Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Gangamai Industries And Constructions Ltd.
(b)Name of the Company / Organisation Mr. A. L. More
(c)Registered Address 2nd floor , Tapadia Terraces, Adalat Road, Aurangabad - 431001,2nd floor , Tapadia Terraces, Adalat Road, Aurangabad - 431001,Ahmednagar,Maharashtra-431001
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Mr. Vishnu S Khedekar
(b)Designation (Owner/ Partner/ CEO) Vise President
(c)Address NIL
(d)Pin code 431001
(e)E-mail gangamaisugar_ind@rediffmail.com
(f)STD Code. 240(f)Telephone No. 2333933
(g)Fax No. 2333927
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(g) Distilleries
Minor Activity
(b)Category A
(c)Proposal Number IA/MH/IND2/55812/2014
(d)Master Proposal Number(Single Window) SW/89779/2018
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 6, 222/3, 223, 224, 228/1, 228/2, 228/3, 233, 234
(b)Pincode 414502
(c)Bounded Latitudes (North)
From
Degree 192238.22
Minutes
Second
From
Degree 192255.27
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 751648.82
Minutes
Second
From
Degree 751709.86
Minutes
Second
(e)Survey of India Topo Sheet No. 47M3, 47 M7
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 450
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 5
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Maharashtra
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)MaharashtraAhmednagarShevgaon
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-11011/14/2015/IA II (I)
(c)Date of Issue of TOR 30 Apr 2015
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 09 Jun 2016
(c)Date of Issue of EC 07 Jan 2020
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :10 Sep 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :17 Oct 2018
Distance of Public Hearing Venue from the Proposed Project :0
At the Factory site - Gangamai Industries And Constructions Ltd., (GIACL), Najik Babulgaon, Post- Rakshi, Tal.: Shevgaon, Dist.: Ahmednagar, Maharashtra State.
State :Maharashtra
District :Ahmednagar
Tehsil :Shevgaon
Village :Najik babhulgaon
178There was no any major issues raised during Public hearing. Few issues raised they are as ā€“ - provision of employment to local people - provision of health care facilities - supply of boiler ash iDistrict Magistrate
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Nagpur
(iii)Letter No. EC-909/RON/2018-NGP/4701
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Dec 12 2018 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Rectified Spirit6090150Kilo Litre per Day(KLD)Road
(2.)Compost (from spentwash treatment)20935020935Tons per Annum(TPA)Road
(3.)Spentwash Dry powder (99% solids)03300033000Tons per Annum(TPA)Road
(4.)Extra Neutral Alcohol6090150Kilo Litre per Day(KLD)Road
(5.)Ethanol6090150Kilo Litre per Day(KLD)Road
(6.)Spentwash Dry powder (95 % solids)02409024090Tons per Annum(TPA)Road
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Daitillery60 KLPD90 KLPD150 KLPD
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 18 May 2018
(iv)Valid Upto 31 Aug 2018
(v)File No. Format - 1.0/BO/CAC-CELL/UAN NO 0000034874/O/CAC-1
(vi)Application No. MPCB-CONSENT-0000034874p
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 19.18
(b) Funds Allocated for Environment Management (Capital) (in Crores) 7.70
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.5
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.53
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 10800
(b)Existing quantity of raw material/fuel 7200
(c)Total quantity of raw material/fuel 18000
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Molasses118800Tons per AnnumOwn Sugar FactoryPipe Conveyor0.5 CaptiveCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2018 To 31 May 2018
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)SO2Micro Gram per Meter Cube30.209.327.3580
(2.)PM2.5Micro Gram per Meter Cube26.2013.8022.1360
(3.)PM10Micro Gram per Meter Cube68.255.7064.6100
(4.)NOxMicro Gram per Meter Cube39.9014.3035.7580
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.737.286.58.5
(2.)TSSmg/l50.8010.23100100
(3.)Chloridesmg/l139.5458.12250250
(4.)TDSmg/l1020.96359.51500500
(5.)Fluoridemg/l0.250.0511
(6.)Heavy MetalsIron as Femg/l0.30.060.300.30
(7.)Total Hardnessmg/l337.57185.59200200
    14.3.     No. of Surface Water monitoring locations : 3
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)CODmg/l28.6420.39E
(2.)DOmg/l2.82.4E
(3.)pHNA7.547.47E
(4.)BODmg/l11.398.87E
    14.4.     No. of Ambient Noise monitoring locations : 7
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))483770
(2.)Leq(Day)A-weighted decibels(dB(A))68.949.875
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Milligram per Kilogram953.56144.40
(2.)P(Phosphorus)Milligram per Kilogram145.6424.12
(3.)Electric ConductivityMillisiemens per Centimetre2.961.19
(4.)pHOthersNA7.617.46
(5.)K(Potassium)Milligram per Kilogram412.26158.92
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 19.10 To 2.15
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.4 To 19.70
(c)Whether Ground Water Intersection will be there ? NA
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface27115Copy of Permission LetterPipelineJack WellOw. No./JID/N.I.Agreement/664308 Dec 2014285
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic Effluent825STPGreen Belt Renewal Plant8
(2.)Spentwash11821200Biomethanation followed by Conc. in MEE & Powder in ATFDOthersSpentwash powder is used as mannure11820
(3.)Industrial other effluent375.251000CPU comprises of Primary-secondary and tertiary treatmentReuse within the Plant & Recycling375.25
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 1565.25
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 1565.25
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Yeast SludgeIndustrial Waste13200Tons5RoadOthersused as mannure
