Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Shyam Steel Manufacturing Limited
(b)Name of the Company / Organisation SHYAM STEEL MANUFACTURINGLIMITED
(c)Registered Address Shyam Tower, En-32, Salt Lake, Sector V, Kolkata - 700091,,Bankura,West Bengal-700091
(d)Legal Status of the Company Others
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Manoj Daga
(b)Designation (Owner/ Partner/ CEO) AGMCommercial
(c)Address Shyam Tower, En-32, Salt Lake, Sector V, Kolkata 700091,,Mejhia,Bankura,West Bengal-700091
(d)Pin code 700091
(e)E-mail mdaga@shyamsteel.com
(f)STD Code. 33(f)Telephone No. 40074007
(g)Fax No. 40074010
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity3(a) Metallurgical industries (ferrous & non ferrous)
Minor Activity
(b)Category A
(c)Proposal Number IA/WB/IND/6258/2007
(d)Master Proposal Number(Single Window) SW/90251/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 1
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 913, 914, etc. (Enclosed as Annexure - 1 in EIA re
(b)Pincode 722143
(c)Bounded Latitudes (North)
From
Degree 23.55944444
Minutes
Second
From
Degree 23.56805556
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 87.08111111
Minutes
Second
From
Degree 87.09500000
Minutes
Second
(e)Survey of India Topo Sheet No. 73M/02
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 90
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 1.5
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project West Bengal
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)West BengalBankuraMejhiaJ.L.No. 11, Jemua Mouza, Mejia Block
(2.)West BengalBankuraMejhiaJ.L.No. 11, Jemua Mouza, Mejia Block
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-11011/724/2007-IA.II(I)
(c)Date of Issue of TOR
(f)Previous TOR Letter NA
(b)Date of Apply of EC 31 Jul 2007
(c)Date of Issue of EC 01 Aug 2008
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :12 Oct 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :30 Nov 2018
Distance of Public Hearing Venue from the Proposed Project :0.75
Mejia Panchayat Samity Meeting Hall
State :West Bengal
District :Bankura
Tehsil :Mejhia
Village :Jemua
123Socio economic activities, Drinking water supply, Plantation, Employment etc.OthersAdditional District Magistrate
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Bhubaneswar
(iii)Letter No. 102-240/EPE/3215
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Jul 25 2018 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Bloom0198000198000Tons per Annum(TPA)Road
(2.)SiMn324003240064800Tons per Annum(TPA)Road
(3.)FeSi156001560031200Tons per Annum(TPA)Road
(4.)Oxygen Plant040004000Tons per Annum(TPA)Othersthrough pipes
(5.)FeCr270002700054000Tons per Annum(TPA)Road
(6.)Power through AFBC72532Mega Watt(MW)Othersthrough cable wire
(7.)FeMn324003240064800Tons per Annum(TPA)Road
(8.)Power through WHRB82634Mega Watt(MW)Othersthrough cable wire
(9.)MS Ingots/Billets/Hot charging217800396000613800Tons per Annum(TPA)Road
(10.)Hot Rolled TMT/ Structural200000429000629000Tons per Annum(TPA)Road
(11.)Coal / Coke / Chrome fines briquette1000000100000Tons per Annum(TPA)Roadthrough pipes
(12.)Sponge Iron180000346500526500Tons per Annum(TPA)Road
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Induction Furnace6 X 11 T8 x 15T6 x 11 T & 8 x 15 T
(2.)Oxygen Plant04000 TPA4000 TPA
(3.)Rolling Mill2,00,000 TPA4,29,000 TPA (2 x 650 TPD)6,29,000 TPA
(4.)Ferro Alloys Unit2 x 9 MVA2 x 9 MVA4 x 9 MVA
(5.)WHRB Power Plant8 MW26 MW34 MW
(6.)AFBC Power Plant7 MW25 MW32 MW
(7.)Coal / Coke / Chrome fines Briquette0100000100000Briquetting Plant
(8.)DRI Kilns1 x 300 TPD & 3 x 100 TPD3 x 350 TPD1 x 300 TPD, 3 x 100 TPD & 3 x 350 TPD
(9.)Electric Arc FurnaceNil1 x 30 T1 x 30 Twith 30 T Laddle Refining Furnace and AOD Converter
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 03 Mar 2016
(iv)Valid Upto 31 Mar 2019
(v)File No. 304-7/WPBD-Cont (2370)Part-I/OS
(vi)Application No. CO090298
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 990
(b) Funds Allocated for Environment Management (Capital) (in Crores) 40.0
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 6.45
