1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Expansion of Sponge Iron Plant of MSP Steel and Power Ltd., locatted at Jamgaon village, Raigarh district, Chhattisgarh for production from 3,00,000 TPA to 3,75,000 TPA through process optimization an | (b)Name of the Company / Organisation | MSP STEEL AND POWER LIMITED | (c)Registered Address | MSP Steel & Power Limited, Jamgaon village, Raigarh district, Chhattisgarh,,Raigarh,Chhattisgarh-496001 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Pradip Kumar Dey | (b)Designation (Owner/ Partner/ CEO) | Chief Corporate Officer | (c)Address | MSP Steel and Power Ltd. 1, Crooked Lane, Kolkata- 700 069,,,Kolkata,West Bengal-700069 | (d)Pin code | 700069 | (e)E-mail | pk.dey@mspsteel.com | (f)STD Code. | 33(f)Telephone No. | 40057777 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 3(a) Metallurgical industries (ferrous & non ferrous)
| Minor Activity | 3(a) Metallurgical industries (ferrous & non ferrous)
| (b)Category | A | (c)Proposal Number | IA/CG/IND/90078/2018 | (d)Master Proposal Number(Single Window) | SW/90077/2018 | (e)EAC concerned (for category A Projects only) | NIL | (f)Project Type | Expansion under para 7(ii) |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | 1, 2, 3, 4/1, 4/2, 4/3, 4/4, 4/5, 4/6, 6/1, 6/2, 7 | (b)Pincode | 496001 | (c)Bounded Latitudes (North) | | From | | Degree | 21.87514 | Minutes | | Second | | From | | Degree | 21.88737 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 83.54177 | Minutes | | Second | | From | | Degree | 83.55763 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 64O/9 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 243 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 1.5 | (j)Seismic Zone | 2 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Chhattisgarh | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Chhattisgarh | | | Kappapahad village | |
|
6. | Details of Terms of Reference (ToR)/EC: | Not Applicable | |
|
4. | Whether the Project Exempted from Public Hearing? | Details Not Applicable | |
|
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Nagpur | (iii)Letter No. | 5-189/2009 (ENV)/3993 | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Jun 6 2018 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Sponge Iron plant | 300000 | 75000 | 375000 | Tons per Annum(TPA) | | Others | Inhouse Consumption and Sold | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | DRI Kilns | 3x100 | - | 3x100 | 125 TPD production from each Kiln without any Change /modification in Kilns | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 13 Oct 2017 | (iv)Valid Upto | 31 Oct 2019 | (v)File No. | 3844/TS/CECB/2017 | (vi)Application No. | 493650 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 1070 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 0 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 855750 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 855750 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Iron ore | 63000 | Tons per Annum | | Chhattisgarh | Road | | 300 | Linkage | | Copy of Linkage | (2.) | Iron ore pellets | 472500 | Tons per Annum | | Chhattisgarh | Others | In House | 0 | Others | In House | Copy of Linkage | (3.) | Limestone/Dolomite | 11250 | Tons per Annum | | Open Market | Road | | 100 | Linkage | | Copy of Linkage | (4.) | Indian Coal | 52500 | Tons per Annum | | CCL | Road | | 400 | Linkage | | Copy of Linkage | (5.) | Imported Coal | 256000 | Tons per Annum | | CCL | Road | | 400 | Linkage | | Copy of Linkage | |
|
16. | Baseline Data | Not Applicable | |
|
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 4 To 9 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 3 To 6 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Surface | | 750 | 5 | Copy of Permission Letter | Pipeline | | Others | Pipeline | 1157 | 09 Apr 2013 | 8289.2 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | NA | 0 | 0 | 0 | Others | Not Applicable | 0 | 0 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 0 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 0 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | NA | Others | Not Applicable | 0 | Tons | 0 | Others | NA | Others | NA | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 53 | 0 | 0 | 53 | 100 | (2.) | PM2.5 | | Microgram per Meter Cube | 20 | 0 | 0 | 20 | 60 | (3.) | NOx | | Microgram per Meter Cube | 15 | 0 | 0 | 15 | 80 | (4.) | SO2 | | Microgram per Meter Cube | 30 | 0 | 0 | 30 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | DRI#1 with WHRB | Coal | 45 | 1.5 | PM10 | | 0 | (2.) | DRI#2 with WHRB | Coal | 45 | 1.5 | PM10 | | 0 | (3.) | DRI#3 with WHRB | Coal | 45 | 1.5 | PM10 | | 0 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 1902 | (b)Source | Captive Power Plant | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | NA | (e)Stack Height (in m) | 0 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 218.9 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 218.9 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 3548 | (b)Waste/Barren Land (ha.) | 13062 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 3265 | (e)Settlements (ha.) | 816 | (f)Industrial (ha.) | 62 | (g)Forest (ha.) | 9357 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 1287 | (j)Others (ha.) : NA | 0 | Total (ha.) | 31397 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Others | Total Plant | 218.9 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Corridors | NA | 0 | No Migratory Corridors within 10 km radius of Project site | (2.) | NPA | NA | 0 | No NPA within 10 km radius of Project site | (3.) | Critically Polluted Area | NA | 0 | No Critically Polluted area within 10 km radius of Project site | (4.) | ESZs | NA | 0 | No ESZs within 10 km radius of Project site | (5.) | Wildlife Corridors | NA | 0 | No Wildlife corridors within 10 km radius of Project site | (6.) | WLS | NA | 0 | No WLS within 10 km radius of Project site | (7.) | ESAs | NA | 0 | No ESAs within 10 km radius of Project site | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Defence Installations | | NA | 0 | No Defence Installation within 10 km radius of Project site | (2.) | Forest | | NA | 0 | No Forest within 10 km radius of project site | (3.) | Archaeological Sites | | NA | 0 | No Archaeological sites within 10 km radius of Project site | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 218.9 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | 0 | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Sapnai River | (ii)Direction of Water Bodies in Buffer Area | West | (iii)Distance of Water Bodies in Buffer Area | 3.9 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 50 | (b)Permanent Employment-During Operation | 50 | (c)Temporary Employment- During Construction | 0 | (d)Temporary Employment- During Operation | 100 | (e)No. of working days | 335 | (f)Total Manpower | 200 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 72.9 | 0 | 72.9 | (2.) | Percentage of Total Project Area | 33 | 0 | 33 | (3.) | No. of Plants | 36500 | 0 | 36500 | (4.) | Funds Allocated | 7300000 | 0 | 7300000 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
NIL | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 1 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1619/SA077 | (ii)Name of the EIA Consultant | Vardan Environet | (iii)Address | D-142, Ground Floor, Sushant Lok-III, Golf Course Ext. Road, Sector-57, Gurugram, Haryana- 122002 | (iv)Mobile No. | 9953147268 | (v)Landline No. | 0124429103 | (vi)Email Id | industry@vardanenvironet.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 1 | (ix)Validity of Accreditation | 09 Nov 2019 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | 1. Implementation status of the existing units have not been submitted. 2. Source of imported coal and mode of transportation of coal from source to the plant site has not been submitted. 3. Water drawl permission has not been submitted. 4. Addendum to the original EMP for the proposed expansion inter-alia including resource requirement, pollution load comparison, traffic load comparison, AAQ modelling Vis-a-Vis with original environmental clearance and requisite pollution control measures have not been submitted. It is requested to submit these information for further processing of the proposal. | 11 Mar 2019 | 2. | NA | The correction have been made as per the instruction received | 23 Apr 2019 | 3. | NA | Closure report from Regional Office – Nagpur on the observed non-compliances mentioned in the certified compliance report dated 31/07/2018 shall be submitted. | 18 May 2019 | 4. | NA | Closure report from Regional Office – Nagpur on the observed non-compliances mentioned in the certified compliance report dated 31/07/2018 shall be submitted. | 18 May 2019 | 5. | NA | The correction have been made as per the instruction received | 25 May 2019 | |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | Reply of ADS generated on 26/06/2019 for MSP Steel and Power Ltd. | 24 Sep 2019 | 2. | NA | Deferred for want of additional information. | 13 Jul 2019 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Pradip Kumar Dey | Designation | Chief Corporate Officer | Name of Company (Applicant Name should not be given here) | MSP STEEL AND POWER LIMITED | Address | MSP Steel & Power Limited, Jamgaon village, Raigarh district, Chhattisgarh |
|