1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Pauni-II Expansion OC (Phase-I) | (b)Name of the Company / Organisation | Western Coalfields Limited | (c)Registered Address | Coal Estate Civil lines, Nagpur-440001,Coal Estate Civil lines, Nagpur-440001,Nagpur,Maharashtra-440001 | (d)Legal Status of the Company | Central PSU | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Kaushik Chakraborty | (b)Designation (Owner/ Partner/ CEO) | G.M (MINING)/ ENVIRONMENT. | (c)Address | NIL | (d)Pin code | 440001 | (e)E-mail | gmenvironment.wcl@coalindia.in | (f)STD Code. | 712(f)Telephone No. | 2510151 | (g)Fax No. | 2510151 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 1(a) Mining of minerals
| Minor Activity | 1(a) Mining of minerals
| (b)Category | A | (c)Proposal Number | IA/MH/CMIN/90274/2016 | (d)Master Proposal Number(Single Window) | SW/90269/2019 | (e)EAC concerned (for category A Projects only) | Coal Mining | (f)Project Type | Expansion |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | latitudes N 190 48’ 19” and 190 49’ 27” and Longit | (b)Pincode | 442905 | (c)Bounded Latitudes (North) | | From | | Degree | 19.8052777 | Minutes | | Second | | From | | Degree | 19.8241666 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 79.230 | Minutes | | Second | | From | | Degree | 79.2702777 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 56 M/1 and 56 M/5 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 200.29 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 0.00 | (j)Seismic Zone | 2 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Maharashtra | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | J-11015/80/2016-IA-II(M) | (c)Date of Issue of TOR | 30 Mar 2017 | (f)Previous TOR Letter | Copy of Previous TOR letter | (b)Date of Apply of EC | 11 Jan 2019 | (c)Date of Issue of EC | 28 Mar 2019 | (d)Previous EC Letter | Copy of Previous EC letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 01 Dec 2018 | Distance of Public Hearing Venue from the Proposed Project : | 6 |
| Manoranjan Kendra, Sasti colony, Near CGM office, WCL Ballarpur area, Tehsil Rajura, Dist. Chandrapur, Maharashtra | State : | Maharashtra | District : | Chandrapur | Tehsil : | Rajura | Village : | Pauni |
| 325 | 1. New approach road to the agriculture fields of nearby villagers
2. Water scarcity in nearby villages
3. Compensation to the farmers encroached land of state government revenue department.
4. Nal | Others | ADM | |
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Nagpur | (iii)Letter No. | 3-10/2006(env)/4731 | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Sep 24 2018 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | coal | 0.60 | 2.65 | 3.25 | Others | Million Tonnes per Annum | Road,Rail | | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | Coal Mine | Opencast | Opencast | Opencast | Expansion of existing OC coal mine | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 17 Dec 2018 | (iv)Valid Upto | 31 Jan 2022 | (v)File No. | 0000039454 | (vi)Application No. | MPCB-CONSENT-0000039454 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 483.6948 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 0.9709 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 1.95 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 700 | (b)Existing quantity of raw material/fuel | 135.12 | (c)Total quantity of raw material/fuel | 835.12 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Power | 475.8 | Mega Watt(MW) | | MSEDCL | Others | Tranmission Lines | 20 | Fuel Supply Agreement | | Copy of Linkage | (2.) | Explosives | 192197.5 | Others | KG/Annum | CIL approved Vendors | Road | | 0 | Fuel Supply Agreement | | Copy of Linkage | (3.) | Diesel | 135.12 | Kilo Litre per Day | | IOCL | Road | | 0 | Fuel Supply Agreement | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Nov 2015 To 31 Jan 2016 | (b)Season | Post-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 6 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM2.5 | | Micro Gram per Meter Cube | 47 | 22 | 45.2 | 60 | (2.) | SO2 | | Micro Gram per Meter Cube | 16.3 | 8.2 | 15.8 | 80 | (3.) | NOx | | Micro Gram per Meter Cube | 20.3 | 12.3 | 19.8 | 80 | (4.) | PM10 | | Micro Gram per Meter Cube | 85 | 40 | 81.8 | 300 | |
