Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Expansion of DLF Cyber City
(b)Name of the Company / Organisation DLF COMMERCIAL DEVELOPERS LIMITED
(c)Registered Address DLF Centre, 9th floor, sansad marg, new delhi,,New Delhi,Delhi-110001
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant arvind Pandey
(b)Designation (Owner/ Partner/ CEO) VicePresident
(c)Address DLF Centre, 9th floor, sansad marg, new delhi-110001,,Connaught Place,New Delhi,Delhi-110001
(d)Pin code 110001
(e)E-mail neels1409@gmail.com
(f)STD Code. 11(f)Telephone No. 42102030
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity8(b) Townships and Area Development projects.
Minor Activity
(b)Category B1
   Reason for Applying at Ministry SEIAA
(c)Proposal Number IA/TG/MIS/90243/2007
(d)Master Proposal Number(Single Window) SW/90239/2019
(e)EAC concerned (for category A Projects only) INFRA-2
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 129/P, 130/P, 131/P, 132/P, TSHB colony
(b)Pincode 500032
(c)Bounded Latitudes (North)
From
Degree 1931015.32
Minutes
Second
From
Degree 1931097.13
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 219198.29
Minutes
Second
From
Degree 219254.40
Minutes
Second
(e)Survey of India Topo Sheet No. E44M6 (56 K/6), E44M7 (56 K/7)
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 602
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 6.75
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Telangana
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)Himachal PradeshChambaChaurah(T)Dantoi
(2.)MaharashtraSindhudurgKankavliNardave
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number 21-41/2018-IA-III
(c)Date of Issue of TOR 10 Dec 2007
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 24 Jun 2019
(c)Date of Issue of EC 15 Dec 2020
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason The project falls under Building construction Sche
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Chennai
(iii)Letter No. F.No. EP/12.1/744/AP/0956
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Jan 24 2019 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Plot Area6.374.2410.61Hectares(ha)OthersNA
(2.)Built up Area39.7850.4990.27000000000001Hectares(ha)OthersNA
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)No. of Blocks336
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 22 Sep 2015
(iv)Valid Upto 30 Jun 2019
(v)File No. TSPCB/13145/CFO/RO-RR-II/HO/2015-1292
(vi)Application No. TSPCB/13145/CFO/RO-RR-II/HO/2015-1292
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 970
(b) Funds Allocated for Environment Management (Capital) (in Crores) 9.2
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 4.85
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.78
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel 0
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Not Applicable0Others00OthersNot Applicable0 OthersSupporting DocumentCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Dec 2017 To 28 Feb 2018
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)NOxMicro Gram per Meter Cube29.314.925.980
(2.)PM2.5Micro Gram per Meter Cube69.643.066.360
(3.)SO2Micro Gram per Meter Cube10.75.110.580
(4.)PM10Micro Gram per Meter Cube107.366.7105.2100
    14.2.     No. of Ground Water monitoring locations : 4
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Fluoridemg/l0.880.271.01.5
(2.)TDSmg/l642.9288.55002000
(3.)Heavy MetalsIronmg/l0.2640.1270.30.3
(4.)pHNA7.77.126.58.5
(5.)Total Hardnessmg/l380124200600
(6.)Chloridesmg/l133.9687.972501000
(7.)TSSmg/l0000
    14.3.     No. of Surface Water monitoring locations : 7
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA8.67.7D
(2.)DOmg/l5.54B
(3.)BODmg/l3.21.4B
(4.)CODmg/l5414E
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))66.246.555
(2.)Leq(Day)A-weighted decibels(dB(A))72.251.965
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pHOthersNA7.56.1
(2.)K(Potassium)Milligram per Kilogram167.614.5
(3.)Electric ConductivityMillisiemens per Centimetre366.751.7
(4.)N(Nitrogen)Milligram per Kilogram134.462.3
(5.)P(Phosphorus)Milligram per Kilogram74.18.8
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.4 To 33.5
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.2 To 28.32
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersMunicipal Supply23450.1Copy of Permission LetterPipelineOthersMunicipal SupplyGM(E)OB/O&M08 Feb 20072345
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic, Flushing & Misc23742950STPReuse within the Plant & Recycling,Green Belt Renewal Plant,OthersLOSS 14923740
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 2374
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 2374
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Recyclable WasteMunicipal Solid Waste1692.5Tons0OthersNAAuthorized Recyclers
(2.)Biodegradable WasteMunicipal Solid Waste846.43Tons0OthersNAOthersOrganic Waste Convertor
(3.)Recyclable WastePlastic Waste282.145Tons0OthersNAAuthorized Recyclers
(4.)Used OilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)194.91Kilolitre0RoadOthersAuthorised Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube77.10.80.38677.486100
(2.)PM2.5Microgram per Meter Cube49.10.10.19349.29460
(3.)NOxMicrogram per Meter Cube19.10.80.77119.87280
(4.)SO2Microgram per Meter Cube7.30.80.1937.49380
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG Sets- 1010 KVAHigh speed diesel85.80.50SO20.12
(2.)DG Sets- 2000KVAHigh speed diesel85.80.65PM100.067
(3.)DG Sets- 1500 KVAHigh Speed Diesel85.80.60PM100.05
