Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Expansion of Existing Integrated Common Hazardous Waste Treatment Storage and Disposal Facility (ICHWTSDF) at P-32 & P-32 (Part) MIDC, Taloja, Panvel Taluk, Raigad District, Maharashtra by Mumbai Wast
(b)Name of the Company / Organisation MUMBAI WASTE MANAGEMENT LIMITED
(c)Registered Address Plot No P-32, MIDC Taloja, Panvel Taluk, Raigad District, Navi Mumbai,,Raigad,Maharashtra-410208
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Somnath Malgar
(b)Designation (Owner/ Partner/ CEO) Head - Marketing & Business De
(c)Address Mumbai Waste Management Limited, Plot No. P-32, MIDC Taloja, Panvel Taluk, Raigad District, Navi Mumbai-410208,,Panvel,Raigad,Maharashtra-410208
(d)Pin code 410208
(e)E-mail smalgar@resustainability.com
(f)STD Code. 22(f)Telephone No. 27401472
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity7(d) Common hazardous waste treatment, storage and disposal facilities (TSDFs)
Minor Activity7(d) Common hazardous waste treatment, storage and disposal facilities (TSDFs)
(b)Category A
(c)Proposal Number IA/MH/MIS/73479/2018
(d)Master Proposal Number(Single Window) SW/90194/2019
(e)EAC concerned (for category A Projects only) INFRA-2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. P-32 & P-32 (Part)
(b)Pincode 410208
(c)Bounded Latitudes (North)
From
Degree 19.101
Minutes
Second
From
Degree 19.189
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 73.110
Minutes
Second
From
Degree 73.115
Minutes
Second
(e)Survey of India Topo Sheet No. E43B04
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 11
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Maharashtra
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)MaharashtraRaigadPanvel
6.
Details of Terms of Reference (ToR):
(a)Whether TOR is mandatory for submitting application Yes
(b)MoEF&CC / SEIAA File Number 10-36/2018-IA-III
(c)Date of Apply of TOR 06 Apr 2018
(d)Date of Issue of TOR / Standard ToR 17 Oct 2018
(e)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason As per ToR the Public Hearing is exempted for the
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)ICHWTSDF97.3 acresTotal Area
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Secure landfill350000Tons per AnnumRoad
(2.)Incinerator 215000Tons per AnnumRoad
(3.)BMW Incinerator 1250Otherskg/hrRoad
(4.)BMW Incinerator 2250Otherskg/hrRoad
(5.)E-waste5400Tons per AnnumRoad
(6.)Paper Recycling30000Tons per AnnumRoad
(7.)Solvent Recovery9000OthersKilo Liter per AnnumRoad
(8.)Biomedical Waste150OthersTons per MonthRoad
(9.)Autoclave 23000OthersL/batchRoad
(10.)Incinerator 315000Tons per AnnumRoad
(11.)Shreder 2200Otherskg/hrRoad
(12.)Plastic Recycling5000Tons per AnnumRoad
(13.)Alternate Fuel &Raw material facility70OthersTons per dayRoad
(14.)Mild Steel drum recycling15OthersTons per dayRoad
(15.)Incinerator 115000Tons per AnnumRoad
(16.)Shreder 1200Otherskg/hrRoad
(17.)Autoclave 13000OthersL/batchRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 11 Jan 2016
(iv)Valid Upto 01 Mar 2020
(v)File No. BO/RO(HQ)/HWMD/EIC No. NM-5729-15/CR/CC-492
(vi)Application No. NM-5729-15/CR/CC-492
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 40.05
(b) Funds Allocated for Environment Management (Capital) (in Crores) 3.5
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.4
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.35
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 3.2
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 3.2
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Diesel1.6Kilo Litre per DayLocal SuppliersRoad40 Open MarketCopy of Linkage
(2.)Coal9600Tons per AnnumLocal SuppliersRoad250 Open MarketCopy of Linkage
(3.)HSD1.6Kilo Litre per DayLocal SuppliersRoad40 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 03 Sep 2018 To 30 Nov 2018
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 10
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube75.14975.1100
(2.)PM2.5Micro Gram per Meter Cube51.230.451.260
(3.)OthersO3Micro Gram per Meter Cube21.210.921.2100
