1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | E.I.D. PARRY (INDIA) LIMITED | (b)Name of the Company / Organisation | D. KUMARA SWAMY | (c)Registered Address | NIL | (d)Legal Status of the Company | NIL | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | | (b)Designation (Owner/ Partner/ CEO) | GENERAL MANAGER (ENGINEERING) | (c)Address | NIL | (d)Pin code | 587207 | (e)E-mail | Vvsnmurthy.Kotni@parry.murugappa.com | (f)STD Code. | (f)Telephone No. | | (g)Fax No. | 25341609 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 5(g) Distilleries 5(j) Sugar Industry
| Minor Activity | | (b)Category | B1 | Reason for Applying at Ministry | Other | Other Reason for Applying at Ministry | SEIAA CONSTITUTED | (c)Proposal Number | IA/KA/IND2/89860/2016 | (d)Master Proposal Number(Single Window) | SW/89813/2018 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 2 | (f)Project Type | Expansion |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | 29, 32/1, 32/2, 33/1/B, 33/1A, 36, 27/2, 27/3,28/1 | (b)Pincode | 587207 | (c)Bounded Latitudes (North) | | From | | Degree | 16.27 | Minutes | | Second | | From | | Degree | 16.28 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 75.92 | Minutes | | Second | | From | | Degree | 75.93 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 47 P /15 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 540 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 2.7 | (j)Seismic Zone | 2 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Karnataka | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | J-11011/358/2016-IA-II(I) | (b)Date of Apply of TOR | 03 Dec 2016 | (c)Date of Issue of TOR / Standard ToR | 28 Feb 2017 | (d)Date of Apply of EC | 22 Feb 2015 | (e)Date of Issue of EC | 31 Dec 2015 | (f)Previous TOR Letter | Copy of Previous TOR letter | (g)Previous EC Letter | Copy of Previous EC letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 29 Aug 2018 | Distance of Public Hearing Venue from the Proposed Project : | 0 |
| plant site | State : | Karnataka | District : | Bagalkot | Tehsil : | Bagalkot | Village : | Nagarl & Nainegali |
| 212 | environmental pollution problems due to proposed Distillery | Deputy Commissioner | | |
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Bangalore | (iii)Letter No. | NIL | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Mar 1 2018 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | DISTILLERY | 0 | 60 | 60 | Kilo Litre per Day(KLD) | | Road,Pipe Conveyor | | (2.) | POWER FROM INCINERATION BOILER | 0 | 3 | 3 | Mega Watt(MW) | | Pipe Conveyor | | (3.) | SUGAR | 4750 | 2750 | 7500 | Tons Crushed per Day(TCD) | | Road | | (4.) | CO-GENERATION POWER PLANT | 15 | 19 | 34 | Mega Watt(MW) | | Road,Conveyor Belt | | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | BOILER | 94 TPH | 110 TPH | 94 TPH & 110 TPH | | (2.) | INCINERATION BOILER | -- | 25 TPH | 25 TPH | | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 28 Oct 2016 | (iv)Valid Upto | 30 Jun 2021 | (v)File No. | 10040 | (vi)Application No. | AW-301290 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 351 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 20 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 2.88 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 2 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 230 | (b)Existing quantity of raw material/fuel | 0 | (c)Total quantity of raw material/fuel | 230 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Coal | 160200 | Tons per Annum | | indonesia | Road | | 400 | e-auction | | Copy of Linkage | (2.) | Sugar cane | 1350000 | Tons Crushed per Day | | LOCAL AREAS | Road | | 70 | Others | THROUGH FARMERS | Copy of Linkage | (3.) | Bagasse | 405000 | Tons per Annum | | captive | Conveyor Belt | | 0 | Captive | | Copy of Linkage | (4.) | Molasses raw material for distillery | 82800 | Tons per Annum | | captive and other group units | Road,Pipe Conveyor | | 100 | Captive | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Dec 2016 To 28 Feb 2017 | (b)Season | Winter | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM2.5 | | Micro Gram per Meter Cube | 39.9 | 23.5 | 39.9 | 60 | (2.) | PM10 | | Micro Gram per Meter Cube | 66.4 | 39.3 | 66.4 | 100 | (3.) | NOx | | Micro Gram per Meter Cube | 19.2 | 12.1 | 19.2 | 80 | (4.) | SO2 | | Micro Gram per Meter Cube | 16.9 | 11.9 | 16.9 | 80 | (5.) | Others | CO | Micro Gram per Meter Cube | 610 | 410 | 610 | 2000 | |
