Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Expansion of Sponge Iron Plant of MSP Steel and Power Ltd., locatted at Jamgaon village, Raigarh district, Chhattisgarh for production from 3,00,000 TPA to 3,75,000 TPA through process optimization an
(b)Name of the Company / Organisation MSP STEEL AND POWER LIMITED
(c)Registered Address MSP Steel & Power Limited, Jamgaon village, Raigarh district, Chhattisgarh,,Raigarh,Chhattisgarh-496001
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Pradip Kumar Dey
(b)Designation (Owner/ Partner/ CEO) Chief Corporate Officer
(c)Address MSP Steel and Power Ltd. 1, Crooked Lane, Kolkata- 700 069,,,Kolkata,West Bengal-700069
(d)Pin code 700069
(e)E-mail pk.dey@mspsteel.com
(f)STD Code. 33(f)Telephone No. 40057777
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity3(a) Metallurgical industries (ferrous & non ferrous)
Minor Activity3(a) Metallurgical industries (ferrous & non ferrous)
(b)Category A
(c)Proposal Number IA/CG/IND/90078/2018
(d)Master Proposal Number(Single Window) SW/90077/2018
(e)EAC concerned (for category A Projects only) NIL
(f)Project Type Expansion under para 7(ii)
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 1, 2, 3, 4/1, 4/2, 4/3, 4/4, 4/5, 4/6, 6/1, 6/2, 7
(b)Pincode 496001
(c)Bounded Latitudes (North)
From
Degree 21.87514
Minutes
Second
From
Degree 21.88737
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 83.54177
Minutes
Second
From
Degree 83.55763
Minutes
Second
(e)Survey of India Topo Sheet No. 64O/9
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 243
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 1.5
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Chhattisgarh
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)ChhattisgarhKappapahad village
6.
Details of Terms of Reference (ToR)/EC: Not Applicable
4.
Whether the Project Exempted from Public Hearing? Details Not Applicable
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Nagpur
(iii)Letter No. 5-189/2009 (ENV)/3993
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Jun 6 2018 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Sponge Iron plant30000075000375000Tons per Annum(TPA)OthersInhouse Consumption and Sold
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)DRI Kilns3x100-3x100125 TPD production from each Kiln without any Change /modification in Kilns
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 13 Oct 2017
(iv)Valid Upto 31 Oct 2019
(v)File No. 3844/TS/CECB/2017
(vi)Application No. 493650
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 1070
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 855750
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 855750
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Iron ore63000Tons per AnnumChhattisgarhRoad300 LinkageCopy of Linkage
(2.)Iron ore pellets472500Tons per AnnumChhattisgarhOthersIn House0 OthersIn HouseCopy of Linkage
(3.)Limestone/Dolomite11250Tons per AnnumOpen MarketRoad100 LinkageCopy of Linkage
(4.)Indian Coal52500Tons per AnnumCCLRoad400 LinkageCopy of Linkage
(5.)Imported Coal256000Tons per AnnumCCLRoad400 LinkageCopy of Linkage
16.
Baseline Data Not Applicable
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 4 To 9
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 3 To 6
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface7505Copy of Permission LetterPipelineOthersPipeline115709 Apr 20138289.2
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)NA000OthersNot Applicable00
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 0
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)NAOthersNot Applicable0Tons0OthersNAOthersNA
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube530053100
(2.)PM2.5Microgram per Meter Cube20002060
(3.)NOxMicrogram per Meter Cube15001580
(4.)SO2Microgram per Meter Cube30003080
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DRI#1 with WHRBCoal451.5PM100
(2.)DRI#2 with WHRBCoal451.5PM100
(3.)DRI#3 with WHRBCoal451.5PM100
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 1902
(b)Source Captive Power Plant
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) NA
(e)Stack Height (in m) 0
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 218.9
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 218.9
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 3548
(b)Waste/Barren Land (ha.) 13062
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 3265
(e)Settlements (ha.) 816
(f)Industrial (ha.) 62
(g)Forest (ha.) 9357
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 1287
(j)Others (ha.) : NA 0
    Total (ha.) 31397
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)OthersTotal Plant218.9
Total (ha.) 218.9
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)CorridorsNA0No Migratory Corridors within 10 km radius of Project site
(2.)NPANA0No NPA within 10 km radius of Project site
(3.)Critically Polluted AreaNA0No Critically Polluted area within 10 km radius of Project site
(4.)ESZsNA0No ESZs within 10 km radius of Project site
(5.)Wildlife CorridorsNA0No Wildlife corridors within 10 km radius of Project site
(6.)WLSNA0No WLS within 10 km radius of Project site
(7.)ESAsNA0No ESAs within 10 km radius of Project site
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Defence InstallationsNA0No Defence Installation within 10 km radius of Project site
(2.)ForestNA0No Forest within 10 km radius of project site
(3.)Archaeological SitesNA0No Archaeological sites within 10 km radius of Project site
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 218.9
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Sapnai River
(ii)Direction of Water Bodies in Buffer Area West
(iii)Distance of Water Bodies in Buffer Area 3.9
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 50
(b)Permanent Employment-During Operation 50
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 100
(e)No. of working days 335
(f)Total Manpower 200
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt72.9072.9
(2.)Percentage of Total Project Area33033
(3.)No. of Plants36500036500
(4.)Funds Allocated730000007300000
    33.       Project Benefits
S. No. Type of Project BenefitsDetails of Project Benefits
NIL
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 1
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/SA077
(ii)Name of the EIA Consultant Vardan Environet
(iii)Address D-142, Ground Floor, Sushant Lok-III, Golf Course Ext. Road, Sector-57, Gurugram, Haryana- 122002
(iv)Mobile No. 9953147268
(v)Landline No. 0124429103
(vi)Email Id industry@vardanenvironet.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 1
(ix)Validity of Accreditation 09 Nov 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NA1. Implementation status of the existing units have not been submitted. 2. Source of imported coal and mode of transportation of coal from source to the plant site has not been submitted. 3. Water drawl permission has not been submitted. 4. Addendum to the original EMP for the proposed expansion inter-alia including resource requirement, pollution load comparison, traffic load comparison, AAQ modelling Vis-a-Vis with original environmental clearance and requisite pollution control measures have not been submitted. It is requested to submit these information for further processing of the proposal. 11 Mar 2019
2.NAThe correction have been made as per the instruction received 23 Apr 2019
3.NAClosure report from Regional Office – Nagpur on the observed non-compliances mentioned in the certified compliance report dated 31/07/2018 shall be submitted. 18 May 2019
4.NAClosure report from Regional Office – Nagpur on the observed non-compliances mentioned in the certified compliance report dated 31/07/2018 shall be submitted. 18 May 2019
5.NAThe correction have been made as per the instruction received 25 May 2019
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterReply of ADS generated on 26/06/2019 for MSP Steel and Power Ltd. 24 Sep 2019
2.NA

Deferred for want of additional information. 

13 Jul 2019
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantPradip Kumar Dey
DesignationChief Corporate Officer
Name of Company (Applicant Name should not be given here)MSP STEEL AND POWER LIMITED
AddressMSP Steel & Power Limited, Jamgaon village, Raigarh district, Chhattisgarh
Print