: Certificate No
(ii)Name of the EIA Consultant Environment Protection Training & Research Institu
(iii)Address 91/4 Gachibowli, Hyderabad
(iv)Mobile No. 9885236493
(v)Landline No. 0406756751
(vi)Email Id dgeptri@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Coal Mining
(ix)Validity of Accreditation 29 May 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAPlease inform/clarify the following:- - Details of study area as mentioned in column 21 of Form-2 needs to be re-looked and confirmed for its correctness. - Land acquisition status for 182.35 ha of land. - Status of execution of mining lease. 19 Apr 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantShri G Venkateswara Reddy
DesignationDirector (Planning & Projects)
Name of Company (Applicant Name should not be given here)The Singareni Collieries Company Limited
AddressKothagudem P.O -507101 Khammam Dt
Print