1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Batura Open Cast project | (b)Name of the Company / Organisation | SOUTH EASTERN COALFIELDS LIMITED | (c)Registered Address | SOUTH EASTERN COALFIELDS LIMITED, SECL BHAVAN, SEEPAT ROAD BILASPUR (C.G.) PIN 495006,SOUTH EASTERN COALFIELDS LIMITED, SECL BHAVAN, SEEPAT ROAD BILASPUR (C.G.) PIN 495006,Bilaspur,Chhattisgarh-495006 | (d)Legal Status of the Company | Central PSU | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Akshay Shrikant Bapat | (b)Designation (Owner/ Partner/ CEO) | GENERAL MANAGER(ENVIRONMENT) | (c)Address | SOUTH EASTERN COALFIELDS LIMITED, SECL BHAVAN, SEEPAT ROAD BILASPUR (C.G.) PIN 495006,SOUTH EASTERN COALFIELDS LIMITED, SECL BHAVAN, SEEPAT ROAD BILASPUR (C.G.) PIN 495006,,Bilaspur,Chhattisgarh-495006 | (d)Pin code | 495006 | (e)E-mail | gmenvtsecl@gmail.com | (f)STD Code. | 7752(f)Telephone No. | 246324 | (g)Fax No. | 246324 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 1(a) Mining of minerals
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/MP/CMIN/60381/2016 | (d)Master Proposal Number(Single Window) | SW/89805/2018 | (e)EAC concerned (for category A Projects only) | Coal Mining | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | 64E/12 | (b)Pincode | 484114 | (c)Bounded Latitudes (North) | | From | | Degree | 231240 | Minutes | | Second | | From | | Degree | 231410 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 814020 | Minutes | | Second | | From | | Degree | 814320 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 64E/12 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 509.25 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 6 | (j)Seismic Zone | 2 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Madhya Pradesh | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Madhya Pradesh | Shahdol | Jaithari | | (2.) | Madhya Pradesh | Anuppur | Anuppur | | |
|
6. | Details of Terms of Reference (ToR): | (a)MoEF&CC / SEIAA File Number | J-11015/65/2016-IA II (M) | (b)Date of Apply of TOR | 17 Nov 2016 | (c)Date of Issue of TOR / Standard ToR | 21 Mar 2017 | (d)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 24 Jul 2018 | Distance of Public Hearing Venue from the Proposed Project : | 0 |
| Panchyat Bhavan Khanda | State : | Madhya Pradesh | District : | Anuppur | Tehsil : | Anuppur | Village : | Khanda |
| 125 | Employment Land compensation R and R issues Air and Water pollution | District Collector | | (2.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 29 Oct 2018 | Distance of Public Hearing Venue from the Proposed Project : | 0 |
| Gram Panchyat Rampur | State : | Madhya Pradesh | District : | Shahdol | Tehsil : | Jaithari | Village : | Rampur Beliea |
| 81 | Employment Land compensation R and R issues Air and Water pollution | District Collector | | |
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | Surface Minor | Mining Equipment | | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Coal Mining | 3 | Others | MTPA | Road,Rail | | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | N/A | (iv)Valid Upto | N/A | (v)File No. | NA | (vi)Application No. | NA | (vii)Copy of Consent to operate valid as on date | NA | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 203.82 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 42 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0.30 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 8.5 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 2491 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 2491 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Power | 2491 | Others | kVA | Sharda Substation | Arial Ropeway | | 6 | Others | internal | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 19 Sep 2015 To 31 Dec 2015 | (b)Season | Post-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 6 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM2.5 | | Micro Gram per Meter Cube | 68 | 11 | 59 | 60 | (2.) | SO2 | | Micro Gram per Meter Cube | 21 | 5 | 19.8 | 80 | (3.) | PM10 | | Micro Gram per Meter Cube | 111 | 31 | 100 | 100 | (4.) | NOx | | Micro Gram per Meter Cube | 35.7 | 5 | 33.5 | 80 | |