(4.)NOxMicro Gram per Meter Cube27.518.927.580
(5.)SO2Micro Gram per Meter Cube18.88.718.880
    14.2.     No. of Ground Water monitoring locations : 10
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TDSmg/l8121945002000
(2.)Total Hardnessmg/l503120200600
(3.)Chloridesmg/l214252501000
(4.)Fluoridemg/l0.50.51.01.5
(5.)Heavy MetalsChromiummg/l0.050.010.050
(6.)TSSmg/l10500
(7.)pHNA8.16.98.58.5
(8.)OthersSulphatesmg/l6512200400
    14.3.     No. of Surface Water monitoring locations : 02
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)CODmg/l6846E
(2.)OthersTDSmg/l335194A
(3.)pHNA8.27.9A
(4.)DOmg/l5.14.8B
(5.)BODmg/l2412E
    14.4.     No. of Ambient Noise monitoring locations : 10
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))55.250.655/65
(2.)Leq(Night)A-weighted decibels(dB(A))44.140.745/50
    14.5.     No. of Soil Sample Monitored locations : 10
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Kilogram per hectare15072
(2.)P(Phosphorus)Kilogram per hectare9.46.3
(3.)Electric ConductivityOthersMicrosiemens per Centimeter245132
(4.)K(Potassium)Kilogram per hectare12347
(5.)pHOthersNA8.37.4
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 4 To 5
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.5 To 2
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersMIDC, Taloja58240Copy of Permission LetterPipelineOthersMIDC Taloja SupplyMIDC/171-A/200124 Apr 2001582
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Industrial91150Chemical treatment, sand filter and activated Carbon filterReuse within the Plant & Recycling91
(2.)Domestic2326Septic Tank followed by soak pitOthersSoak Pit230
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 114
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 114
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Incinerator AshBottom Ash2412Tons0RoadSanitary Landfills
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube75.10.81.476.5100
(2.)SO2Microgram per Meter Cube18.80.85.924.780
(3.)NOxMicrogram per Meter Cube27.58010.337.880
(4.)PM2.5Microgram per Meter Cube51.20.81.452.660
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Existing Incinerator Stack 1Hazardous waste401.2SO24.17
(2.)Existing Incinerator stack 1Hazardous waste401.2NOx8.33
(3.)Existing Incinerator Stack 2Hazardous waste401.2PM101.04
(4.)Existing Incinerator Stack 2Hazardous waste401.2NOx8.33
(5.)Proposed incinerator stack 1Hazardous waste501.5SO24.17
(6.)Proposed Incinerator Stack 1Hazardous Waste501.5NOx8.33
(7.)Proposed Incinerator Stack 2Hazardous Waste501.5PM101.04
(8.)Prposed Incinerator Stack 2Hazardous waste501.5NOx8.33
(9.)Existing DG setDiesel100.3PM100.037
(10.)Existing DG setDiesel100.3SO20.028
(11.)Existing DG setDiesel100.3NOx0.73
(12.)Proposed DG setDiesel100.3PM100.022
(13.)Proposed DG setDiesel100.3NOx0.44
(14.)Proposed Boiler Stack 1Coal/CNG300.5SO20.95
(15.)Proposed Boiler Stack 1Coal/CNG300.5NOx0.58
(16.)Proposed Boiler stack 2Coal/CNG300.5PM100.13
(17.)Proposed Boiler Stack 2Coal/CNG300.5NOx0.58
(18.)Existing Incinerator Stack 2Hazardous waste401.2SO24.17
(19.)Proposed DG setDiesel100.3SO20.017
(20.)Proposed Incinerator Stack 3Hazardous Waste501.5PM101.04
(21.)Proposed Incinerator Stack 3Hazardous waste501.5NOx8.33
(22.)Existing Incinerator Stack 1Hazardous waste401.2PM101.04
(23.)Proposed Incinerator stack 1Hazardous waste501.5PM101.04
(24.)Proposed Incinerator Stack 2Hazardous waste501.5SO24.17
(25.)Proposed Incinerator stack 3Hazardous waste501.5SO24.17
(26.)Proposed Boiler stack 1Coal/CNG300.5PM100.13
(27.)Proposed Boiler Stack 2Coal/CNG300.5SO20.95
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 2220
(b)Source Maharashtra state electricity distribution Co. Ltd
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 875+500
(e)Stack Height (in m) 10
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 39.40
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 39.4
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 39.40
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : other 0
    Total (ha.) 39.4
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)LandFill19.32