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube22.131.110.0003922.1303960
(2.)SO2Microgram per Meter Cube27.351.110.000227.350280
(3.)PM10Microgram per Meter Cube64.61.110.001664.6016100
(4.)NOxMicrogram per Meter Cube35.751.110.000135.750180
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)BoilerBagasse764PM1064.60
(2.)BoilerBiogas451.2SO263
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 4000
(b)Source Own Co-gen plant
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 900 KVA
(e)Stack Height (in m) 5.5
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 33.06
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 33.06
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 18388
(b)Waste/Barren Land (ha.) 840
(c)Grazing/ Community Land (ha.) 130
(d)Surface Water Bodies (ha.) 3023
(e)Settlements (ha.) 1316.9
(f)Industrial (ha.) 33.06
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Fallow land 7684
    Total (ha.) 31414.960000000003
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Built Up Area17.95Distillery, Sugar factory & Co-gen plant
(2.)Green belt10.17
Total (ha.) 28.12
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)ESZsNil0There is no presence of any CPA, WLS, NPA, ESAs, ESZs, Corridors & Wildlife corridors in 10 Km radious of project
(2.)CorridorsNil0There is no presence of any CPA, WLS, NPA, ESAs, ESZs, Corridors & Wildlife corridors in 10 Km radious of project
(3.)Wildlife CorridorsNil0There is no presence of any CPA, WLS, NPA, ESAs, ESZs, Corridors & Wildlife corridors in 10 Km radious of project
(4.)Critically Polluted AreaNil0There is no presence of any CPA, WLS, NPA, ESAs, ESZs, Corridors & Wildlife corridors in 10 Km radious of project
(5.)WLSNil0There is no presence of any CPA, WLS, NPA, ESAs, ESZs, Corridors & Wildlife corridors in 10 Km radious of project
(6.)NPANil0There is no presence of any CPA, WLS, NPA, ESAs, ESZs, Corridors & Wildlife corridors in 10 Km radious of project
(7.)ESAsNil0There is no presence of any CPA, WLS, NPA, ESAs, ESZs, Corridors & Wildlife corridors in 10 Km radious of project
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Defence InstallationsNil0There is no presence of defense installation in 10 Km radius of project
(2.)Archaeological SitesMahadev Mandir at Ghotan2.5Not notified by Archaeological department
(3.)ForestNil0There is no presence of defense installation in 10 Km radius of project
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Indian Blackbuck (Antilope cervicapra)
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 10
(b)Permanent Employment-During Operation 30
(c)Temporary Employment- During Construction 15
(d)Temporary Employment- During Operation 20
(e)No. of working days 330
(f)Total Manpower 75
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt10.17010.17
(2.)Percentage of Total Project Area38038
(3.)No. of Plants15658015658
(4.)Funds Allocated50050
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialEmployment Generation, Improvement in physical and social infrastructure, .Upliftment of local population,
(2.)FinancialThe alcohol generated from project would be used for blending it with petrol so as to save foreign currency
(3.)EnvironmentalThe community that resides in the nearby areas will be benefited directly or indirectly by this project.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1518/SA 063
(ii)Name of the EIA Consultant Equinox Environmets (I) Pvt. Ltd., Kolhapur
(iii)Address F-11, Namdev Nest, 1160 ā€˜Eā€™ ward, Opp. Kamala College, Sykes Extension, Kolhapur
(iv)Mobile No. 9657865122
(v)Landline No. 0231253123
(vi)Email Id projects@equinoxenvi.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 21 Oct 2018
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAThere is no Form-2 and/or any other details visible on the portal. 05 Jan 2019
2.NAThe correction have been made as per the instruction received 08 Jan 2019
3.NAPlease inform/provide/clarify the following:- - Accreditation of EIA consultant is valid only up to 21/10/2018, and as such, the EIA/EMP report is not acceptable. - Copy of the EC dated 18/10/2017 to be uploaded against column 6(d) of Form-2. - Firm commitment of the regulatory authority to supply surface water of 271 cum/day. - 16 Jan 2019
4.NAThe correction have been made as per the instruction received 25 Jan 2019
5.NAEarlier EC dated 18/10/2017 stipulates one of the condition to obtain wildlife clearance. In this regard, please submit authentic documents to confirm that the project site is outside the notified ESZ for the Jayakwadi Bird Sanctuary. Also, clarification for no more requirement of wildlife clearance from the concerned regulatory authority. Present status for accreditation of the EIA consultant needs to be confirmed by NABET. 02 Feb 2019
6.NAThe correction have been made as per the instruction received 06 Feb 2019
7.NA- As requested earlier also, please clarify for no requirement of wildlife clearance along with supporting documents. - Status of earlier proposal submitted on 9/6/2016 for wildlife clearance from the Standing Committee of NBWL. - Present status of NABET accreditation of the EIA consultant. 09 Feb 2019
8.NAThe correction have been made as per the instruction received 05 Mar 2019
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterAmendment in ToR's through revised Form-1 for regularizing total project land area from 27.06 Ha to 33.7 Ha as per clarification presented. 20 Sep 2019
2.NA

20 Aug 2019
3. ADS Reply LetterR.O Certified report on compliance of EC conditions granted to 5500 TCD sugar factory and 32 MW Co-gen plant 21 Jun 2019
4.NA

Deferred

17 May 2019
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantMr. Vishnu S Khedekar
DesignationVise President
Name of Company (Applicant Name should not be given here)Mr. A. L. More
Address2nd floor , Tapadia Terraces, Adalat Road, Aurangabad - 431001
Print