14.2. No. of Ground Water monitoring locations : 6 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | pH | | | NA | | 7.5 | 7.3 | 6.5 | 8.5 | (2.) | Fluoride | | | mg/l | | 1.8 | 0.52 | 1.0 | 1.5 | (3.) | TDS | | | mg/l | | 470 | 460 | 500 | 2000 | (4.) | TSS | | | mg/l | | 16 | 12 | 100 | 100 | (5.) | Chlorides | | | mg/l | | 24 | 12 | 250 | 1000 | (6.) | Others | Total Alkalinity | | Others | mg/L as CaCO3 | 330 | 318 | 200 | 600 | (7.) | Total Hardness | | | Others | mg/L as CaCO3 | 364 | 330 | 200 | 600 | |
14.3. No. of Surface Water monitoring locations : 2 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | NA | | 7.4 | 7.2 | C | (2.) | BOD | | mg/l | | 2.4 | 2.0 | C | (3.) | COD | | mg/l | | 5.6 | 3.2 | C | (4.) | DO | | mg/l | | 7.4 | 6.2 | C | |
14.4. No. of Ambient Noise monitoring locations : 6 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Night) | A-weighted decibels(dB(A)) | 44.7 | 41.8 | 45 | (2.) | Leq(Day) | A-weighted decibels(dB(A)) | 53.7 | 45.6 | 55 | |
14.5. No. of Soil Sample Monitored locations : 3 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | Others | NA | 6.6 | 6.3 | (2.) | N(Nitrogen) | Kilogram per hectare | | 314.5 | 304.1 | (3.) | K(Potassium) | Kilogram per hectare | | 156.6 | 148.0 | (4.) | Electric Conductivity | Others | m-mhos/cm at 20 degree celcius | 0.53 | 0.50 | (5.) | P(Phosphorus) | Kilogram per hectare | | 33.9 | 29.4 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 10.2 To 7.75 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 3.3 To 7.62 | (c)Whether Ground Water Intersection will be there ? | Yes | (d)Upload Copy of Central Ground Water Authority Letter | Copy of Central Ground Water Authority Letter | (e)Letter No. | application no-21-4/728/MH/MIN/2017 dated 19.01.20 | (f)Date of Issue | 19 Jan 2017 | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | GroundWater | | 880 | 0 | Copy of Permission Letter | Pipeline | | Others | Direct pumping of mine water | application no-21-4/728/MH/MIN/2017 | 19 Jan 2017 | 880 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Mine water | 880 | 1392 | Swdimentation | Reuse within the Plant & Recycling | | 880 | | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 880 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 880 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Overburden | Others | Soil and rocks from coal mine | 42328000 | Tons | 0.15 | Road,Others | by dumpers through Internal roads | Others | on surface as well as within mine void | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM2.5 | | Microgram per Meter Cube | 37 | 0.25 | 8 | 45 | 60 | (2.) | NOx | | Microgram per Meter Cube | 39 | 0.25 | 4 | 43 | 80 | (3.) | SO2 | | Microgram per Meter Cube | 21 | 0.25 | 2 | 23 | 80 | (4.) | PM10 | | Microgram per Meter Cube | 61 | 0.25 | 28.12 | 89.12 | 100 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | NA | NA | 0 | 0 | NOx | | 0 | (2.) | NA | NA | 0 | 0 | PM10 | | 0 | (3.) | NA | NA | 0 | 0 | SO2 | | 0 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 4636 | (b)Source | MSEDCL | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | 0 | (e)Stack Height (in m) | 0 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 1034.99 | (c)Government Land (ha.) | 60.53 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 1095.52 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 718.69 | (b)Waste/Barren Land (ha.) | 60.53 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 316.30 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : Nil | 0 | Total (ha.) | 1095.52 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Quarry Area | | 273.79 | | (2.) | OB Dump Area | | 244.90 | | (3.) | Safety Zone | | 200 | Blasting zone | (4.) | Township | | 12 | Infrastructure and colony | (5.) | Area for Solid Waste Management | | 58.93 | Temporary top soil dump | (6.) | Others | Area for rationalisation | 305.90 | Area for rationalisation | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Critically Polluted Area | Not applicable | 0 | Not applicable | (2.) | NPA | Not applicable | 0 | Not applicable | (3.) | Corridors | Not applicable | 0 | Not applicable | (4.) | ESAs | Not applicable | 0 | Not applicable | (5.) | ESZs | Not applicable | 0 | Not applicable | (6.) | Wildlife Corridors | Not applicable | 0 | Not