14.2. No. of Ground Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | TDS | | | mg/l | | 2147 | 806 | 500 | 2000 | (2.) | Chlorides | | | mg/l | | 1210 | 415 | 250 | 1000 | (3.) | Fluoride | | | mg/l | | 1.1 | 0.5 | 1 | 1.5 | (4.) | Heavy Metals | | lead | mg/l | | 0.008 | 0.005 | 0.05 | 0.05 | (5.) | Total Hardness | | | mg/l | | 950 | 515 | 300 | 600 | (6.) | Others | alkalinity | | mg/l | | 175 | 135 | 200 | 600 | (7.) | TSS | | | Others | NTU | 2 | 1.1 | 5 | 10 | (8.) | pH | | | NA | | 7.8 | 7.2 | 6.5 | 8.5 | |
14.3. No. of Surface Water monitoring locations : 2 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | COD | | mg/l | | 10 | 8 | C | (2.) | DO | | mg/l | | 6.2 | 6.1 | C | (3.) | BOD | | mg/l | | 5 | 4 | C | (4.) | Others | chlorides | mg/l | | 142 | 136 | C | (5.) | pH | | NA | | 8.4 | 8.2 | C | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 54 | 48 | 55 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 46 | 41 | 45 | |
14.5. No. of Soil Sample Monitored locations : 6 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | P(Phosphorus) | Kilogram per hectare | | 35 | 28 | (2.) | K(Potassium) | Kilogram per hectare | | 75 | 48 | (3.) | pH | Others | pH | 7.6 | 7.3 | (4.) | Electric Conductivity | Others | Micro siemens / cm | 165 | 135 | (5.) | N(Nitrogen) | Kilogram per hectare | | 275 | 230 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 0.41 To 14.55 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 0.36 To 11.3 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Surface | | 1328 | 2.7 | Copy of Permission Letter | Pipeline | | Jack Well | | 117 / kbn / 2007 | 24 Mar 2008 | 1500 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | CO-GEN POWER PLANT | 143 | 150 | NEUTRALIZATION | Reuse within the Plant & Recycling | | 143 | | (2.) | DISTILLERY UNIT | 480 | 500 | CONCENTRATION FOLLOWED BY INCINERATION | Reuse within the Plant & Recycling | | 480 | 0 | (3.) | SUGAR PLANT | 740 | 1600 | ETP | Reuse within the Plant & Recycling,Green Belt Renewal Plant | | 740 | | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 1363 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 1363 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | FILTER CAKE | Industrial Waste | | 60000 | Tons | 10 | Road | | Others | GIVEN TO FARMERS TO USE AS MANURE | (2.) | ETP SLUDGE | Industrial Waste | | 60 | Tons | 0 | Road | | Others | USED AS MANURE FOR GREENBELT DEVELOPMENT | (3.) | ASH (BAGASSE AS RAW MATERIAL) | Industrial Waste | | 9000 | Tons | 10 | Road | | Others | GIVEN TO FARMERS TO USE AS MANURE | (4.) | MOLASSES | Industrial Waste | | 67500 | Tons | 0 | Pipe Conveyor | | Others | USED AS RAW MATERIAL IN DISTILLERY | (5.) | ASH (COAL AS RAW MATERIAL) | Industrial Waste | | 14240 | Tons | 30 | Road | | Others | GIVEN TO BRICK MANUFACTURERS | (6.) | BAGASSE | Industrial Waste | | 405000 | Tons | 0 | Conveyor Belt | | Others | USED AS RAW MATERIAL FOR CO-GEN POWER PLANT | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 66.4 | 1300 | 2.5 | 68.9 | 100 | (2.) | SO2 | | Microgram per Meter Cube | 16.9 | 1300 | 25.2 | 42.1 | 80 | (3.) | NOx | | Microgram per Meter Cube | 19.2 | 1300 | 14.9 | 34.1 | 80 | (4.) | Others(Specify) | CO | Microgram per Meter Cube | 610 | 500 | 5.5 | 615.5 | 2000 | (5.) | PM2.5 | | Microgram per Meter Cube | 39.9 | 1300 | 1.5 | 41.4 | 60 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | 110 TPH BOILER | COAL | 86 | 3.5 | PM10 | | 5.9 | (2.) | 25 TPH BOILER | CONCENTRATED SPENT WASH | 60 | 1.5 | SO2 | | 25.5 | (3.) | 25 TPH BOILER | CONCENTRATED SPENT WASH | 60 | 1.5 | NOx | | 4.5 | (4.) | 94 TPH BOILER | COAL | 74 | 3.4 | SO2 | | 73.1 | (5.) | 94 TPH BOILER | COAL | 74 | 3.4 | NOx | | 27.5 | (6.) | 110 TPH BOILER | COAL | 86 | 3.5 | NOx | | 29.5 | (7.) | 94 TPH BOILER | COAL | 74 | 3.4 | PM10 | | 5.5 | (8.) | 110 TPH BOILER | COAL | 86 | 3.5 | SO2 | | 114.6 | (9.) | 25 TPH BOILER | CONCENTRATED SPENT WASH | 60 | 1.5 | PM10 | | 0.9 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 10000 | (b)Source | CAPTIVE | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 2 X 1000 | (e)Stack Height (in m) | 15 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 