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 3.2
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 554400
(b)Existing quantity of raw material/fuel 288000
(c)Total quantity of raw material/fuel 842400
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Iron ore554400Tons per AnnumBarbil, Orissa, ChhattisgarhRoad,Rail500 MoUCopy of Linkage
(2.)PELLET485100Tons per AnnumWest Bengal & OrissaRoad,Rail500 MoUCopy of Linkage
(3.)Coal392850Tons per AnnumSouth AfricaRoad,Othersthrough sea route500 MoUCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2018 To 31 May 2018
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube45.522.145.560
(2.)PM10Micro Gram per Meter Cube79.838.179.8100
(3.)NOxMicro Gram per Meter Cube26.48.526.480
(4.)OthersCOMicro Gram per Meter Cube138242513822000
(5.)SO2Micro Gram per Meter Cube13.77.813.780
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TSSmg/l1.10.400
(2.)TDSmg/l6133765002000
(3.)Chloridesmg/l2841942501000
(4.)Heavy MetalsFemg/l0.550.150.31.0
(5.)pHNA7.66.96.58.5
(6.)Total Hardnessmg/l302177300600
(7.)Fluoridemg/l0.830.481.01.5
    14.3.     No. of Surface Water monitoring locations : 3
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)BODmg/l4.52.2A
(2.)CODmg/l9.03.4A
(3.)OthersTDSmg/l378262A
(4.)pHNA8.27.8A
(5.)DOmg/l7.64.8A
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))603870
(2.)Leq(Day)A-weighted decibels(dB(A))684775
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pHOthersNA7.57.0
(2.)N(Nitrogen)Kilogram per hectare499257
(3.)Electric ConductivityMilliequivalents per 100 Gram186103
(4.)P(Phosphorus)Kilogram per hectare8941
(5.)K(Potassium)Kilogram per hectare389169
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 1 To 2
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 4.5 To 5.0
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface17501.5Copy of Permission LetterPipelineIntake WellCOML/WS/2006-07/WC25 Jun 20075850
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Sanitary wastewater2424Septic TankOthersSeptic tank240
(2.)from Power Plant & WTP rejects180180ETPReuse within the Plant & Recycling,Green Belt Renewal Plant180
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 204
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 204
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)DolocharIndustrial Waste315Tons0RoadOthersresued in AFBC Power Plant
(2.)Wet Srapper sludgeIndustrial Waste15Tons30RoadOthersused in brick manuf.
(3.)Slag from SMSIndustrial Waste97Tons30RoadOthersused i brick manuf.
(4.)Mill scales from Rolling MillIndustrial Waste65Tons0RoadOthersreused in SMS & Ferro Alloys
(5.)FeMn SlagIndustrial Waste91Tons30RoadOthersresued in SiMn manuf.
(6.)FeCr SlagIndustrial Waste84Tons50RoadOthersprocessed in Zigging plant
(7.)Ash from Power PlantFly Ash320Tons40RoadOthersused cement plant
(8.)Ash from DRIFly Ash189Tons40RoadOthersReused in Cement plant
(9.)SiMn SlagIndustrial Waste93Tons30RoadOthersused in road construction
(10.)FeSiIndustrial Waste3Tons30RoadOthersgiven to cast iron foundaries
(11.)Kiln Accretion SlagIndustrial Waste9.5Tons30RoadOthersused in road construction
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)Others(Specify)COMicrogram per Meter Cube138222007.21389.22000
(2.)PM2.5Microgram per Meter Cube45.522002.347.860
(3.)PM10Microgram per Meter Cube79.822005.385.1100
(4.)NOxMicrogram per Meter Cube26.4220022.048.480
(5.)SO2Microgram per Meter Cube13.7220026.139.880
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DRI Kiln - I (1 x 350 TPD)Coal792.1PM101.9
(2.)DRI Kiln - I (1 x 350 TPD)Coal792.1SO243.8
(3.)DRI Kiln - II (1 x 350 TPD)Coal792.1PM101.9
(4.)DRI Kiln - III (1 x 350 TPD)Coal702.1PM101.9
(5.)DRI Kiln - III (1 x 350 TPD)Coal702.1SO243.8
(6.)IF - I (15 T)Electricity301.3NOx3.6
(7.)IF - II (15 T)Electricity301.3NOx3.6
(8.)IF - III (15 T)Electricity301.3PM100.9
(9.)IF - III (15 T)Electricity301.3NOx3.6
(10.)IF - IV (15 T)Electricity301.3PM100.9
(11.)IF - IV (15 T)Electricity301.3NOx3.6
(12.)IF - V (15 T)Electricity301.3PM100.9
(13.)IF - VI (15 T)Electricity301.3PM100.9
(14.)DRI Kiln - III (1 x 350 TPD)Coal702.1NOx5.7
