Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Construction of new link National Highway 133B (Design Chainage km.0.000) starts at proposed Sahibganj Bypass and meet at Ch.200.870 of NH-80 (new name NH-33) (Design Chainage 1.800 of NH 133B) and en
(b)Name of the Company / Organisation National Highways Authority of India
(c)Registered Address G-5 & 6, Sector-10, Dwarka, New DElhi-110075,G-5 & 6, Sector-10, Dwarka, New DElhi-110075,South West,Delhi-110075
(d)Legal Status of the Company Central Government
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Dr Biswajit Mukhopadhyay
(b)Designation (Owner/ Partner/ CEO) General Manager
(c)Address G-5 & 6, Sector-10, Dwarka, New DElhi-110075,G-5 & 6, Sector-10, Dwarka, New DElhi-110075,,New Delhi,Delhi-110075
(d)Pin code 110075
(e)E-mail biswajit@nhai.org
(f)STD Code. 11(f)Telephone No. 25074200
(g)Fax No. 25093543
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity7(f) Highways
Minor Activity2(b) Mineral beneficiation
(b)Category A
(c)Proposal Number IA/BR/NCP/89734/2018
(d)Master Proposal Number(Single Window) SW/89729/2018
(e)EAC concerned (for category A Projects only) INFRA-1
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Bihar & Jharkhand
(b)Pincode 816109
(c)Bounded Latitudes (North)
From
Degree 25.237224
Minutes
Second
From
Degree 25.351638
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 87.597527
Minutes
Second
From
Degree 87.655865
Minutes
Second
(e)Survey of India Topo Sheet No. 72 O/8, 72 O/12
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 54
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0
(j)Seismic Zone 4
5.
(a)Number of States in which Project will be Executed 2
(c)Main State of the project Bihar
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR):
(a)Whether TOR is mandatory for submitting application Yes
(b)MoEF&CC / SEIAA File Number 10-62/2018-IA.III
(c)Date of Apply of TOR 24 Aug 2018
(d)Date of Issue of TOR / Standard ToR 08 Oct 2018
(e)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :07 Oct 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :10 Nov 2018
Distance of Public Hearing Venue from the Proposed Project :1
Manihari
State :Bihar
District :Katihar
Tehsil :Manihari
Village :Manihari
60Asked for the information regarding present land value and amount to be given for resettlement and rehabilitation. Asked for the information regarding steps will be taken by government for the controOthersAdditional Collector
(2.)
Date of Advertisement :13 Oct 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :20 Nov 2018
Distance of Public Hearing Venue from the Proposed Project :0
Ambadiha
State :Jharkhand
District :Sahibganj
Tehsil :Mandro
Village :Ambadiha
74The Construction of bridge is good work. In the construction of 4 lane road there are 5 grave yards, 3 mosques are going to be affected. The alignment can be change to so that they will not get affectOthersAdditional Collector
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Highway Project including Bridge15.885 km
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Water440617OthersKLRoad
(2.)Borrow Earth1682300Otherscubic meterRoad
(3.)Granular material/Moorum638200OthersCubic MeterRoad
(4.)Aggregate1113800OthersCubic meterRoad
(5.)Stone86920Otherscubic meterRoad
(6.)Coarse Sand497350Otherscubic meterRoad
(7.)Cement272730Otherscubic meterRoad
(8.)Bitumen16870OthersMt.Road
(9.)Strands21520OthersMt.Road
(10.)Emulsion470OthersMt.Road
(11.)Structural Steel8730OthersMt.Road
(12.)HYSD Steel61930OthersMetric TonnesRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 2598
(b) Funds Allocated for Environment Management (Capital) (in Crores) 24.599
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 2
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 12.2995
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? Yes
d)Inter-State boundaries and international boundaries Yes
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 800000
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 800000
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Granular material/Moorum638200OtherscumSahibganj and KatiharRoad20 Open MarketCopy of Linkage