14.2. No. of Ground Water monitoring locations : 6 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | pH | | | NA | | 7.4 | 6.7 | 8.5 | 8.5 | (2.) | TDS | | | mg/l | | 1170 | 226 | 500 | 2000 | (3.) | Chlorides | | | mg/l | | 377 | 31 | 250 | 1000 | (4.) | Fluoride | | | mg/l | | 0.5 | 0.1 | 1 | 1.5 | (5.) | TSS | | | mg/l | | 0 | 0 | 0 | 0 | (6.) | Heavy Metals | | Lead | mg/l | | 0.01 | 0 | 0.01 | 0.01 | (7.) | Total Hardness | | | mg/l | | 360 | 186 | 200 | 600 | |
14.3. No. of Surface Water monitoring locations : 12 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | BOD | | mg/l | | 7.05 | 2.1 | C | (2.) | DO | | mg/l | | 7.74 | 5.8 | C | (3.) | pH | | NA | | 8 | 6.9 | C | (4.) | COD | | mg/l | | 0 | 0 | C | |
14.4. No. of Ambient Noise monitoring locations : 6 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 59.1 | 46.2 | 75 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 50.8 | 45 | 70 | |
14.5. No. of Soil Sample Monitored locations : 3 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | Others | NA | 7.7 | 5.95 | (2.) | Electric Conductivity | Others | microsiemens per centimeter | 32.7 | 7.32 | (3.) | K(Potassium) | Kilogram per hectare | | 76 | 11.9 | (4.) | N(Nitrogen) | Kilogram per hectare | | 27.98 | 22.39 | (5.) | P(Phosphorus) | Kilogram per hectare | | 0 | 0 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 5.05 To 12.45 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 2.78 To 7.25 | (c)Whether Ground Water Intersection will be there ? | Yes | (d)Upload Copy of Central Ground Water Authority Letter | Copy of Central Ground Water Authority Letter | (e)Letter No. | 0 | (f)Date of Issue | 29 Dec 2018 | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | GroundWater | | 135 | 0 | Not Appliacble | Pipeline | | Tube Well | | 0 | 22 Dec 2018 | 3486 | (2.) | Others | Mine water | 360 | 0 | Copy of Permission Letter | Pipeline | | Others | centrifugal pump | 0 | 29 Dec 2018 | 3486 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Mine seepage water | 3359 | 346212 | Settling tanks | Others | Pipeline | 360 | 2999 | (2.) | Workshop | 56 | 56 | Oil & Grease trap | Reuse within the Plant & Recycling | | 56 | 0 | (3.) | Waste water generation from Township | 100 | 120 | Soak Pit | Others | pipeline | 100 | 0 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 3515 | (b)Total Discharged Water (Kilolitre per Day) | 2999 | (c)Total Reused Water (Kilolitre per Day) | 516 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | overburden | Others | Overburden | 36849600 | Tons | 0 | Road | | Others | Back filling | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | PM 10 Stn 3 | Microgram per Meter Cube | 74.38 | 0 | 20.92 | 95.3 | 250 | (2.) | PM2.5 | | Microgram per Meter Cube | 0 | 0 | 0 | 0 | 60 | (3.) | SO2 | | Microgram per Meter Cube | 0 | 0 | 0 | 0 | 80 | (4.) | NOx | | Microgram per Meter Cube | 0 | 0 | 0 | 0 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | NA | NA | 0 | 0 | PM10 | | 0 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 6000 | (b)Source | Sharda Opencast Substation | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 0 | (e)Stack Height (in m) | 0 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 101.440 | (b)Private Land (ha.) | 727.757 | (c)Government Land (ha.) | 138.276 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 967.473 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 703.077 | (b)Waste/Barren Land (ha.) | 116.474 | (c)Grazing/ Community Land (ha.) | 3.030 | (d)Surface Water Bodies (ha.) | 18.772 | (e)Settlements (ha.) | 24.680 | (f)Industrial (ha.) | 0 | (g)Forest (ha.) | 101.440 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : nil | 0 | Total (ha.) | 967.4730000000001 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Quarry Area | | 799.6 | | (2.) | OB Dump Area | | 26.816 | | (3.) | Safety Zone | | 100.946 | | (4.) | Township | | 3 | | (5.) | Built Up Area | | 8.111 | | (6.) | Others | road magazine infra etc | 29 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Critically Polluted Area | NA | 0 | NA | (2.) | NPA | NA | 0 | NA | (3.) | ESAs | NA | 0 | NA | (4.) | ESZs | NA | 0 | NA | (5.) | WLS | NA | 0 | NA | (6.) | Wildlife Corridors | NA | 0 | NA | (7.) | Corridors | NA | 0 | NA | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Archaeological Sites | | NA | 0 | NA | (2.) | Forest | | Rampur Part and Rampur revenue forest | 0 | within core zone of project | (3.) | Defence Installations | | NA | 0 | NA | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 404.535 | (b)Land yet to be acquired(Ha) | 562.938 | (c)Status of Land acquisition if not acquired | in process | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 3 | (b)No. of Households | 825 | (c)No. of PDFs (Project Displaced Families) | 1870 | (d)No. of PAFs (Project Affected Families) | 1870 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 2929 | (f)Status of R&R | Yet To Start | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | Yes | (i)Details of Water Bodies in Core Area | surface water bodies like pond | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | son river | (ii)Direction of Water Bodies in Buffer Area | West | (iii)Distance of Water Bodies in Buffer Area | 8 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 248 | (c)Temporary Employment- During Construction | 0 | (d)Temporary Employment- During Operation | 0 | (e)No. of working days | 7 | (f)Total Manpower | 248 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 57.45 | (b)Percentage of Total Project Area | 5.94 | (c)No. of Plants to be Planted | 143625 | (d)Funds Allocated for Plantation | 500000 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Environmental | Improvement of Social and Physical Infrastructure. Increase in Employment potential. Meet Energy requirement. | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For Coal Mining |
|
1. No. of Mineral(s) to be Mined : 1 |
---|
S. No. | Mineral(s) to be Mined | Major or Minor Mineral |
---|
(1.) | Coal | Major | |
|
2. | Mine Capacity in ROM (Run of Mine) | 33.44 | |
|
|
4. | Mining Plan: | (a)Approval Letter No. | secl/bsp/bd.secy/172bmext/08/241 | (b)Date of Approval | 16 Sep 2008 | (c)Approved Letter | Copy of Approved Letter | (d)Approved By State Mining and Geology Department | SECL Board | (e)Approved Mining Lease Area | 967.473 | (f)Approved Capacity | 2 | |
|
5. | Technical Details: | (a)Total Geological Reserves (Million Ton) | 37.15 | (b)Mineable Reserves (Million Ton) | 33.44 | (c)Extractable Reserves(Million Ton) | 33.44 | (d)Percent(%) of Extraction | 100 | (e)Grade of Coal /Ore /Mineral | G 5 | (f)Stripping Ratio | 1 : 9.18 | (g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) | NA | (h)Average Gradient(Degree) | 1 to 5 | (i)Mining Method | Opencast | (j)Life of Mine (Years) | 20 | |