applicable | (7.) | WLS | Not applicable | 0 | Not applicable | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Others | Not applicable | Not applicable | 0 | Not applicable | (2.) | Archaeological Sites | | Not applicable | 0 | Not applicable | (3.) | Defence Installations | | Not applicable | 0 | Not applicable | (4.) | Forest | | Not applicable | 0 | Not applicable | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | Not Applicable | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 1066.41 | (b)Land yet to be acquired(Ha) | 29.11 | (c)Status of Land acquisition if not acquired | Under process | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | In-Progress | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | Yes | (i)Details of Water Bodies in Core Area | Lendi nallah and Sakhari nallah | (b)Whether there is Diversion Required ? | Yes | (i)Details of Diversion Required | Seasonal nallah | (ii)Details of Study Conducted | yet to be conducted | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Wardha River | (ii)Direction of Water Bodies in Buffer Area | North | (iii)Distance of Water Bodies in Buffer Area | 6.6 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 107 | (c)Temporary Employment- During Construction | 0 | (d)Temporary Employment- During Operation | 193 | (e)No. of working days | 330 | (f)Total Manpower | 300 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 10 | 759.40 | 769.4 | (2.) | Percentage of Total Project Area | 0.86 | 65.88 | 66.74 | (3.) | No. of Plants | 25000 | 1898500 | 1923500 | (4.) | Funds Allocated | 2820000 | 265790000 | 268610000 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Social | The project will lead to development of roads, ancillary industries, Improvement in social
& living standards by providing opportunities of direct & indirect employment to local
community | (2.) | Environmental | Conservation of coal. Also it will lead to positive environmental impacts like green cover,
mine water utilization , etc. | (3.) | Financial | A substantial percentage of population is dependent on mining industry directly or
indirectly. Because of this mining project some of the local population may take direct
employment but a substantial impact will be on creation of indirect job opportunities and
employment. | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For Coal Mining |
|
1. No. of Mineral(s) to be Mined : 1 |
---|
S. No. | Mineral(s) to be Mined | Major or Minor Mineral |
---|
(1.) | Coal | Major | |
|
2. | Mine Capacity in ROM (Run of Mine) | 3.25 MTPA | |
|
|
4. | Mining Plan: | (a)Approval Letter No. | WCL/BD/SECTT/BM-307/2018/830 | (b)Date of Approval | 26 Dec 2018 | (c)Approved Letter | Copy of Approved Letter | (d)Approved By State Mining and Geology Department | WCL Board | (e)Approved Mining Lease Area | 1095.52 | (f)Approved Capacity | 3.25 | |
|
5. | Technical Details: | (a)Total Geological Reserves (Million Ton) | 31.8 | (b)Mineable Reserves (Million Ton) | 27.23 | (c)Extractable Reserves(Million Ton) | 27.23 | (d)Percent(%) of Extraction | 85 | (e)Grade of Coal /Ore /Mineral | G-9 | (f)Stripping Ratio | 1 : 6.19 | (g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) | NA | (h)Average Gradient(Degree) | 1 in 6 to 1 in 7 | (i)Mining Method | Opencast | (j)Life of Mine (Years) | 13 | |
|
6. | Details of Beneficiations: | (a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area | No | (b)Whether it is proposed to install crusher within the mining lease area | Yes | (c)No. of crushers | 2 | |
|
6.1. Details of crusher: |
---|
S. No. | Crusher ID | Capacity (in PH) | Remarks |
---|
(1.) | 1 | 205 | | (2.) | 2 | 205 | | |
|
7. | Details of Seams: | (a)Whether details of seam applicable | Yes | (b)No. of seams | 2 | (c)Thickness of seams to be worked on | 10 | (d)Maximum Thickness of Seams (metres) | 10.95 | |
|
8. | Details of Mining Lease: | (a)Mining Lease Area (in Hectare) | 1095.52 | (b)Whether obtained Letter of Intent (LOI) from the state government ? | No | (i)Reason thereof | Not applicable | (c)Whether Lease Deed Executed ? | No | (i)Reason thereof | Not applicable | (d)Whether Lease Deed Renewed ? | No | (i)Reason thereof | Not applicable | |
|
