Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Integrated Common Hazardous Waste Treatment, Storage and Disposal Facility (CHWTSDF) at Village- Kadechur, Teshil- Yadgir, Karnataka
(b)Name of the Company / Organisation MOTHER EARTH ENVIRON TECH PRIVATE LIMITED, BENGALURU
(c)Registered Address No. 2542, 17th main, 28th cross, Banashankari, 2nd stage, Near BDA Complex, Bengaluru, Karnataka.,,Bangalore Urban,Karnataka-560070
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Thigalanahalli Ningegowda Paramesh
(b)Designation (Owner/ Partner/ CEO) MD
(c)Address No. 2542, 17th main, 28th cross, Banashankari, 2nd stage, Near BDA Complex, Bengaluru, Karnataka.,,Bangalore South,Bangalore Urban,Karnataka-560070
(d)Pin code 560070
(e)E-mail kadechur1@gmail.com
(f)STD Code. 80(f)Telephone No. 26712303
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity7(d) Common hazardous waste treatment, storage and disposal facilities (TSDFs)
Minor Activity7(d) Common hazardous waste treatment, storage and disposal facilities (TSDFs)
(b)Category A
(c)Proposal Number IA/KA/MIS/73814/2018
(d)Master Proposal Number(Single Window) SW/90112/2018
(e)EAC concerned (for category A Projects only) INFRA-2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Plot No. 158 to 164
(b)Pincode 585221
(c)Bounded Latitudes (North)
From
Degree 16.518862
Minutes
Second
From
Degree 16.51901
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 77.308683
Minutes
Second
From
Degree 77.311899
Minutes
Second
(e)Survey of India Topo Sheet No. E43X2, E43X3, E43X6, E43X7
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 374
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 8
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 2
(c)Main State of the project Karnataka
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)KarnatakaYadgirYadgir
6.
Details of Terms of Reference (ToR):
(a)Whether TOR is mandatory for submitting application Yes
(b)MoEF&CC / SEIAA File Number 10-37/2018-IA-III
(c)Date of Apply of TOR 06 Apr 2018
(d)Date of Issue of TOR / Standard ToR 01 Jan 1900
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason Already Public Hearing Conducted for KIADB industr
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Rotary kiln primary chamber type Phase II24 MTPA
(2.)Incineration Phase I12 MTPA
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Land Area16.2HectaresOthersNil
(2.)Secured Landfill1.2OthersMillion TonsOthersNil
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 59.4869
(b) Funds Allocated for Environment Management (Capital) (in Crores) 1.6
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 1.19
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.3352
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? Yes
d)Inter-State boundaries and international boundaries Yes
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 1.6
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 1.6
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)HSD1.6Kilo Litre per DayNearby Petrol PumpRoad15 Open MarketCopy of Linkage
(2.)Water40Kilo Litre per DayKIADBRoad5 OthersINDUSTRIAL AREA WATER SUPPLYCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Dec 2017 To 28 Feb 2018
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube73.656.773.4100
(2.)PM2.5Micro Gram per Meter Cube32.612.132.460
(3.)NOxMicro Gram per Meter Cube37.211.337.180
(4.)SO2Micro Gram per Meter Cube3211.317.680
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHOthersNA7.857.216.58.5
(2.)Fluoridemg/l0.50.511.5
(3.)Total Hardnessmg/l440215200600
(4.)TDSmg/l18403955002000
(5.)Chloridesmg/l650.8621.532501000
(6.)TSSmg/l0000
(7.)Heavy MetalsMagnesiummg/l68.0418.2330100
    14.3.     No. of Surface Water monitoring locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.947.62C
(2.)OthersTDSmg/l355145C
(3.)CODmg/l44C
(4.)DOmg/l5.35.1C
(5.)BODmg/l2.01.0C
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))5550.275
(2.)Leq(Night)A-weighted decibels(dB(A))43.14070
    14.5.     No. of Soil Sample Monitored locations : 5
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)P(Phosphorus)Milligram per Kilogram8412.4
(2.)pHOthersNA7.166.66
(3.)K(Potassium)Milligram per Kilogram246.5120.5
(4.)Electric ConductivityMillisiemens per Centimetre145.523.3
(5.)N(Nitrogen)Milligram per Kilogram70.854.88
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.15 To 8.75
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.77 To 9.53
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface408.5Copy of Permission LetterPipelineOthersPIPELINEI&C/ID/SLSWCC-90/E-2/2015-1607 Apr 201640
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)INCINERATOR SCRUBBING LAND FILL LEACHATE LAB USE275000TERTIARY TREATMENTReuse within the Plant & Recycling27
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 27
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 27
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)NILHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0Tons0RoadTreatment, Storage and Disposal Facility(TSDF)