|
6. | Details of Beneficiations: | (a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area | No | (b)Whether it is proposed to install crusher within the mining lease area | No | |
|
7. | Details of Seams: | (a)Whether details of seam applicable | Yes | (b)No. of seams | 4 | (c)Thickness of seams to be worked on | 4.36 | (d)Maximum Thickness of Seams (metres) | 4.36 | |
|
8. | Details of Mining Lease: | (a)Mining Lease Area (in Hectare) | 967.473 | (b)Whether obtained Letter of Intent (LOI) from the state government ? | Yes | (i)Copy of Letter of Intent | Copy of Letter of Intent | (ii)Date of issue of LOI | 14 Jan 2011 | (iii)Validity of LOI | 50 | (iv)Reference No. of LOI | S O 228 Dt 14012011 | (c)Whether Lease Deed Executed ? | No | (i)Reason thereof | Acquisition under CBA and D Act1957 | (d)Whether Lease Deed Renewed ? | No | (i)Reason thereof | Acquisition under CBA and D Act1957 | |
|
9. | OB (Over Burden) Management: | (a) Details of External Dumps: | (i)No. of OB Dumps | | (ii)Total Area (in Hectare) | | (iii)Height (in meter) | | (iv)Quantity (in Million Cubic meter) | | (v)No. of year back fill up | | (b) Details of Internal Dumps: | (i)No. of Internal Dumps | | (ii)Total Area (in Hectare) | | (iii)Height (in meter) | | (iv)Quantity (in Million Cubic meter) | | |
|
10. | Details of Topsoil Management: | (a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) | 2.36 | (b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) | 2.36 | (c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) | 0 | |
|
11. | Details of Final Mine Void: | (a)Area (in Hectare) | | (b)Depth (in meter) | | (c)Volume (in Million Cubic meter) | | |
|
12. | Details of Quarry: | (a)Final Void of 110.36 (hectare) at a Depth of 60 meter which is Proposed to be Converted into a Water Body. | (b)Total Quarry Area (ha) | 799.600 | |
|
13. | Details of Transportation: | (a)In Pit/Underground to Surface | Tippers or Trucks | (b)Surface to Siding/Loading | Covered Trapauline Trucks for initial five years o | (c)Transportation / Conveyor Details | By covered Trucks | |
|
|
14. Details of Land Usage (Pre-Mining) |
---|
S. No. | LAND USE | Other LAND USE | WITHIN ML AREA (Hectare) | OUTSIDE ML AREA (Hectare) | TOTAL (Hectare) |
---|
(1.) | FOREST LAND | | 76.840 | 24.600 | 101.44 | (2.) | GRAZING LAND | | 3.030 | 0 | 3.03 | (3.) | SETTLEMENTS | | 24.410 | 0.27 | 24.68 | (4.) | AGRICULTURE LAND | | 570.558 | 132.519 | 703.077 | (5.) | WASTE LAND | | 107.920 | 8.554 | 116.474 | (6.) | SURFACE WATER BODIES | | 16.842 | 1.93 | 18.772 | (7.) | OTHERS(Specify) | Others | 0 | 0 | 0 | |
TOTAL | 799.6 | 167.873 | 967.473 | |
|
15. Details of Land Usage (Post-Mining) |
---|
S. No. | LAND USE | Other LAND USE | Plantation (ha) | Water Body (ha) | Public Use (ha) | Undisturbed (ha) | Total |
---|
(1.) | EXCAVATION/QUARRY | | 76.84 | 14.695 | 708.065 | | 799.6 | (2.) | TOP SOIL STORAGE | | 0 | 0 | 0 | | 0 | (3.) | GREEN BELT | | 24.60 | 1.997 | 74.349 | | 100.946 | (4.) | BUILT UP AREA (COLONY/OFFICE) | | 0 | 0 | 11.111 | | 11.111 | (5.) | Other | Nala diversion and Explosive magazine | 0 | 0 | 12.518 | | 12.518 | (6.) | ROADS | | 0 | 1 | 15.480 | | 16.48 | (7.) | EXTERNAL OB DUMPS | | 0 | 1.08 | 25.736 | | 26.816 | (8.) | VIRGIN AREA | | 0 | 0 | 0 | | 0 | (9.) | INTERNAL OB DUMPS | | 0 | 0 | 0 | | 0 | |
TOTAL | 101.44 | 18.772 | 847.259 | 0 | 967.471 | |
