|
1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Shyam Steel Manufacturing Limited | (b)Name of the Company / Organisation | SHYAM STEEL MANUFACTURINGLIMITED | (c)Registered Address | Shyam Tower, En-32, Salt Lake, Sector V, Kolkata - 700091,,Bankura,West Bengal-700091 | (d)Legal Status of the Company | Others | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Manoj Daga | (b)Designation (Owner/ Partner/ CEO) | AGMCommercial | (c)Address | Shyam Tower, En-32, Salt Lake, Sector V, Kolkata 700091,,Mejhia,Bankura,West Bengal-700091 | (d)Pin code | 700091 | (e)E-mail | mdaga@shyamsteel.com | (f)STD Code. | 33(f)Telephone No. | 40074007 | (g)Fax No. | 40074010 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 3(a) Metallurgical industries (ferrous & non ferrous)
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/WB/IND/6258/2007 | (d)Master Proposal Number(Single Window) | SW/90251/2019 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 1 | (f)Project Type | Expansion |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | 913, 914, etc. (Enclosed as Annexure - 1 in EIA re | (b)Pincode | 722143 | (c)Bounded Latitudes (North) | | From | | Degree | 23.55944444 | Minutes | | Second | | From | | Degree | 23.56805556 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 87.08111111 | Minutes | | Second | | From | | Degree | 87.09500000 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 73M/02 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 90 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 1.5 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | West Bengal | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | West Bengal | Bankura | Mejhia | J.L.No. 11, Jemua Mouza, Mejia Block | (2.) | West Bengal | Bankura | Mejhia | J.L.No. 11, Jemua Mouza, Mejia Block | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | J-11011/724/2007-IA.II(I) | (c)Date of Issue of TOR | | (f)Previous TOR Letter | NA | (b)Date of Apply of EC | 31 Jul 2007 | (c)Date of Issue of EC | 01 Aug 2008 | (d)Previous EC Letter | Copy of Previous EC letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 30 Nov 2018 | Distance of Public Hearing Venue from the Proposed Project : | 0.75 |
| Mejia Panchayat Samity Meeting Hall | State : | West Bengal | District : | Bankura | Tehsil : | Mejhia | Village : | Jemua |
| 123 | Socio economic activities, Drinking water supply, Plantation, Employment etc. | Others | Additional District Magistrate | |
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Bhubaneswar | (iii)Letter No. | 102-240/EPE/3215 | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Jul 25 2018 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Bloom | 0 | 198000 | 198000 | Tons per Annum(TPA) | | Road | | (2.) | SiMn | 32400 | 32400 | 64800 | Tons per Annum(TPA) | | Road | | (3.) | FeSi | 15600 | 15600 | 31200 | Tons per Annum(TPA) | | Road | | (4.) | Oxygen Plant | 0 | 4000 | 4000 | Tons per Annum(TPA) | | Others | through pipes | (5.) | FeCr | 27000 | 27000 | 54000 | Tons per Annum(TPA) | | Road | | (6.) | Power through AFBC | 7 | 25 | 32 | Mega Watt(MW) | | Others | through cable wire | (7.) | FeMn | 32400 | 32400 | 64800 | Tons per Annum(TPA) | | Road | | (8.) | Power through WHRB | 8 | 26 | 34 | Mega Watt(MW) | | Others | through cable wire | (9.) | MS Ingots/Billets/Hot charging | 217800 | 396000 | 613800 | Tons per Annum(TPA) | | Road | | (10.) | Hot Rolled TMT/ Structural | 200000 | 429000 | 629000 | Tons per Annum(TPA) | | Road | | (11.) | Coal / Coke / Chrome fines briquette | 100000 | 0 | 100000 | Tons per Annum(TPA) | | Road | through pipes | (12.) | Sponge Iron | 180000 | 346500 | 526500 | Tons per Annum(TPA) | | Road | | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | Induction Furnace | 6 X 11 T | 8 x 15T | 6 x 11 T & 8 x 15 T | | (2.) | Oxygen Plant | 0 | 4000 TPA | 4000 TPA | | (3.) | Rolling