(2.)Coarse Sand497350OtherscumSahibganj and KatiharRoad20 Open MarketCopy of Linkage
(3.)Cement272730OtherscumSahibganj and KatiharRoad50 Open MarketCopy of Linkage
(4.)Strands21520OthersMt.JamshedpurRoad,Rail500 Open MarketCopy of Linkage
(5.)Aggregate1113800OtherscumSahibganj and KatiharRoad20 Open MarketCopy of Linkage
(6.)Borrow Earth1682300OtherscumSahibganj and katiharRoad10 Open MarketCopy of Linkage
(7.)Water440617OthersKLRiver GangaRoad0 Open MarketCopy of Linkage
(8.)Stone86920OtherscumSahibganj and KatiharRoad20 Open MarketCopy of Linkage
(9.)Emulsion470OthersMt.Sahibganj and KatiharRoad,Rail50 Open MarketCopy of Linkage
(10.)Bitumen16870OthersMtKolkataRoad,Rail500 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Apr 2017 To 17 Jun 2017
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 3
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube70.338.968.0100
(2.)SO2Micro Gram per Meter Cube6.84.26.780
(3.)OthersCOMicro Gram per Meter Cube1700100016004000
(4.)PM2.5Micro Gram per Meter Cube41.520.739.560
(5.)NOxMicro Gram per Meter Cube26.4811.425.180
    14.2.     No. of Ground Water monitoring locations : 04
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.897.326.58.5
(2.)TSSmg/l0000
(3.)TDSmg/l8854285002000
(4.)Heavy MetalsIronmg/l0.120.080.30.3
(5.)Chloridesmg/l190.11002501000
(6.)Total Hardnessmg/l460200200600
(7.)Fluoridemg/l1.120.511.5
    14.3.     No. of Surface Water monitoring locations : 03
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.987.93C
(2.)CODmg/l1412C
(3.)OthersColourOthersHazen0806C
(4.)BODmg/l0403C
(5.)DOmg/l6.15.2C
    14.4.     No. of Ambient Noise monitoring locations : 04
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))64.147.565
(2.)Leq(Night)A-weighted decibels(dB(A))51.437.155
    14.5.     No. of Soil Sample Monitored locations : 03
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Milligram per Kilogram289246
(2.)Electric ConductivityMillisiemens per Centimetre10688
(3.)pHOthersNA8.067.96
(4.)P(Phosphorus)Milligram per Kilogram8468
(5.)K(Potassium)Milligram per Kilogram156139
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 12 To 4.6
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 2.85 To 7.93
(c)Whether Ground Water Intersection will be there ? NA
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface11 Not Appliacble PipelineOthersRiverNA10 Nov 20181
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic12Bio-toiletsReuse within the Plant & Recycling10
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 1
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 1
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Surplus EarthConstruction & Demolition Waste646174Tons5RoadOthersLow lying areas
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube29.2139.7339.7360
(2.)NOxMicrogram per Meter Cube5.2817.187.1880
(3.)Others(Specify)COMicrogram per Meter Cube13201157015704000
(4.)PM10Microgram per Meter Cube54.6174.2974.29100
(5.)SO2Microgram per Meter Cube16.75122.7922.7980
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG SetDiesel150.25PM1030
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 500
(b)Source DG Sets
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 500 KvA
(e)Stack Height (in m) 10
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 59.34
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 59.34
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 34
(b)Waste/Barren Land (ha.) 5.34
(c)Grazing/ Community Land (ha.) 20
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : FALLOW 0
    Total (ha.) 59.34
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Green belt4.8195NA
Total (ha.) 4.8195
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNone0None
(2.)WLSNone0None
(3.)NPANone0None
(4.)CorridorsNone0None
(5.)Wildlife CorridorsNone0None
(6.)ESZsNone0None
(7.)ESAsVikramshila Gangetic Dolphin Wild Life Sanctuary40Presence of Gangetic Dolphins
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNone0None
(2.)OthersGangetic DolphinsGangetic Dolphins0Adequate mitigation and management measures suggested in EMP
(3.)Archaeological SitesNone0None
(4.)Defence InstallationsNone0None
23.3.
