1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Installation of 6no. of material ropeway for construction of Chanju III (48 MW) HEP | (b)Name of the Company / Organisation | HIMACHAL PRADESH POWER CORPORATION LIMITED | (c)Registered Address | Himfed Bhawan,Panjari,Below Old MLA Quarters,Bypass Raod,Shimla,,Shimla,Himachal Pradesh-171005 | (d)Legal Status of the Company | State Government | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Narender Pal Jagota | (b)Designation (Owner/ Partner/ CEO) | General Manager | (c)Address | Ravi & Chenab Projects, HPPCL,Sundla, Distt. Chamba,,,Chamba,Manipur-176312 | (d)Pin code | 176312 | (e)E-mail | dgmrcp@gmail.com | (f)STD Code. | 1896(f)Telephone No. | 242042 | (g)Fax No. | 01896242041 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 7(g) Aerial ropeways
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/HP/MIS/62364/2017 | (d)Master Proposal Number(Single Window) | SW/89853/2018 | (e)EAC concerned (for category A Projects only) | INFRA-2 | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Platform No.1: 242/2,5/1,5/4 = 0.3034 ha. Platform | (b)Pincode | 176321 | (c)Bounded Latitudes (North) | | From | | Degree | 3619000 | Minutes | | Second | | From | | Degree | 3621000 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 619500 | Minutes | | Second | | From | | Degree | 624000 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 52 D/6 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 2244 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 0.1 | (j)Seismic Zone | 5 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Himachal Pradesh | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Himachal Pradesh | Chamba | Chaurah(T) | | |
|
6. | Details of Terms of Reference (ToR): | (a)Whether TOR is mandatory for submitting application | Yes | (b)MoEF&CC / SEIAA File Number | 10-25/2017-IA-III | (c)Date of Apply of TOR | 10 Apr 2017 | (d)Date of Issue of TOR / Standard ToR | 13 Jun 2017 | (e)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 26 Oct 2018 | Distance of Public Hearing Venue from the Proposed Project : | 1 |
| Chhinj Mela Ground, Chanju, near village Jakhla | State : | Himachal Pradesh | District : | Chamba | Tehsil : | Chaurah(T) | Village : | Jakhla |
| 199 | Issues were related to employment, compensation to farmers and impact on environment due to the proposed project. Some points were not related to the particular project. | Others | Additional District Magistrate | |
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | Bi Cable Jig Back | 5 | 5 number Bi Cable Jig Back ropeway | (2.) | Twin Track Bi Cable Jig Back | 1 | 1 number of Twin Track Bi Cable Jig Back ropeway | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Area | 3.7226 | Hectares | | Others | Area required for ropeway | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | N/A | (iv)Valid Upto | N/A | (v)File No. | NA | (vi)Application No. | NA | (vii)Copy of Consent to operate valid as on date | NA | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 23.40 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 0.40 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0.468 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.0614 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 0 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 0 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | NA | 0 | Tons per Annum | | NA | Road | | 0 | Others | NA | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Dec 2017 To 28 Feb 2018 | (b)Season | Winter | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 6 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM10 | | Micro Gram per Meter Cube | 71.5 | 24.0 | 59.1 | 100 | (2.) | PM2.5 | | Micro Gram per Meter Cube | 39.5 | 13.2 | 32.6 | 60 | (3.) | NOx | | Micro Gram per Meter Cube | 11.9 | 4.1 | 9.9 | 80 | (4.) | SO2 | | Micro Gram per Meter Cube | 4.7 | 1.6 | 3.9 | 80 | |
14.2. No. of Ground Water monitoring locations : 0 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | pH | | | mg/l | | 0 | 0 | 0 | 0 | (2.) | TSS | | | NA | | 0 | 0 | 0 | 0 | (3.) | TDS | | | NA | | 0 | 0 | 0 | 0 | (4.) | Chlorides | | | NA | | 0 | 0 | 0 | 0 | (5.) | Fluoride | | | NA | | 0 | 0 | 0 | 0 | (6.) | Heavy Metals | | none | NA | | 0 | 0 | 0 | 0 | (7.) | Total Hardness | | | NA | | 0 | 0 | 0 | 0 | (8.) | Others | None | | NA | | 0 | 0 | 0 | 0 | |
14.3. No. of Surface Water monitoring locations : 7 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | NA | | 8 | 7.8 | B | (2.) | DO | | mg/l | | 4.2 | 4..2 | C | (3.) | COD | | mg/l | | 1 | 1 | A | (4.) | BOD | | mg/l | | 0.1 | 0.1 | A | |
14.4. No. of Ambient Noise monitoring locations : 7 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 58.4 | 48.2 | 55-65 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 54.5 | 44.1 | 45-55 | |
14.5. No. of Soil Sample Monitored locations : 6 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | N(Nitrogen) | Milligram per Kilogram | | 195 | 110 | (2.) | P(Phosphorus) | Milligram per Kilogram | | 34.2 | 5.5 | (3.) | Electric Conductivity | Millisiemens per Centimetre | | 137.5 | 46.8 | (4.) | K(Potassium) | Milligram per Kilogram | | 128.5 | 27.6 | (5.) | pH | Others | NA | 7.0 | 6.0 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 0.51 To 27.0 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 0.40 To 26.0 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Surface | | 3.5 | 0.1 | Copy of Permission Letter | modeOthers | Water will be taken through spring water | Open Well | | None | 18 Jul 2018 | 3.5 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Domestic & Flushing | 1.8 | 0 | septic tank via soak pit | Others | Soak pit | 0 | 1.8 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 1.8 | (b)Total Discharged Water (Kilolitre per Day) | 1.8 | (c)Total Reused Water (Kilolitre per Day) | 0 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Organic Waste | Municipal Solid Waste | | 1.683 | Tons | 0.1 | Others | The waste will be treated by vermicomposting | Others | The waste will be treated by