Mill | 2,00,000 TPA | 4,29,000 TPA (2 x 650 TPD) | 6,29,000 TPA | | (4.) | Ferro Alloys Unit | 2 x 9 MVA | 2 x 9 MVA | 4 x 9 MVA | | (5.) | WHRB Power Plant | 8 MW | 26 MW | 34 MW | | (6.) | AFBC Power Plant | 7 MW | 25 MW | 32 MW | | (7.) | Coal / Coke / Chrome fines Briquette | 0 | 100000 | 100000 | Briquetting Plant | (8.) | DRI Kilns | 1 x 300 TPD & 3 x 100 TPD | 3 x 350 TPD | 1 x 300 TPD, 3 x 100 TPD & 3 x 350 TPD | | (9.) | Electric Arc Furnace | Nil | 1 x 30 T | 1 x 30 T | with 30 T Laddle Refining Furnace and AOD Converter | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 03 Mar 2016 | (iv)Valid Upto | 31 Mar 2019 | (v)File No. | 304-7/WPBD-Cont (2370)Part-I/OS | (vi)Application No. | CO090298 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 990 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 40.0 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 6.45 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 3.2 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 554400 | (b)Existing quantity of raw material/fuel | 288000 | (c)Total quantity of raw material/fuel | 842400 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Iron ore | 554400 | Tons per Annum | | Barbil, Orissa, Chhattisgarh | Road,Rail | | 500 | MoU | | Copy of Linkage | (2.) | PELLET | 485100 | Tons per Annum | | West Bengal & Orissa | Road,Rail | | 500 | MoU | | Copy of Linkage | (3.) | Coal | 392850 | Tons per Annum | | South Africa | Road,Others | through sea route | 500 | MoU | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Mar 2018 To 31 May 2018 | (b)Season | Summer | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM2.5 | | Micro Gram per Meter Cube | 45.5 | 22.1 | 45.5 | 60 | (2.) | PM10 | | Micro Gram per Meter Cube | 79.8 | 38.1 | 79.8 | 100 | (3.) | NOx | | Micro Gram per Meter Cube | 26.4 | 8.5 | 26.4 | 80 | (4.) | Others | CO | Micro Gram per Meter Cube | 1382 | 425 | 1382 | 2000 | (5.) | SO2 | | Micro Gram per Meter Cube | 13.7 | 7.8 | 13.7 | 80 | |
14.2. No. of Ground Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | TSS | | | mg/l | | 1.1 | 0.4 | 0 | 0 | (2.) | TDS | | | mg/l | | 613 | 376 | 500 | 2000 | (3.) | Chlorides | | | mg/l | | 284 | 194 | 250 | 1000 | (4.) | Heavy Metals | | Fe | mg/l | | 0.55 | 0.15 | 0.3 | 1.0 | (5.) | pH | | | NA | | 7.6 | 6.9 | 6.5 | 8.5 | (6.) | Total Hardness | | | mg/l | | 302 | 177 | 300 | 600 | (7.) | Fluoride | | | mg/l | | 0.83 | 0.48 | 1.0 | 1.5 | |
14.3. No. of Surface Water monitoring locations : 3 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | BOD | | mg/l | | 4.5 | 2.2 | A | (2.) | COD | | mg/l | | 9.0 | 3.4 | A | (3.) | Others | TDS | mg/l | | 378 | 262 | A | (4.) | pH | | NA | | 8.2 | 7.8 | A | (5.) | DO | | mg/l | | 7.6 | 4.8 | A | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Night) | A-weighted decibels(dB(A)) | 60 | 38 | 70 | (2.) | Leq(Day) | A-weighted decibels(dB(A)) | 68 | 47 | 75 | |
14.5. No. of Soil Sample Monitored locations : 8 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | Others | NA | 7.5 | 7.0 | (2.) | N(Nitrogen) | Kilogram per hectare | | 499 | 257 | (3.) | Electric Conductivity | Milliequivalents per 100 Gram | | 186 | 103 | (4.) | P(Phosphorus) | Kilogram per hectare | | 89 | 41 | (5.) | K(Potassium) | Kilogram per hectare | | 389 | 169 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 1 To 2 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 4.5 To 5.0 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Surface | | 1750 | 1.5 | Copy of Permission Letter | Pipeline | | Intake Well | | COML/WS/2006-07/WC | 25 Jun 2007 | 5850 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Sanitary wastewater | 24 | 24 | Septic Tank | Others | Septic tank | 24 | 0 | (2.) | from Power Plant & WTP rejects | 180 | 180 | ETP | Reuse within the Plant & Recycling,Green Belt Renewal Plant | | 180 | | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 204 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 204 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Dolochar | Industrial Waste | | 315 | Tons | 0 | Road | | Others | resued in AFBC Power Plant | (2.) | Wet Srapper sludge | Industrial Waste | | 15 | Tons | 30 | Road | | Others | used in brick manuf. | (3.) | Slag from SMS | Industrial Waste | | 97 | Tons | 30 | Road | | Others | used i brick manuf. | (4.) | Mill scales from Rolling Mill | Industrial Waste | | 65 | Tons | 0 | Road | | Others | reused in SMS & Ferro Alloys | (5.) | FeMn Slag | Industrial Waste | | 91 | Tons | 30 | Road | | Others | resued in SiMn manuf. | (6.) | FeCr Slag | Industrial Waste | | 84 | Tons | 50 | Road | | Others | processed in Zigging plant | (7.) | Ash from Power Plant | Fly Ash | | 320 | Tons | 40 | Road | | Others | used cement plant | (8.) | Ash from DRI | Fly Ash | | 189 | Tons | 40 | Road | | Others | Reused in Cement plant | (9.) | SiMn Slag | Industrial Waste | | 93 | Tons | 30 | Road | | Others | used in road construction | (10.) | FeSi | Industrial Waste | | 3 | Tons | 30 | Road | | Others | given to cast iron foundaries | (11.) | Kiln Accretion Slag | Industrial Waste | | 9.5 | Tons | 30 | Road | | Others | used in road construction | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | Others(Specify) | CO | Microgram per Meter Cube | 1382 | 2200 | 7.2 | 1389.2 | 2000 | (2.) | PM2.5 | | Microgram per Meter Cube | 45.5 | 2200 | 2.3 | 47.8 | 60 | (3.) | PM10 | | Microgram per Meter Cube | 79.8 | 2200 | 5.3 | 85.1 | 100 | (4.) | NOx | | Microgram per Meter Cube | 26.4 | 2200 | 22.0 | 48.4 | 80 | (5.) | SO2 | | Microgram per Meter Cube | 13.7 | 2200 | 26.1 | 39.8 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | DRI Kiln - I (1 x 350 TPD) | Coal | 79 | 2.1 | PM10 | | 1.9 | (2.) | DRI Kiln - I (1 x 350 TPD) | Coal | 79 | 2.1 | SO2 | | 43.8 | (3.) | DRI Kiln - II (1 x 350 TPD) | Coal | 79 | 2.1 | PM10 | | 1.9 | (4.) | DRI Kiln - III (1 x 350 TPD) | Coal | 70 | 2.1 | PM10 | | 1.9 | (5.) | DRI Kiln - III (1 x 350 TPD) | Coal | 70 | 2.1 | SO2 | | 43.8 | (6.) | IF - I (15 T) | Electricity | 30 | 1.3 | NOx | | 3.6 | (7.) | IF - II (15 T) | Electricity | 30 | 1.3 | NOx | | 3.6 | (8.) | IF - III (15 T) | Electricity | 30 | 1.3 | PM10 | | 0.9 | (9.) | IF - III (15 T) | Electricity | 30 | 1.3 | NOx | | 3.6 | (10.) | IF - IV (15 T) | Electricity | 30 | 1.3 | PM10 | | 0.9 | (11.) | IF - IV (15 T) | Electricity | 30 | 1.3 | NOx | | 3.6 | (12.) | IF - V (15 T) | Electricity | 30 | 1.3 | PM10 | | 0.9 | (13.) | IF - VI (15 T) | Electricity | 30 | 1.3 | PM10 | | 0.9 | (14.) | DRI Kiln - III (1 x 350 TPD) | Coal | 70 | 2.1 | NOx | | 5.7 | (15.) | IF - I (15 T) | Electricity | 30 | 1.3 | PM10 | | 0.9 | (16.) | IF - VI (15 T) | Electricity | 30 | 1.3 | NOx | | 3.6 | (17.) | IF - VII (15 T) | Electricity | 30 | 1.3 | PM10 | | 0.9 | (18.) | IF - VII (15 T) | Electricity | 30 | 1.3 | NOx | | 3.6 | (19.) | IF - VIII (15 T) | Electricity | 30 | 1.3 | PM10 | | 0.9 | (20.) | EAF | Electricity | 35 | 1.6 | PM10 | | 1.3 | (21.) | EAF | Electricity | 35 | 1.6 | NOx | | 5.2 | (22.) | Rolling Mill - I (650 TPD) | Furnace Oil | 51 | 1.5 | PM10 | | 0.9 | (23.) | Rolling Mill - I (650 TPD) | Furnace Oil | 51 | 1.5 | SO2 | | 20.5 | (24.) | Rolling Mill - I (650 TPD) | Furnace Oil | 51 | 1.5 | NOx | | 2.7 | (25.) | Rolling Mill - II (650 TPD) | Furnace Oil | 51 | 1.5 | PM10 | | 0.9 | (26.) | Rolling Mill - II (650 TPD) | Furnace Oil | 51 | 1.5 | SO2 | | 20.5 | (27.) | Rolling Mill - II (650 TPD) | Furnace Oil | 51 | 1.5 | NOx | | 2.7 | (28.) | SEAF - I (9 MVA) | Electricity | 35 | 1.3 | PM10 | | 0.7 | (29.) | DRI Kiln - I (1 x 350 TPD) | Coal | 79 | 2.1 | NOx | | 5.7 | (30.) | DRI Kiln - II (1 x 350 TPD) | Coal | 79 | 2.1 | SO2 | | 43.8 | (31.) | DRI Kiln - II (1 x 350 TPD) | Coal | 79 | 2.1 | NOx | | 5.7 | (32.) | IF - II (15 T) | Electricity | 30 | 1.3 | PM10 | | 0.9 | (33.) | IF - V (15 T) | Electricity | 30 | 1.3 | NOx | | 3.6 | (34.) | IF - VIII (15 T) | Electricity | 30 | 1.3 | NOx | | 3.6 | (35.) | SEAF - I (9 MVA) | Electricity | 35 | 1.3 | NOx | | 2.8 | (36.) | SEAF - II (9 MVA) | Electricity | 35 | 1.3 | PM10 | | 0.7 | (37.) | SEAF - II (9 MVA) | Electricity | 35 | 1.3 | NOx | | 2.8 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 127000 | (b)Source | Damodar Valley Corporation & Captive Power Plant | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | 2 x 500 | (e)Stack Height (in m) | 7 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 23.4 | (c)Government Land (ha.) | 42.7 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 66.1 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 21455.7 | (b)Waste/Barren Land (ha.) | 6426.0 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 3748.5 | (e)Settlements (ha.) | 2177.7 | (f)Industrial (ha.) | 1356.6 | (g)Forest (ha.) | 535.5 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : 0 | 0 | Total (ha.) | 35700 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 19.6 | | (2.) | Green belt | | 21.9 | | (3.) | Water Reservoir | | 0.3 | | (4.) | Built Up Area | | 10.1 | (RM Storage,Railway Siding etc. | (5.) | Others | Misc. areas | 14.2 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Critically Polluted Area | Nil | 0 | Nil within 10 Kms. radius | (2.) | ESZs | Nil | 0 | Nil within 10 Kms. radius | (3.) | WLS | Nil | 0 | Nil within 10 Kms. radius | (4.) | NPA | Nil | 0 | Nil within 10 Kms. radius | (5.) | ESAs | Nil | 0 | Nil within 10 Kms. radius | (6.) | Wildlife Corridors | Nil | 0 | Nil within 10 Kms. radius | (7.) | Corridors | Nil | 0 | Nil within 10 Kms. radius | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Archaeological Sites | | Nil | 0 | Nil within 10 Kms. radius | (2.) | Others | Water Body | Damodar River | 1.5 | Nearest river | (3.) | Forest | | Nil | 0 | Nil within 10 Kms. radius | (4.) | Defence Installations | | Nil | 0 | Nil within 10 Kms. radius | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 66.1 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | NA | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Damodar River | (ii)Direction of Water Bodies in Buffer Area | North East | (iii)Distance of Water Bodies in Buffer Area | 1.5 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 300 | (c)Temporary Employment- During Construction | 500 | (d)Temporary Employment- During Operation | 1000 | (e)No. of working days | 360 | (f)Total Manpower | 1800 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Percentage of Total Project Area | 31 | 2 | 33 | (2.) | Total Area of Green Belt | 20.23 | 1.62 | 21.85 | (3.) | No. of Plants | 31000 | 2500 | 33500 | (4.) | Funds Allocated | 300000 | 300000 | 600000 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Social | With the implementation of the proposed expansion project, the socio-economic status of the local people will improve substantially | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 1 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1619/RA 026 | (ii)Name of the EIA Consultant | Pioneer Enviro Laboratories and Consultants Privat | (iii)Address | 6-3-652, Flat # 7-3, Dhruvatara Apartments, Amrutha Estates, Erramanjil, Somajiguda, Hyderabad- 500082 | (iv)Mobile No. | 9440677333 | (v)Landline No. | 0402331427 | (vi)Email Id | pelcpl@yahoo.co.in | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 1 | (ix)Validity of Accreditation | 22 Jun 2019 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought : NIL |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Manoj Daga | Designation | AGMCommercial | Name of Company (Applicant Name should not be given here) | SHYAM STEEL MANUFACTURINGLIMITED | Address | Shyam Tower, En-32, Salt Lake, Sector V, Kolkata - 700091 |
|