16. | Details of Reclamation: | Total Afforestation Plan shall be Implemented Covering of Mining.This will Include: | (a)External OB Dump(in hectare) | 26.816 | (b)Internal Dump(in hectare) | 689.24 | (c)Quarry(in hectare) | 799.60 | (d)Safety Zone(in hectare) | 24.60 | (e)Final Void of 110.36 (hectare) at a Depth of 60 meter which is Proposed to be Converted into a Water Body. | (f)Density of Tree Plantation per ha (in no.) | 2500 | (g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) | 57.45 | (h)Total afforestation plant (in hectare) | 716.056 | |
|
17. | Status of progressive Mining Closure Plan: | Details Not Applicable | |
|
18. Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception: |
---|
S. No. | Financial Year | Sanctioned Capacity as per EC (MTPA) | Sanctioned Capacity as per CTO | Sanctioned Capacity as per approved mining plan | Actual Production | Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA) |
---|
(1.) | 201819 | 0 | 0 | 0 | 0 | 0 | |
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1720/RA0092 | (ii)Name of the EIA Consultant | CENTRAL MINE PLANNING AND DESIGN INSTITUTE LIMITED | (iii)Address | GONDWANA PLACE KANKE ROAD RANCHI JHARKHAND | (iv)Mobile No. | 8987788797 | (v)Landline No. | 6512230055 | (vi)Email Id | gmenv.cmpdi@coalindia.in | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Coal Mining | (ix)Validity of Accreditation | 01 Oct 2020 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | Detail of Form-II is not retrievable/visible online. Kindly resubmit | 31 Dec 2018 | 2. | NA | The correction have been made as per the instruction received | 01 Jan 2019 | 3. | NA | There is no change in the status. Please see for the needful. | 05 Jan 2019 | 4. | NA | The correction have been made as per the instruction received | 07 Jan 2019 | |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | ADS Reply | 09 Dec 2020 | 2. | NA | The EAC, after detailed deliberation, observed that as submitted by PP, the proposal may be considered for production capacity of 2 MTPA. Further EAC desired the following details to be submitted
- Project proponent shall submit a clarification from Ministry’s FC division about requirement of FC for forest land of 26.40 ha in safety zone
- Mine Closure plan should be as per Ministry of Coal latest guidelines of 2019
- Project proponent shall submit substantive plan for tree transplantation
- Project proponent shall provide year wise production and OB removal plan along with details of land reclaimed and restored. The plan shall contain the year-wise details of land disturbed on account of excavation, internal and external dumping, and land reclaimed and restored.
- Drainage map of the area shall be shown in topo sheet and further zero liquid discharge with water balance should be presented.
The proposal was deferred on the above lines. | 14 Sep 2020 | 3. | ADS Reply Letter | ADS reply for Batura OC mine as desired by the EAC, for consideration in ensuing EAC meeting. | 15 Jul 2020 | 4. | NA | Deferred | 06 Feb 2020 | 5. | ADS Reply Letter | Submission of revised EIA/EMP in respect of Batura Opencast Project (2.00 MTPA Normative and 3.00 MTPA Peak),sought in the 49th EAC meeting held on 22.10.2019 of M/s South Eastern Coalfields Limited at district Anuppur and Shahdol (Madhya Pradesh) | 16 Dec 2019 | 6. | NA | ok | 11 Nov 2019 | 7. | ADS Reply Letter | Reply to ADS for Batura OCP (2.00 MTPA) | 16 Sep 2019 | 8. | NA | NA | 08 Feb 2019 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Akshay Shrikant Bapat | Designation | GENERAL MANAGER(ENVIRONMENT) | Name of Company (Applicant Name should not be given here) | SOUTH EASTERN COALFIELDS LIMITED | Address | SOUTH EASTERN COALFIELDS LIMITED, SECL BHAVAN, SEEPAT ROAD BILASPUR (C.G.) PIN 495006 |
|