Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Pauni-II Expansion OC (Phase-I)
(b)Name of the Company / Organisation Western Coalfields Limited
(c)Registered Address Coal Estate Civil lines, Nagpur-440001,Coal Estate Civil lines, Nagpur-440001,Nagpur,Maharashtra-440001
(d)Legal Status of the Company Central PSU
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Kaushik Chakraborty
(b)Designation (Owner/ Partner/ CEO) G.M (MINING)/ ENVIRONMENT.
(c)Address NIL
(d)Pin code 440001
(e)E-mail gmenvironment.wcl@coalindia.in
(f)STD Code. 712(f)Telephone No. 2510151
(g)Fax No. 2510151
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity1(a) Mining of minerals
Minor Activity1(a) Mining of minerals
(b)Category A
(c)Proposal Number IA/MH/CMIN/90274/2016
(d)Master Proposal Number(Single Window) SW/90269/2019
(e)EAC concerned (for category A Projects only) Coal Mining
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. latitudes N 190 48’ 19” and 190 49’ 27” and Longit
(b)Pincode 442905
(c)Bounded Latitudes (North)
From
Degree 19.8052777
Minutes
Second
From
Degree 19.8241666
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 79.230
Minutes
Second
From
Degree 79.2702777
Minutes
Second
(e)Survey of India Topo Sheet No. 56 M/1 and 56 M/5
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 200.29
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0.00
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Maharashtra
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-11015/80/2016-IA-II(M)
(c)Date of Issue of TOR 30 Mar 2017
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 11 Jan 2019
(c)Date of Issue of EC 28 Mar 2019
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :30 Oct 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :01 Dec 2018
Distance of Public Hearing Venue from the Proposed Project :6
Manoranjan Kendra, Sasti colony, Near CGM office, WCL Ballarpur area, Tehsil Rajura, Dist. Chandrapur, Maharashtra
State :Maharashtra
District :Chandrapur
Tehsil :Rajura
Village :Pauni
3251. New approach road to the agriculture fields of nearby villagers 2. Water scarcity in nearby villages 3. Compensation to the farmers encroached land of state government revenue department. 4. NalOthersADM
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Nagpur
(iii)Letter No. 3-10/2006(env)/4731
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Sep 24 2018 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)coal0.602.653.25OthersMillion Tonnes per AnnumRoad,Rail
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Coal MineOpencastOpencastOpencastExpansion of existing OC coal mine
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 17 Dec 2018
(iv)Valid Upto 31 Jan 2022
(v)File No. 0000039454
(vi)Application No. MPCB-CONSENT-0000039454
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 483.6948
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.9709
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 1.95
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 700
(b)Existing quantity of raw material/fuel 135.12
(c)Total quantity of raw material/fuel 835.12
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Power475.8Mega Watt(MW)MSEDCLOthersTranmission Lines20 Fuel Supply AgreementCopy of Linkage
(2.)Explosives192197.5OthersKG/AnnumCIL approved VendorsRoad0 Fuel Supply AgreementCopy of Linkage
(3.)Diesel135.12Kilo Litre per DayIOCLRoad0 Fuel Supply AgreementCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Nov 2015 To 31 Jan 2016
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube472245.260
(2.)SO2Micro Gram per Meter Cube16.38.215.880
(3.)NOxMicro Gram per Meter Cube20.312.319.880
(4.)PM10Micro Gram per Meter Cube854081.8300
    14.2.     No. of Ground Water monitoring locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.57.36.58.5
(2.)Fluoridemg/l1.80.521.01.5
(3.)TDSmg/l4704605002000
(4.)TSSmg/l1612100100
(5.)Chloridesmg/l24122501000
(6.)OthersTotal AlkalinityOthersmg/L as CaCO3330318200600
(7.)Total HardnessOthersmg/L as CaCO3364330200600
    14.3.     No. of Surface Water monitoring locations : 2
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.47.2C
(2.)BODmg/l2.42.0C
(3.)CODmg/l5.63.2C
(4.)DOmg/l7.46.2C
    14.4.     No. of Ambient Noise monitoring locations : 6
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))44.741.845
(2.)Leq(Day)A-weighted decibels(dB(A))53.745.655
    14.5.     No. of Soil Sample Monitored locations : 3
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pHOthersNA6.66.3
(2.)N(Nitrogen)Kilogram per hectare314.5304.1
(3.)K(Potassium)Kilogram per hectare156.6148.0
(4.)Electric ConductivityOthersm-mhos/cm at 20 degree celcius0.530.50
(5.)P(Phosphorus)Kilogram per hectare33.929.4
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 10.2 To 7.75
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 3.3 To 7.62
(c)Whether Ground Water Intersection will be there ? Yes
(d)Upload Copy of Central Ground Water Authority Letter Copy of Central Ground Water Authority Letter
(e)Letter No. application no-21-4/728/MH/MIN/2017 dated 19.01.20
(f)Date of Issue 19 Jan 2017
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater8800Copy of Permission LetterPipelineOthersDirect pumping of mine waterapplication no-21-4/728/MH/MIN/201719 Jan 2017880
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Mine water8801392SwdimentationReuse within the Plant & Recycling880