71.74 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 71.74 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 0 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 71.74 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : 0 | 0 | Total (ha.) | 71.74 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Built Up Area | | 33.2 | | (2.) | Green belt | | 24.3 | | (3.) | Others | INTERNAL ROADS, PARKING AREA AND OTHERS | 14.24 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | WLS | NIL | 0 | NIL WITHIN 10 KM RADIUS | (2.) | NPA | NIL | 0 | NIL WITHIN 10 KM RADIUS | (3.) | ESZs | NIL | 0 | NIL WITHIN 10 KM RADIUS | (4.) | Wildlife Corridors | NIL | 0 | NIL WITHIN 10 KM RADIUS | (5.) | Critically Polluted Area | NIL | 0 | NIL WITHIN 10 KM RADIUS | (6.) | ESAs | NIL | 0 | NIL WITHIN 10 KM RADIUS | (7.) | Corridors | NIL | 0 | NIL WITHIN 10 KM RADIUS | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | UNNAMED | 4.5 | FOREST | (2.) | Archaeological Sites | | NIL | 0 | NIL WITHIN 10 KM RADIUS | (3.) | Defence Installations | | NIL | 0 | NIL WITHIN 10 KM RADIUS | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 71.74 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | ACQUIRED | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | KRISHNA RIVER | (ii)Direction of Water Bodies in Buffer Area | North | (iii)Distance of Water Bodies in Buffer Area | 2.7 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 100 | (b)Permanent Employment-During Operation | 200 | (c)Temporary Employment- During Construction | 100 | (d)Temporary Employment- During Operation | 100 | (e)No. of working days | 360 | (f)Total Manpower | 500 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 20.42 | 3.88 | 24.3 | (2.) | Percentage of Total Project Area | 28.2 | 1.8 | 30 | (3.) | No. of Plants | 30000 | 6000 | 36000 | (4.) | Funds Allocated | 0.5 | 0.1 | 0.6 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Financial | provides employment | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 2 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET / EIA / 1619 / RA 026 | (ii)Name of the EIA Consultant | PIONEER ENVIRO LABORATORIES & CONSULTANTS PVT. LTD | (iii)Address | HYDERABAD | (iv)Mobile No. | 9000380040 | (v)Landline No. | 0402331427 | (vi)Email Id | info@pioneerenvirolabs.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 2 | (ix)Validity of Accreditation | 22 Jun 2019 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | Please inform/clarify/provide the following:-
- Establishment of existing sugar plant (4750 TCD) prior to inception of the EIA Notification, 1994/2006 along with supporting documents.
- Increase in fresh water requirement due to the proposed expansion of sugar plant, setting up distillery of 60 KLPD, and the status of clearance for surface water withdrawal.
- How the products mentioned in the CTO are compatible with the present capacity of sugar plant (4750 TCD). | 05 Jan 2019 | 2. | NA | The correction have been made as per the instruction received | 23 Jan 2019 | 3. | NA | The correction have been made as per the instruction received | 23 Jan 2019 | 4. | NA | As requested earlier also, please inform present status of your request dated 24/2/2018 to the State Govt of Karnataka for surface water withdrawal of 1328 cum/day from Krishna river. | 02 Feb 2019 | 5. | NA | The correction have been made as per the instruction received | 14 May 2019 | 6. | NA | Given the substantial quantity of surface water required of 1328 cum/day, please inform some progress on your request dated 24/2/2018. | 18 May 2019 | 7. | NA | The correction have been made as per the instruction received | 02 Oct 2019 | 8. | NA | The project covered under category B. You are requested to submit the proposal at respective SEIAA/SEAC. | 03 Nov 2019 | 9. | NA | The correction have been made as per the instruction received | 18 Nov 2019 | 10. | NA | As per Ministry’s Notification dated 13th June, 2019, proposal comes under category B and requires appraisal at SEIAA/SEAC. Please submit proposal at SEIAA/SEAC. | 05 Dec 2019 | |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | | Designation | GENERAL MANAGER (ENGINEERING) | Name of Company (Applicant Name should not be given here) | D. KUMARA SWAMY | Address | DARE HOUSE, 234, N.S.C. BOSE ROAD, PARRYS CORNER, CHENNAI |
|