9. | OB (Over Burden) Management: | (a) Details of External Dumps: | (i)No. of OB Dumps | | (ii)Total Area (in Hectare) | | (iii)Height (in meter) | | (iv)Quantity (in Million Cubic meter) | | (v)No. of year back fill up | | (b) Details of Internal Dumps: | (i)No. of Internal Dumps | | (ii)Total Area (in Hectare) | | (iii)Height (in meter) | | (iv)Quantity (in Million Cubic meter) | | |
|
10. | Details of Topsoil Management: | (a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) | 18.30 | (b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) | 18.30 | (c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) | 0 | |
|
11. | Details of Final Mine Void: | (a)Area (in Hectare) | | (b)Depth (in meter) | | (c)Volume (in Million Cubic meter) | | |
|
12. | Details of Quarry: | (a)Final Void of 188.35 (hectare) at a Depth of 200 meter which is Proposed to be Converted into a Water Body. | (b)Total Quarry Area (ha) | 295.35 | |
|
13. | Details of Transportation: | (a)In Pit/Underground to Surface | Dumpers | (b)Surface to Siding/Loading | Tippers | (c)Transportation / Conveyor Details | Road way | |
|
|
14. Details of Land Usage (Pre-Mining) |
---|
S. No. | LAND USE | Other LAND USE | WITHIN ML AREA (Hectare) | OUTSIDE ML AREA (Hectare) | TOTAL (Hectare) |
---|
(1.) | GRAZING LAND | | 0 | 0 | 0 | (2.) | WASTE LAND | | 0 | 0 | 0 | (3.) | AGRICULTURE LAND | | 1034.99 | 0 | 1034.99 | (4.) | OTHERS(Specify) | Government Land | 60.53 | 0 | 60.53 | (5.) | FOREST LAND | | 0 | 0 | 0 | (6.) | SURFACE WATER BODIES | | 0 | 0 | 0 | (7.) | SETTLEMENTS | | 0 | 0 | 0 | |
TOTAL | 1095.52 | 0 | 1095.52 | |
|
15. Details of Land Usage (Post-Mining) |
---|
S. No. | LAND USE | Other LAND USE | Plantation (ha) | Water Body (ha) | Public Use (ha) | Undisturbed (ha) | Total |
---|
(1.) | TOP SOIL STORAGE | | 35.40 | 0 | 0 | | 35.4 | (2.) | INTERNAL OB DUMPS | | 58.93 | 0 | 0 | | 58.93 | (3.) | GREEN BELT | | 0 | 0 | 0 | | 0 | (4.) | VIRGIN AREA | | 350 | 0 | 0 | | 350 | (5.) | EXCAVATION/QUARRY | | 107 | 188.35 | 0 | | 295.35 | (6.) | ROADS | | 0.50 | 0 | 1.5 | | 2 | (7.) | Other | undisterb area (no plantation) | 0 | 0 | 186.41 | | 186.41 | (8.) | EXTERNAL OB DUMPS | | 214.57 | 0 | 0 | | 214.57 | (9.) | BUILT UP AREA (COLONY/OFFICE) | | 3 | 0 | 7 | | 10 | |
TOTAL | 769.4 | 188.35 | 194.91 | 0 | 1152.66 | |
16. | Details of Reclamation: | Total Afforestation Plan shall be Implemented Covering of Mining.This will Include: | (a)External OB Dump(in hectare) | 214.57 | (b)Internal Dump(in hectare) | 165.93 | (c)Quarry(in hectare) | 295.35 | (d)Safety Zone(in hectare) | 200 | (e)Final Void of 188.35 (hectare) at a Depth of 200 meter which is Proposed to be Converted into a Water Body. | (f)Density of Tree Plantation per ha (in no.) | 2500 | (g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) | 3.44 | (h)Total afforestation plant (in hectare) | 769.4 | |
|
|
18. Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception: |
---|
S. No. | Financial Year | Sanctioned Capacity as per EC (MTPA) | Sanctioned Capacity as per CTO | Sanctioned Capacity as per approved mining plan | Actual Production | Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA) |
---|
(1.) | 2017 | 0.60 | 0.60 | 0.60 | 0.51 | 0 | (2.) | 2018 | 0.60 | 0.60 | 0.60 | 0.306 | 0 | |
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1720/RA0092 | (ii)Name of the EIA Consultant | CENTRAL MINE PLANNING AND DESIGN INSTITUTE LIMITED | (iii)Address | Gondwana Place, Kanke Road, Ranchi-834031 | (iv)Mobile No. | 9421995343 | (v)Landline No. | 0651223185 | (vi)Email Id | gmenv.cmpdi@coalindia.in | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Coal Mining | (ix)Validity of Accreditation | 01 Oct 2020 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | Please inform/clarify the following:-
- Re-validation of the existing EC dated 2/2/2006 as mandated under the Ministry's Notification dated 6/4/2018.
- Action taken report on the observations of Regional Office during their site visit on 24/9/2018 (Report forwarded on 2/1/2019). | 10 Jan 2019 | 2. | NA | The correction have been made as per the instruction received | 11 Jan 2019 | |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Kaushik Chakraborty | Designation | G.M (MINING)/ ENVIRONMENT. | Name of Company (Applicant Name should not be given here) | Western Coalfields Limited | Address | Coal Estate Civil lines, Nagpur-440001 |
|