(a)Whether Noc / Permission from the competent authority is required? Yes
(i)Uploaded Noc / Permission from the competent authority Copy of Noc / Permission from the competent authority
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 36
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 58.212
(b)Land yet to be acquired(Ha) 1.188
(c)Status of Land acquisition if not acquired Almost complete
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 15
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 101
(e)Funds Allocated for R&R(in INR) (in Lacs) 4922
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Gangetic Dolphin
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 147.7 Lakhs
(iii)Period of Implementation 6 Years
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? Yes
(i)Uploaded copy of approval Copy of approval
(ii)Letter No. 1998
(iii)Date of issue 30 Nov 2018
(iv)Recommendation Preparation of Gangetic Dolphin Conservation plan
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area River Ganga
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? Yes
(i)Uploaded copy of permission Copy of permission
(ii)Letter No. TE-14015/02/2018/NMCG
(iii)Date of issue 29 Nov 2018
(iv)Recommendation Competent Authority at the National Mission for C
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area River Ganga
(ii)Direction of Water Bodies in Buffer Area North West
(iii)Distance of Water Bodies in Buffer Area 0
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 300
(b)Permanent Employment-During Operation 25
(c)Temporary Employment- During Construction 2650
(d)Temporary Employment- During Operation 25
(e)No. of working days 2190
(f)Total Manpower 3000
32.
Green Belt in Ha:
(a)Total Area of Green Belt 5
(b)Percentage of Total Project Area 8.43
(c)No. of Plants to be Planted 15303
(d)Funds Allocated for Plantation 13662000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialThere will be improvements in economic growth of the surrounding areas due to establishment of more shops, industries, institutions, MNCs and other organizations. Improvement in economic and social welfare of nearby people. Increase in access to markets, jobs, education and health services.
(2.)EnvironmentalThree rows of avenue plantations are proposed on both side of the road at most of the sections as per IRC SP 21, 2009. Avenue plants proposed in the region are Albizzia lebeck, Albizzia proeera, Butea monosperma, Bauhinia variegata, Cassia fistula, Cassia siamea, Cedrela toona, Chikrassia tabularis, Calistemon lanceolatus, Dalbergia sissoo, Emblica officinalis, Ficus sp, Gravellea robusta, Hardwickia pinnata, Lagerstroemia, thorii, Lagerstroemea floriginea, Morusalba, Mangifera indica, Pterosp
(3.)FinancialThe proposed project stretch across river Ganga will reduce travel distance from approx. 180 km to approx. 15 km and it will enhance the traffic and goods transport to northern and north-eastern region. It will also provide connectivity between Jharkhand State and Bihar State. Project road will reduce transportation cost for both freight and passengers and increase in road safety.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For INFRA-1
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 3
(b)Total No. of Flats to be Build 1
(c)No. of Buildings 1
(d)Total plot area (sqm) 953100
(e)Total built up area (sqm) 714825
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 1
(b)Capacity 0
(c)No. of Recharge Pits 40
(d)Capacity 736182
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking 4 Bus bays/ bus shelters
5.
Energy Saving Measures:
(a)Source/Mode LED Lights on Bridges and Approaches
(b)Percentage 40
(c)Quantity 750
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area No significant impact on water bodies & drainage p
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment 15.885
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
(a)Total No. of Bridges 12
(b)Total No. of ROB 2
(c)Total No. of Interchanges 0
(d)Total No. of Flyovers 0
(e)Total No. of Vehicle Underpass 3
(f)Total No. of Pedestrian Underpass 1
(g)Details of other utilities rail and road corridors 0
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1518/RA0061
(ii)Name of the EIA Consultant Aarvee Associates Architects Engineers and Consult
(iii)Address 8-2-5, Ravula Residency, Srinagar Colony Main Road, Hyderabad
(iv)Mobile No. 9490623700
(v)Landline No. 0402373763
(vi)Email Id aarvee@aarvee.net
(vii)Category of Accreditation A
(viii)Sector of Accreditation INFRA-1
(ix)Validity of Accreditation 16 Feb 2018
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAForm 2 is not visible. Please upload again. 09 Jan 2019
2.NAThe correction have been made as per the instruction received 10 Jan 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantDr Biswajit Mukhopadhyay
DesignationGeneral Manager
Name of Company (Applicant Name should not be given here)National Highways Authority of India
AddressG-5 & 6, Sector-10, Dwarka, New DElhi-110075