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 880
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 880
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)OverburdenOthersSoil and rocks from coal mine42328000Tons0.15Road,Othersby dumpers through Internal roadsOtherson surface as well as within mine void
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube370.2584560
(2.)NOxMicrogram per Meter Cube390.2544380
(3.)SO2Microgram per Meter Cube210.2522380
(4.)PM10Microgram per Meter Cube610.2528.1289.12100
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)NANA00NOx0
(2.)NANA00PM100
(3.)NANA00SO20
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 4636
(b)Source MSEDCL
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 0
(e)Stack Height (in m) 0
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 1034.99
(c)Government Land (ha.) 60.53
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 1095.52
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 718.69
(b)Waste/Barren Land (ha.) 60.53
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 316.30
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Nil 0
    Total (ha.) 1095.52
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Quarry Area273.79
(2.)OB Dump Area244.90
(3.)Safety Zone200Blasting zone
(4.)Township12Infrastructure and colony
(5.)Area for Solid Waste Management58.93Temporary top soil dump
(6.)OthersArea for rationalisation305.90Area for rationalisation
Total (ha.) 1095.52
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNot applicable0Not applicable
(2.)NPANot applicable0Not applicable
(3.)CorridorsNot applicable0Not applicable
(4.)ESAsNot applicable0Not applicable
(5.)ESZsNot applicable0Not applicable
(6.)Wildlife CorridorsNot applicable0Not applicable
(7.)WLSNot applicable0Not applicable
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)OthersNot applicableNot applicable0Not applicable
(2.)Archaeological SitesNot applicable0Not applicable
(3.)Defence InstallationsNot applicable0Not applicable
(4.)ForestNot applicable0Not applicable
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) Not Applicable
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 1066.41
(b)Land yet to be acquired(Ha) 29.11
(c)Status of Land acquisition if not acquired Under process
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R In-Progress
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Lendi nallah and Sakhari nallah
(b)Whether there is Diversion Required ? Yes
(i)Details of Diversion Required Seasonal nallah
(ii)Details of Study Conducted yet to be conducted
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Wardha River
(ii)Direction of Water Bodies in Buffer Area North
(iii)Distance of Water Bodies in Buffer Area 6.6
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 107
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 193
(e)No. of working days 330
(f)Total Manpower 300
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt10759.40769.4
(2.)Percentage of Total Project Area0.8665.8866.74
(3.)No. of Plants2500018985001923500
(4.)Funds Allocated2820000265790000268610000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialThe project will lead to development of roads, ancillary industries, Improvement in social & living standards by providing opportunities of direct & indirect employment to local community
(2.)EnvironmentalConservation of coal. Also it will lead to positive environmental impacts like green cover, mine water utilization , etc.
(3.)FinancialA substantial percentage of population is dependent on mining industry directly or indirectly. Because of this mining project some of the local population may take direct employment but a substantial impact will be on creation of indirect job opportunities and employment.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Coal Mining
S. No.Item Details
     1.       No. of Mineral(s) to be Mined : 1
S. No.Mineral(s) to be Mined Major or Minor Mineral
(1.)CoalMajor
2.
Mine Capacity in ROM (Run of Mine) 3.25 MTPA
3.
Uploaded 500 meters Cluster Certificate from State Mines and Geology in case of minor minerals Copy of 500 meters Cluster Certificate from State Mines and Geology
4.
Mining Plan:
(a)Approval Letter No. WCL/BD/SECTT/BM-307/2018/830
(b)Date of Approval 26 Dec 2018
(c)Approved Letter Copy of Approved Letter
(d)Approved By State Mining and Geology Department WCL Board
(e)Approved Mining Lease Area 1095.52
(f)Approved Capacity 3.25
5.
Technical Details:
(a)Total Geological Reserves (Million Ton) 31.8
(b)Mineable Reserves (Million Ton) 27.23
(c)Extractable Reserves(Million Ton) 27.23
(d)Percent(%) of Extraction 85
(e)Grade of Coal /Ore /Mineral G-9
(f)Stripping Ratio 1 : 6.19
(g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) NA
(h)Average Gradient(Degree) 1 in 6 to 1 in 7
(i)Mining Method Opencast
(j)Life of Mine (Years) 13
6.
Details of Beneficiations:
(a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area No
(b)Whether it is proposed to install crusher within the mining lease area Yes
(c)No. of crushers 2
     6.1.    Details of crusher:
S. No.Crusher ID Capacity (in PH)Remarks
(1.)1205
(2.)2205
7.
Details of Seams:
(a)Whether details of seam applicable Yes
(b)No. of seams 2
(c)Thickness of seams to be worked on 10
(d)Maximum Thickness of Seams (metres) 10.95
8.