(2.)Built Up Area3.16
(3.)Green belt13.0
(4.)Othersleachate pond and Roads3.91
Total (ha.) 39.39
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)NPAProtected forest near Malangadh Village4.3East
(2.)CorridorsNil0None in 10 km radius
(3.)ESZsKarnala Bird sanctuary18SW direction
(4.)Wildlife CorridorsNil0None in 10 km radius
(5.)ESAsNil0None in 10 km radius
(6.)WLSKarnala Bird sanctuary21South direction
(7.)Critically Polluted AreaMIDC0Project site located within MIDC
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestReserve Forest near Malangard village4.3East
(2.)Archaeological SitesNil0None in 10 km radius
(3.)Defence InstallationsNil0None in 10 km radius
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 39.40
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Taloje River
(ii)Direction of Water Bodies in Buffer Area South
(iii)Distance of Water Bodies in Buffer Area 0.7
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 11
(b)Permanent Employment-During Operation 50
(c)Temporary Employment- During Construction 120
(d)Temporary Employment- During Operation 125
(e)No. of working days 360
(f)Total Manpower 306
32.
Green Belt in Ha:
(a)Total Area of Green Belt 13
(b)Percentage of Total Project Area 32.99
(c)No. of Plants to be Planted 14000
(d)Funds Allocated for Plantation 8000000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalFacilitating better management of hazardous wastes. Provides a one stop solution for the management of various types of wastes. Minimizes pollution load on environment with an additional benefit of green and clean surroundings. Possibility for recovery of materials thereby conserving the natural resources. Management of wastes is relatively easier and economically viable at a common facility Reduced environmental liability due to captive storage of hazardous waste in the premises of industries.
(2.)SocialThe proposed project would proactively promote the public interest through provision of basic amenities such as roads, transportation, electricity, education, sanitation and healthcare facilities. this would also encourage community growth, development and improved socio-economic conditions and quality of life of the people living in the project area. Better standards of living and grater social awareness
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For INFRA-2
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 9
(b)Total No. of Flats to be Build 1
(c)No. of Buildings 3
(d)Total plot area (sqm) 394000
(e)Total built up area (sqm) 31600
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 31
(b)Capacity 48000
(c)No. of Recharge Pits 31
(d)Capacity 48000
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking 1054 sqm
5.
Energy Saving Measures:
(a)Source/Mode LED bulbs used for Street Lights and common areas
(b)Percentage 18
(c)Quantity 400
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area It will enhance surface storage storage of Harvest
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? Yes
(b)Details of Direction Issued Under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act MPCB/RONM/Directions/181029-FTS-0324 date 29.10.2018 enclosed
(c)Uploaded Copy of Direction Issued Under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act Copy of Direction Issued
(d)Compliance status of the directions Compliance status of the directions Ref No. MWML/M
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1518/SA 061
(ii)Name of the EIA Consultant Ramky Enviro Services Pvt Ltd
(iii)Address Ramky Grandiose, 12th Floor, Ramky Towers Complex, Gachibowli, Hyderabad
(iv)Mobile No. 9949991029
(v)Landline No. 0402315000
(vi)Email Id vvijaykumar@ramky.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation INFRA-2
(ix)Validity of Accreditation 20 May 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantSomnath Malgar
DesignationHead - Marketing & Business De
Name of Company (Applicant Name should not be given here)MUMBAI WASTE MANAGEMENT LIMITED
AddressPlot No P-32, MIDC Taloja, Panvel Taluk, Raigad District, Navi Mumbai
Print