Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) DEVI CHEMSCIENCE PVT. LTD. (DCPL)
(b)Name of the Company / Organisation DEVI CHEMSCIENCE PRIVATE LIMITED
(c)Registered Address Plot No.C-174/1, Chincholi MIDC, Tal.Mohol, Dist. Solapur,,Solapur,Maharashtra-413255
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Ramsingh S Rawat
(b)Designation (Owner/ Partner/ CEO) Director
(c)Address Plot No.7, CTS 2224, Vatan Nagar, Talegaon- Chakan Road, Talegaon Dabhade, Dist. Pune 410507, MS.,,Mawal,Pune,Maharashtra-410507
(d)Pin code 410507
(e)E-mail vivekrawat@badrivishal.com
(f)STD Code. 2114(f)Telephone No. 224653
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
Minor Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
(b)Category A
(c)Proposal Number IA/MH/IND2/71771/2017
(d)Master Proposal Number(Single Window) SW/90055/2018
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Plot No. C-174/1, Chincholi MIDC, Tal.: Mohol, Dis
(b)Pincode 413224
(c)Bounded Latitudes (North)
From
Degree 174605.84
Minutes
Second
From
Degree 174611.58
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 754857.85
Minutes
Second
From
Degree 754903.14
Minutes
Second
(e)Survey of India Topo Sheet No. 47 O/9, 47 O/10, 47 O/13, 41 O/14
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 495
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 6.5
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Maharashtra
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)MaharashtraSolapurMohol
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/580/2017-IA-II(I)
(b)Date of Apply of TOR 22 Dec 2017
(c)Date of Issue of TOR / Standard ToR 05 Feb 2018
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason Project is located in notified MIDC Area
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)5.275 MTPDBulk Drugs and Intermediate Manufacturing Unit
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Metoprolol Succinate& Intermediates36Tons per AnnumRoad
(2.)Metoprolol Tartrate & Intermediates36Tons per AnnumRoad
(3.)Acetozolamide & Intermediates24Tons per AnnumRoad
(4.)Bambutetrol HCl & Intermediates0.3Tons per AnnumRoad
(5.)Defriprone & Intermediates2.4Tons per AnnumRoad
(6.)Dioctyl Calcium Sulfosuccinate & Intermediates12Tons per AnnumRoad
(7.)Dioctyl Potassium Sulfosuccinate & Intermediates12Tons per AnnumRoad
(8.)Dioctyl Sodium Sulfosuccinate & Intermediates600Tons per AnnumRoad
(9.)Levo Salbutamol Sulphate & Intermediates0.3Tons per AnnumRoad
(10.)Tiotropium Bromide & Intermediates0.06Tons per AnnumRoad
(11.)Moxifloxacin Hydrochloride12Tons per AnnumRoad
(12.)Pregabalin & Intermediate72Tons per AnnumRoad
(13.)Carbimazole & Intermediate12Tons per AnnumRoad
(14.)Methimazole & Intermediate6Tons per AnnumRoad
(15.)Carvedilol & Intermediate9Tons per AnnumRoad
(16.)Guaifenesin & Intermediates240Tons per AnnumRoad
(17.)(R)-Bambutetrol HCl &Intermediates0.3Tons per AnnumRoad
(18.)Levetiracetam & Intermediates60Tons per AnnumRoad
(19.)Bromohexine Hydrochloride & Intermediates48Tons per AnnumRoad
(20.)Clopidogrel Bisulfate & Intermediates24Tons per AnnumRoad
(21.)Permethrin & Intermediates24Tons per AnnumRoad
(22.)Quinaldic Acid72Tons per AnnumRoad
(23.)Diamyl Sodium sulfosuccinate and Solution360Tons per AnnumRoad
(24.)Ondansetron & Intermediate9Tons per AnnumRoad
(25.)Dorzolamide Hydrochloride & Intermediates0.3Tons per AnnumRoad
(26.)Formoterol Fumarate Dihydrate & Intermediates0.06Tons per AnnumRoad
(27.)Furosemide & Intermediates24Tons per AnnumRoad
(28.)Ipratropium Bromide & Intermediates0.06Tons per AnnumRoad
(29.)Methocarbamol & Intermediates60Tons per AnnumRoad
(30.)Salbutamol Sulphate & Intermediates36Tons per AnnumRoad
(31.)Salmetrol Xinafoate & Intermediates0.06Tons per AnnumRoad
(32.)Moxifloxacin Intermediate36Tons per AnnumRoad
(33.)Chlorphenesin & Intermediates72Tons per AnnumRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 25
(b) Funds Allocated for Environment Management (Capital) (in Crores) 3.20
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.625
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.07
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? Yes