(4.)DG Sets- 1500 KVAHigh Speed Diesel85.80.60NOx0.288
(5.)DG Sets- 1010High Speed Diesel85.80.50PM100.034
(6.)DG Sets- 1010 KVAHigh Speed diesel85.80.50NOx0.228
(7.)DG Sets- 1500 KVAHigh Speed Diesel85.80.60SO20.18
(8.)DG Sets-2000 KVAHigh Speed diesel85.80.65SO20.24
(9.)DG Sets-2000 KVAHigh Speed Diesel85.80.65NOx0.318
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 43333
(b)Source Telangana State Southern Power Distribution
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 22 X 2000 KVA, 1 X 1010 KVA, 11 X 1500 KVA
(e)Stack Height (in m) 85.8
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 10.61
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 10.61
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Plot Area 10.61
    Total (ha.) 10.61
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Built Up Area90.27
Total (ha.) 90.27
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNone0Not applicable
(2.)ESAsNone0Not applicable
(3.)ESZsNone0Not applicable
(4.)CorridorsNone0Not applicable
(5.)WLSNone0Not applicable
(6.)NPAKasu Brahmananda Reddy National Park6.3ESE
(7.)Wildlife CorridorsNone0Not applicable
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Defence Installationsnone0Not applicable
(2.)Forestnone0Not applicable
(3.)Archaeological Sitesnone0Not applicable
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 10.61
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Acquired
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Pavo cristatus
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Pedda Lake
(ii)Direction of Water Bodies in Buffer Area South East
(iii)Distance of Water Bodies in Buffer Area 2.54
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 57280
(c)Temporary Employment- During Construction 150
(d)Temporary Employment- During Operation 0
(e)No. of working days 365
(f)Total Manpower 57430
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt25064.01646.2526710.25
(2.)Percentage of Total Project Area23.611.5525.16
(3.)No. of Plants6676631330
(4.)Funds Allocated450000050000009500000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialEmployment will be generated
(2.)FinancialAdditional revenue will be generated
(3.)EnvironmentalGreen area will be developed
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For INFRA-2
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 71.6
(b)Total No. of Flats to be Build 0
(c)No. of Buildings 6
(d)Total plot area (sqm) 106128.90
(e)Total built up area (sqm) 902796.80
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 0
(b)Capacity 0
(c)No. of Recharge Pits 10
(d)Capacity 127.04
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking 8372 ECS
5.
Energy Saving Measures:
(a)Source/Mode Solar & LED
(b)Percentage 1
(c)Quantity 300
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area There will be no impact on water bodies.
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/SA 078
(ii)Name of the EIA Consultant Perfact Enviro Solutions Pvt. Ltd.
(iii)Address Perfact Group, 5th floor/Front wing/NN Mall/Sector-3/Rohini/New Delhi-110085
(iv)Mobile No. 9818362330
(v)Landline No. 0114752846
(vi)Email Id info@perfactgroup.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation INFRA-2
(ix)Validity of Accreditation 27 May 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAThe proposal for amendment in the ToR was considered and recommended by the EAC in its 38th meeting held during 6-8 February, 2019. However, before issue of the Amendment letter, the project proponent has requested for correction/modification in the minute of the 38th meeting. The correction/modification will be considered in the next EAC meeting. Kindly apply for the Environmental Clearance after issue of Amendment in ToR letter. 07 Mar 2019
2.NAThe correction have been made as per the instruction received 24 Apr 2019
3.NAThis is an expansion project. In all expansion cases, Certified Compliance Report issued by the MoEF&CC, Regional Office or concerned regional office of Central Pollution Control Board or the Member Secretary of the respective State Pollution Control Board is to be submitted by the Project Proponent for consideration of the proposal. Kindly submit the same. 02 May 2019
4.NAThe correction have been made as per the instruction received 07 May 2019
5.NAThis is an expansion project. In all expansion cases, Certified Compliance Report issued by the MoEF&CC, Regional Office or concerned regional office of Central Pollution Control Board or the Member Secretary of the respective State Pollution Control Board is to be submitted by the Project Proponent for consideration of the proposal. Kindly submit the same. 24 Jun 2019
6.NAThe correction have been made as per the instruction received 24 Jun 2019
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterIn trail of Query raised on 18.06.2020 Please find the certified compliance report and action taken report 22 Jun 2020
2.NAKindly upload Certified compliance report for further necessary action pl. 18 Jun 2020
3. ADS Reply LetterIn trail of the queries raised in 42nd EAC (Infra-II) Meeting, Please find the attached reply of the respective project. 31 Oct 2019
4.NA

Kindly see the final Minutes of the 42nd EAC (Infra-2) metting held during 10-12 July, 2019

26 Jul 2019
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of Applicantarvind Pandey
DesignationVicePresident
Name of Company (Applicant Name should not be given here)DLF COMMERCIAL DEVELOPERS LIMITED
AddressDLF Centre, 9th floor, sansad marg, new delhi
Print