vermicomposting | (2.) | Used Oil | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 0.0001 | Kilolitre | 0.1 | Road | | Authorized Recyclers | | (3.) | Recyclable waste | Municipal Solid Waste | | 0.765 | Tons | 0.1 | Road | | Authorized Recyclers | | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | SO2 | | Microgram per Meter Cube | 0 | 0 | 0 | 0 | 0 | (2.) | NOx | | Microgram per Meter Cube | 0 | 0 | 0 | 0 | 0 | (3.) | PM10 | | NA | 0 | 0 | 0 | 0 | 0 | (4.) | PM2.5 | | Microgram per Meter Cube | 0 | 0 | 0 | 0 | 0 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | None | 0 | 0 | 0 | PM10 | | 0 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 170 | (b)Source | DG sets | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 6 x 20 KVA, 4 x 15 KVA & 2 x 35 KVA | (e)Stack Height (in m) | 6 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 3.7226 | (b)Private Land (ha.) | 0 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 3.7226 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 0 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 0 | (g)Forest (ha.) | 3.7226 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : None | 0 | Total (ha.) | 3.7226 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Others | Area for terminals and corridor | 3.7226 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Critically Polluted Area | None | 0 | None | (2.) | WLS | None | 0 | None | (3.) | NPA | Jured Reserve Forest | 1.95 | In north direction | (4.) | ESAs | Jured Reserve Forest | 1.95 | In north direction | (5.) | Corridors | None | 0 | None | (6.) | Wildlife Corridors | None | 0 | None | (7.) | ESZs | None | 0 | None | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | Jured Reserve Forest | 1.95 | North Direction | (2.) | Others | River | Chanju Nala | 0.1 | Project is located above the Chanju Nala | (3.) | Defence Installations | | None | 0 | None | (4.) | Archaeological Sites | | None | 0 | None | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | Yes | (a)Forests Clearance Status | Application for Forest Clearance yet to be submitted | (b)Legal Status of Forest Land | Protected | |
|
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 0 | (b)Land yet to be acquired(Ha) | 3.7226 | (c)Status of Land acquisition if not acquired | Forest diversion clearance under process | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | Yes | (i)Details of Schedule-I Species | Panthera pardus, Lophophorus impejanus | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | Yes | (i)Details of Water Bodies in Core Area | Chanju Nala (Project will be developed above the water body) | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Chanju Nala (Project will be developed above the water body) | (ii)Direction of Water Bodies in Buffer Area | North | (iii)Distance of Water Bodies in Buffer Area | 0.1 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 0 | (c)Temporary Employment- During Construction | 50 | (d)Temporary Employment- During Operation | 48 | (e)No. of working days | 300 | (f)Total Manpower | 98 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 0 | (b)Percentage of Total Project Area | 0.00 | (c)No. of Plants to be Planted | 0 | (d)Funds Allocated for Plantation | 0 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Environmental | • The main objective of installation of the proposed ropeway, is to transport construction material for HEP.• Looking at various options of transport system, there are only two options available either road transport or aerial ropeway system, in which ropeway installation is fast, eco-friendly as well as economic | (2.) | Social | After completion of HEP, electricity will accessible in remote area | (3.) | Financial | Revenue generation through tariff to state | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For INFRA-2 |
|
1. | Details of Building Construction: | (a)Maximum Height of the Building (Meters) | 0 | (b)Total No. of Flats to be Build | 0 | (c)No. of Buildings | 0 | (d)Total plot area (sqm) | 0 | (e)Total built up area (sqm) | 0 | |
|
2. | Foreshore Facilities and/or Marine Disposal: | (a)Whether Project Involves Foreshore Activities and/or marine Disposal? | No | |
|
3. | Rain Water Harvesting: | (a)No. of Storage | 0 | (b)Capacity | 0 | (c)No. of Recharge Pits | 0 | (d)Capacity | 0 | |
|
4. | Parking: | (a)Details of 4 Wheeler/ 2 Wheeler Parking | Parking will be made at the loading station for 3- | |
|
5. | Energy Saving Measures: | (a)Source/Mode | Energy efficient motors & VFD shall be used as per | (b)Percentage | 0.1 | (c)Quantity | 1 | |
|
|
7. Type of Industries to be established with Industrial Estate as per their category A/B |
---|
S. No. | Type of Industry | No. of Units | Category A/B |
---|
NIL | |
8. | Length of the alignment | N/A | |
|
9. | Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass | Details Not Applicable | |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | Rev 72/17th December 2018 at S.No.-117 | (ii)Name of the EIA Consultant | M/S PERFACT ENVIRO SOLUTIONS PVT. LTD. | (iii)Address | 5th Floor, NN Mall, Mangalam Place Sector 3, Rohini, New Delhi | (iv)Mobile No. | 9818362330 | (v)Landline No. | 49281360 | (vi)Email Id | info@perfactgroup.in | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | INFRA-2 | (ix)Validity of Accreditation | 27 May 2019 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | As per ToR conditions Stage – I forest clearance is to be submitted. Kindly submit the same. | 23 Jan 2019 | 2. | NA | The correction have been made as per the instruction received | 04 Feb 2019 | 3. | NA | As per ToR conditions Stage – I forest clearance is to be submitted. Kindly submit the same. | 07 Mar 2019 | 4. | NA | The correction have been made as per the instruction received | 23 Apr 2019 | |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Narender Pal Jagota | Designation | General Manager | Name of Company (Applicant Name should not be given here) | HIMACHAL PRADESH POWER CORPORATION LIMITED | Address | Himfed Bhawan,Panjari,Below Old MLA Quarters,Bypass Raod,Shimla |
|