a)Protected areas notified under the wildlife (Protection) Act, 1972 Yes
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 8640
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 8640
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Toluene25534.52OthersKg/BatchMarketRoad100 Open MarketCopy of Linkage
(2.)Bromine1874OthersKg/BatchOpen MarketRoad500 Open MarketCopy of Linkage
(3.)ammonia solution488.5OthersKg/BatchOpen MarketRoad500 Open MarketCopy of Linkage
(4.)Acetic Acid825OthersKg/BatchOpen MarketRoad500 Open MarketCopy of Linkage
(5.)Coal8640Tons per AnnumOpen MarketRoad500 Open MarketCopy of Linkage
(6.)Methanol21237.85OthersKg/BatchOpen MarketRoad500 Open MarketCopy of Linkage
(7.)Ethyl Acetate3311OthersKg/BatchOpen MarketRoad500 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Feb 2018 To 30 Apr 2018
(b)Season Pre-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube22.8310.0617.2760
(2.)SO2Micro Gram per Meter Cube29.99.6617.2780
(3.)OthersNH3Micro Gram per Meter Cube23.539.423.36400
(4.)PM10Micro Gram per Meter Cube73.1644.460.21100
(5.)NOxMicro Gram per Meter Cube38.6314.138.5480
    14.2.     No. of Ground Water monitoring locations : 3
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.487.286.58.5
(2.)Chloridesmg/l364.59256.63250250
(3.)Total Hardnessmg/l301.97231.78200200
(4.)Fluoridemg/l0.750.1811
(5.)Heavy MetalsZink as Znmg/l3.982.1155
(6.)TSSmg/l80.1255.41100200
(7.)TDSmg/l1578.51962.57500500
    14.3.     No. of Surface Water monitoring locations : 2
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.437.28E
(2.)DOmg/l4.83.7E
(3.)OthersTotal ColiOthersNo./100 ml13378B
(4.)CODmg/l28.4725.96E
(5.)BODmg/l10.469.72E
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))61.333.970
(2.)Leq(Day)A-weighted decibels(dB(A))68.74775
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Kilogram per hectare689282.6
(2.)pHOthersNA7.547.05
(3.)P(Phosphorus)Kilogram per hectare406.9191.8
(4.)K(Potassium)Kilogram per hectare254.6177.5
(5.)Electric ConductivityMillisiemens per Centimetre0.90.17
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.5 To 12.8
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.0041 To 4
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface368 Not Appliacble PipelineJack WellMIDC/RO(ROS)/CHN/LMS/1134/2014582712 Dec 201436
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Stream I4040ETPOthersWater Loss in ETP operations346
(2.)Stream II33ETPOthersWater Loss in ETP operations21
(3.)Domestic Effluent5.45.4STPOthersFlushing5.40
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 48.4
(b)Total Discharged Water (Kilolitre per Day) 7
(c)Total Reused Water (Kilolitre per Day) 41.4
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)AshBottom Ash864Tons50RoadOthersSale to Brick Manufacturers
(2.)Spent CatalystHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.84Tons250RoadTreatment, Storage and Disposal Facility(TSDF)
(3.)Salts Generated from MEEHazardous Waste (as per Hazardous and Other Waste Management rules 2016)24Tons20RoadAuthorized Recyclers
(4.)Plastic and Paper WastePlastic Waste24Tons5RoadOthersTo sale
(5.)Process Residue and WastesHazardous Waste (as per Hazardous and Other Waste Management rules 2016)Scrap96Tons250RoadTreatment, Storage and Disposal Facility(TSDF)
(6.)Spent CarbonHazardous Waste (as per Hazardous and Other Waste Management rules 2016)20.4Tons250RoadTreatment, Storage and Disposal Facility(TSDF)
(7.)Spent SolventHazardous Waste (as per Hazardous and Other Waste Management rules 2016)600Tons50RoadAuthorized Recyclers
(8.)ETP SludgeHazardous Waste (as per Hazardous and Other Waste Management rules 2016)60Tons250RoadTreatment, Storage and Disposal Facility(TSDF)
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube60.2110.861.01100
(2.)PM2.5Microgram per Meter Cube17.2710.217.4760
(3.)SO2Microgram per Meter Cube29.651837.6580
(4.)NOxMicrogram per Meter Cube38.541000080
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)1010 KVA D.G. SetHigh Speed Diesel6.50.5SO220
(2.)2 TPH (2 Nos.)24 TPD/48 TPD300.3PM10800
(3.)Thermic Fluid HeaterFurnace oil180.3SO2400
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 1133
(b)Source M.E.D.CO LTD.