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)NOxMicrogram per Meter Cube33.911.335.280
(2.)PM10Microgram per Meter Cube7211.474100
(3.)PM2.5Microgram per Meter Cube15.110.1515.360
(4.)SO2Microgram per Meter Cube27.715.733.880
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)150 KVA DG SetDIESEL100.15PM100.338
(2.)INCINERATORDIESEL300.9PM100.373
(3.)150 KVA DG SETDIESEL100.15SO20.59
(4.)INCINERATORDIESEL300.9SO21.492
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 2000
(b)Source GESCOM
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 150 KVA
(e)Stack Height (in m) 10
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 16.2
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 16.2
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 2629.8
(b)Waste/Barren Land (ha.) 44081.61
(c)Grazing/ Community Land (ha.) 386.63
(d)Surface Water Bodies (ha.) 1.5
(e)Settlements (ha.) 0
(f)Industrial (ha.) 0
(g)Forest (ha.) 27.45
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Area Not Available for Cultivation 2229.10
    Total (ha.) 49356.09
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)LandFill6.57
(2.)Green belt5.4
(3.)Built Up Area0.663
(4.)Area for Solid Waste Management3.567
Total (ha.) 16.2
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNA0NA
(2.)NPANA0NA
(3.)ESAsNA0NA
(4.)ESZsNA0NA
(5.)CorridorsNA0NA
(6.)Wildlife CorridorsNA0NA
(7.)WLSNA0NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNA0NA
(2.)Defence InstallationsNA0NA
(3.)OthersNANA0NA
(4.)ForestNA0NA
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 16.2
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Already acquired by KIADB
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Yet To Start
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Bhima River
(ii)Direction of Water Bodies in Buffer Area South West
(iii)Distance of Water Bodies in Buffer Area 8.5
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 5
(b)Permanent Employment-During Operation 20
(c)Temporary Employment- During Construction 10
(d)Temporary Employment- During Operation 5
(e)No. of working days 300
(f)Total Manpower 40
32.
Green Belt in Ha:
(a)Total Area of Green Belt 5.346
(b)Percentage of Total Project Area 33.00
(c)No. of Plants to be Planted 8000
(d)Funds Allocated for Plantation 1700000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalTo avoid unauthorized disposal of hazardous waste. By safe handling and disposal of hazardous waste in eco friendly manner.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For INFRA-2
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 4
(b)Total No. of Flats to be Build 0
(c)No. of Buildings 4
(d)Total plot area (sqm) 162000
(e)Total built up area (sqm) 5900
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 0
(b)Capacity 0
(c)No. of Recharge Pits 0
(d)Capacity 0
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking CAR-5 TWO WHEEL- 30 (AREA 600 Sq m)
5.
Energy Saving Measures:
(a)Source/Mode NA
(b)Percentage 0
(c)Quantity 0
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area Storm Water Management- All the surface runoff sha
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1720/RA0090
(ii)Name of the EIA Consultant Visiontek Consultancy Services Pvt. Ltd.
(iii)Address Plot No. M-22 & 23, Chandaka Industrial Estate, Bhubaneswar-751024, Dist- Khurda, Odisha
(iv)Mobile No. 9338822732
(v)Landline No. 0674645178
(vi)Email Id visiontekin@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation INFRA-2
(ix)Validity of Accreditation 13 Mar 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAAs per ToR condition No. (v) Certified Compliance Report issued by the MoEF&CC, Regional Office or concerned Regional Office of Central Pollution Control Board or the Member Secretary of the respective State Pollution Control Board for the conditions stipulated in the environmental clearance issued to KIADB Industrial Estate by MoEE&CC vide Letter No. 21-8/2014-IA-III, dated 14thOctober, 2016 along with an action taken report on issues which have been stated to be partially complied or non/not complied. Kindly submit the same. Also point wise ToR compliance given in the EIA/EMP Report do not match with the conditions given in ToR letter dated 27.07.2018. Kindly revised and re-submit. 23 Jan 2019
2.NAThe correction have been made as per the instruction received 02 Feb 2019
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterADS compliance reply as per minutes of 39th meeting of EAC (Infra-2) 30 Apr 2019
2.NA

Kindly see the final minutes of 39th meeting of EAC (Infra-2)

05 Apr 2019
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantThigalanahalli Ningegowda Paramesh
DesignationMD
Name of Company (Applicant Name should not be given here)MOTHER EARTH ENVIRON TECH PRIVATE LIMITED, BENGALURU
AddressNo. 2542, 17th main, 28th cross, Banashankari, 2nd stage, Near BDA Complex, Bengaluru, Karnataka.
Print