Details of Mining Lease:
(a)Mining Lease Area (in Hectare) 1095.52
(b)Whether obtained Letter of Intent (LOI) from the state government ? No
(i)Reason thereof Not applicable
(c)Whether Lease Deed Executed ? No
(i)Reason thereof Not applicable
(d)Whether Lease Deed Renewed ? No
(i)Reason thereof Not applicable
9.
OB (Over Burden) Management:
(a) Details of External Dumps:
(i)No. of OB Dumps
(ii)Total Area (in Hectare)
(iii)Height (in meter)
(iv)Quantity (in Million Cubic meter)
(v)No. of year back fill up
(b) Details of Internal Dumps:
(i)No. of Internal Dumps
(ii)Total Area (in Hectare)
(iii)Height (in meter)
(iv)Quantity (in Million Cubic meter)
10.
Details of Topsoil Management:
(a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) 18.30
(b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) 18.30
(c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) 0
11.
Details of Final Mine Void:
(a)Area (in Hectare)
(b)Depth (in meter)
(c)Volume (in Million Cubic meter)
12.
Details of Quarry:
(a)Final Void of 188.35 (hectare) at a Depth of 200 meter which is Proposed to be Converted into a Water Body.
(b)Total Quarry Area (ha) 295.35
13.
Details of Transportation:
(a)In Pit/Underground to Surface Dumpers
(b)Surface to Siding/Loading Tippers
(c)Transportation / Conveyor Details Road way
     14.      Details of Land Usage (Pre-Mining)
S. No.LAND USE Other LAND USEWITHIN ML AREA (Hectare)OUTSIDE ML AREA (Hectare)TOTAL (Hectare)
(1.)GRAZING LAND000
(2.)WASTE LAND000
(3.)AGRICULTURE LAND1034.9901034.99
(4.)OTHERS(Specify)Government Land60.53060.53
(5.)FOREST LAND000
(6.)SURFACE WATER BODIES000
(7.)SETTLEMENTS000
TOTAL1095.5201095.52
     15.      Details of Land Usage (Post-Mining)
S. No.LAND USE Other LAND USEPlantation (ha)Water Body (ha)Public Use (ha)Undisturbed (ha)Total
(1.)TOP SOIL STORAGE35.400035.4
(2.)INTERNAL OB DUMPS58.930058.93
(3.)GREEN BELT0000
(4.)VIRGIN AREA35000350
(5.)EXCAVATION/QUARRY107188.350295.35
(6.)ROADS0.5001.52
(7.)Otherundisterb area (no plantation)00186.41186.41
(8.)EXTERNAL OB DUMPS214.5700214.57
(9.)BUILT UP AREA (COLONY/OFFICE)30710
TOTAL769.4188.35194.9101152.66
16.
Details of Reclamation:
Total Afforestation Plan shall be Implemented Covering of Mining.
This will Include:
(a)External OB Dump(in hectare) 214.57
(b)Internal Dump(in hectare) 165.93
(c)Quarry(in hectare) 295.35
(d)Safety Zone(in hectare) 200
(e)Final Void of 188.35 (hectare) at a Depth of 200 meter which is Proposed to be Converted into a Water Body.
(f)Density of Tree Plantation per ha (in no.) 2500
(g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) 3.44
(h)Total afforestation plant (in hectare) 769.4
17.
Status of progressive Mining Closure Plan:
Copy of Implementation of Various Activities as per Approved Progressive Mine Closure Plan Copy of Implementation of Various Activities as per Approved Progressive Mine Closure Plan
Any Deviation from the Approved Progressive Mine Closure Plan No
Total Area Excavated (in hectare) 295.35
Total Area Backfilled after Excavation (in hectare) 107
Total Area Reclaimed (in hectare) 769.40
     18.      Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception:
S. No.Financial Year Sanctioned Capacity as per EC (MTPA)Sanctioned Capacity as per CTOSanctioned Capacity as per approved mining planActual Production Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA)
(1.)20170.600.600.600.510
(2.)20180.600.600.600.3060
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1720/RA0092
(ii)Name of the EIA Consultant CENTRAL MINE PLANNING AND DESIGN INSTITUTE LIMITED
(iii)Address Gondwana Place, Kanke Road, Ranchi-834031
(iv)Mobile No. 9421995343
(v)Landline No. 0651223185
(vi)Email Id gmenv.cmpdi@coalindia.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation Coal Mining
(ix)Validity of Accreditation 01 Oct 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAPlease inform/clarify the following:- - Re-validation of the existing EC dated 2/2/2006 as mandated under the Ministry's Notification dated 6/4/2018. - Action taken report on the observations of Regional Office during their site visit on 24/9/2018 (Report forwarded on 2/1/2019). 10 Jan 2019
2.NAThe correction have been made as per the instruction received 11 Jan 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantKaushik Chakraborty
DesignationG.M (MINING)/ ENVIRONMENT.
Name of Company (Applicant Name should not be given here)Western Coalfields Limited
AddressCoal Estate Civil lines, Nagpur-440001
Print