(15.)IF - I (15 T)Electricity301.3PM100.9
(16.)IF - VI (15 T)Electricity301.3NOx3.6
(17.)IF - VII (15 T)Electricity301.3PM100.9
(18.)IF - VII (15 T)Electricity301.3NOx3.6
(19.)IF - VIII (15 T)Electricity301.3PM100.9
(20.)EAFElectricity351.6PM101.3
(21.)EAFElectricity351.6NOx5.2
(22.)Rolling Mill - I (650 TPD)Furnace Oil511.5PM100.9
(23.)Rolling Mill - I (650 TPD)Furnace Oil511.5SO220.5
(24.)Rolling Mill - I (650 TPD)Furnace Oil511.5NOx2.7
(25.)Rolling Mill - II (650 TPD)Furnace Oil511.5PM100.9
(26.)Rolling Mill - II (650 TPD)Furnace Oil511.5SO220.5
(27.)Rolling Mill - II (650 TPD)Furnace Oil511.5NOx2.7
(28.)SEAF - I (9 MVA)Electricity351.3PM100.7
(29.)DRI Kiln - I (1 x 350 TPD)Coal792.1NOx5.7
(30.)DRI Kiln - II (1 x 350 TPD)Coal792.1SO243.8
(31.)DRI Kiln - II (1 x 350 TPD)Coal792.1NOx5.7
(32.)IF - II (15 T)Electricity301.3PM100.9
(33.)IF - V (15 T)Electricity301.3NOx3.6
(34.)IF - VIII (15 T)Electricity301.3NOx3.6
(35.)SEAF - I (9 MVA)Electricity351.3NOx2.8
(36.)SEAF - II (9 MVA)Electricity351.3PM100.7
(37.)SEAF - II (9 MVA)Electricity351.3NOx2.8
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 127000
(b)Source Damodar Valley Corporation & Captive Power Plant
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 2 x 500
(e)Stack Height (in m) 7
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 23.4
(c)Government Land (ha.) 42.7
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 66.1
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 21455.7
(b)Waste/Barren Land (ha.) 6426.0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 3748.5
(e)Settlements (ha.) 2177.7
(f)Industrial (ha.) 1356.6
(g)Forest (ha.) 535.5
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : 0 0
    Total (ha.) 35700
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant19.6
(2.)Green belt21.9
(3.)Water Reservoir0.3
(4.)Built Up Area10.1(RM Storage,Railway Siding etc.
(5.)OthersMisc. areas14.2
Total (ha.) 66.1
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNil0Nil within 10 Kms. radius
(2.)ESZsNil0Nil within 10 Kms. radius
(3.)WLSNil0Nil within 10 Kms. radius
(4.)NPANil0Nil within 10 Kms. radius
(5.)ESAsNil0Nil within 10 Kms. radius
(6.)Wildlife CorridorsNil0Nil within 10 Kms. radius
(7.)CorridorsNil0Nil within 10 Kms. radius
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNil0Nil within 10 Kms. radius
(2.)OthersWater BodyDamodar River1.5Nearest river
(3.)ForestNil0Nil within 10 Kms. radius
(4.)Defence InstallationsNil0Nil within 10 Kms. radius
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 66.1
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired NA
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Damodar River
(ii)Direction of Water Bodies in Buffer Area North East
(iii)Distance of Water Bodies in Buffer Area 1.5
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 300
(c)Temporary Employment- During Construction 500
(d)Temporary Employment- During Operation 1000
(e)No. of working days 360
(f)Total Manpower 1800
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Percentage of Total Project Area31233
(2.)Total Area of Green Belt20.231.6221.85
(3.)No. of Plants31000250033500
(4.)Funds Allocated300000300000600000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialWith the implementation of the proposed expansion project, the socio-economic status of the local people will improve substantially
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 1
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA 026
(ii)Name of the EIA Consultant Pioneer Enviro Laboratories and Consultants Privat
(iii)Address 6-3-652, Flat # 7-3, Dhruvatara Apartments, Amrutha Estates, Erramanjil, Somajiguda, Hyderabad- 500082
(iv)Mobile No. 9440677333
(v)Landline No. 0402331427
(vi)Email Id pelcpl@yahoo.co.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 1
(ix)Validity of Accreditation 22 Jun 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantManoj Daga
DesignationAGMCommercial
Name of Company (Applicant Name should not be given here)SHYAM STEEL MANUFACTURINGLIMITED
AddressShyam Tower, En-32, Salt Lake, Sector V, Kolkata - 700091
Print