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 1010 KVA
(e)Stack Height (in m) 5
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 1.63
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 1.63
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 14754.60
(b)Waste/Barren Land (ha.) 1854.68
(c)Grazing/ Community Land (ha.) 1330
(d)Surface Water Bodies (ha.) 213
(e)Settlements (ha.) 00
(f)Industrial (ha.) 00
(g)Forest (ha.) 4587
(h)Mangroves (ha.) 00
(i)Marine Area (ha.) 00
(j)Others (ha.) : Fallow Land 8676.22
    Total (ha.) 31415.5
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Built Up Area0.73086
(2.)Green belt0.5382
Total (ha.) 1.26906
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNA0There is no presence of any CPA, NPA, ESAs, ESZ corridor and wildlife corridors in 10 Km radius of project
(2.)NPANA0There is no presence of any CPA, NPA, ESAs, ESZ corridor and wildlife corridors in 10 Km radius of project
(3.)WLSGreat Indian Bustard0.65Letter w.r.t. distance of project site from Great Indian Bustard Bird Sanctuary is received from forest department, Solapur. Same was appended in Form I application submitted to MoEfCC, New Delhi
(4.)ESZsNA0There is no presence of any CPA, NPA, ESAs, ESZ corridor and wildlife corridors in 10 Km radius of project
(5.)Wildlife CorridorsNA0There is no presence of any CPA, NPA, ESAs, ESZ corridor and wildlife corridors in 10 Km radius of project
(6.)CorridorsNA0There is no presence of any CPA, NPA, ESAs, ESZ corridor and wildlife corridors in 10 Km radius of project
(7.)ESAsNA0There is no presence of any CPA, NPA, ESAs, ESZ corridor and wildlife corridors in 10 Km radius of project
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNA0There is no forest land within 10 km from project site
(2.)Defence InstallationsNA0There is no any defence installations within 10 km from project site
(3.)Archaeological SitesNA0There is no archaeological sites within 10 km from project site
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? Selec
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 1.6
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Sina River
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 10
(b)Permanent Employment-During Operation 30
(c)Temporary Employment- During Construction 40
(d)Temporary Employment- During Operation 40
(e)No. of working days 365
(f)Total Manpower 120
32.
Green Belt in Ha:
(a)Total Area of Green Belt 0.5381
(b)Percentage of Total Project Area 33.01
(c)No. of Plants to be Planted 800
(d)Funds Allocated for Plantation 1200000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)Social1. Employment generation 2. Improvement in the Physical & Social Infrastructure 3. Upliftment of local peoples
(2.)Financial1. The community that resides in the nearby areas will be benefited directly or indirectly by this project 2. After establishment, the industry will meet the national interest of economical growth through sustainable development,
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1518/SA 063
(ii)Name of the EIA Consultant Equinox Environments India Pvt. Ltd.
(iii)Address F-11, Namdev Nest, 1160-B, ā€˜Eā€™ Ward, Sykes Extension, Opposite Kamala College
(iv)Mobile No. 9657865122
(v)Landline No. 0231253123
(vi)Email Id eia@equinoxenvi.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 21 Oct 2018
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAPlease inform/clarify the following:- - Accreditation of the EIA consultant is valid only up to 21/10/2018. How the present proposal is admissible. - Notification of Chincholi Industrial area by the State Government of Maharashtra along with the supporting documents. - Proposed fresh water requirement of 36 cum/day needs to be reworked out in view of production capacity of the plant is limited to 5.275 TPD. Also, there is no permission letter/file attached showing surface water supply of 36 cum/day. - Applicability of general conditions to be confirmed along with the supporting documents. 06 Jan 2019
2.NAThe correction have been made as per the instruction received 27 Jan 2019
3.NA- As observed earlier also regarding accreditation of EIA consultant, please inform the present status duly endorsed by NABET. - Project site is reported to be at 0.65 km from the Bird Sanctuary. As such, wildlife clearance is very much relevant and there is a need for clarification from the regulatory authorities/SPCB to allow such polluting units so close to the Sanctuary. - Present status of ESZ for the Bird Sanctuary. 02 Feb 2019
4.NAThe correction have been made as per the instruction received 28 Feb 2019
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterNA 05 Jul 2019
2.NA

Deferred

17 May 2019
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantRamsingh S Rawat
DesignationDirector
Name of Company (Applicant Name should not be given here)DEVI CHEMSCIENCE PRIVATE LIMITED
AddressPlot No.C-174/1, Chincholi MIDC, Tal.Mohol, Dist. Solapur
Print