Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Clarus Chem Pvt. Ltd.
(b)Name of the Company / Organisation CLARUS CHEM PVT LTD
(c)Registered Address Sy.No. 173/B1, Obulapuram (V), D. Hirehal (M), Anantapur (D), A.P,,Anantapur,Andhra Pradesh-515865
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Sambi reddy Reddy
(b)Designation (Owner/ Partner/ CEO) ManagingDirector
(c)Address Plot No. 103, 104 105, Haripriya Nagar, Moka Road, Bellary, Karnataka,,D.Hirehal,Anantapur,Andhra Pradesh-515865
(d)Pin code 515865
(e)E-mail claruschem@gmail.com
(f)STD Code. 40(f)Telephone No. 23070602
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
Minor Activity
(b)Category A
(c)Proposal Number IA/AP/IND2/63298/2017
(d)Master Proposal Number(Single Window) SW/89645/2018
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Sy.No. 173/B1
(b)Pincode 515872
(c)Bounded Latitudes (North)
From
Degree 15.055
Minutes
Second
From
Degree 15.100
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 76.843
Minutes
Second
From
Degree 76.960
Minutes
Second
(e)Survey of India Topo Sheet No. 57A/12,16, 57B/13
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 553
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 9.1
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Andhra Pradesh
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)Andhra PradeshAnantapurD.Hirehal
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/144/2017-IA-II(I)
(b)Date of Apply of TOR 20 Mar 2017
(c)Date of Issue of TOR / Standard ToR 31 May 2017
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :17 Apr 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :18 May 2018
Distance of Public Hearing Venue from the Proposed Project :0.01
At the proposed project site, Sy.No. 173/B1, Obulapuram Village, D.Hirehal Mandal, Anantapur District, Andhra Pradesh.
State :Andhra Pradesh
District :Anantapur
Tehsil :D.Hirehal
Village :Obulapuram
50Employment for local villagers, control pollution from industryDistrict Magistrate
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)MEE system20 KLD
(2.)RO system25 KLD
(3.)D.G. Set350 KVA
(4.)Coal fired boiler1 TPH & 2 TPH
(5.)Cooling Towers100 TR & 250 TR
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)1-(2,3 Dichlorophenyl) piperazine Hydrochloride (Aripiparazol Intermediate)6OthersTPMRoad
(2.)1-(4-Methoxy-Phenyl)-4-(4-Nitro-Phenyl)-Piperazine(Itraconazole Intermediate)6OthersTPMRoad
(3.)4-Phenyl butanol (Intermediate)2OthersTPMRoad
(4.)Bis (2-chloroethyl) amine Hydrochloride (Itraconazole Intermediate)6OthersTPMRoad
(5.)Diphenyl (Piperidin-4-yl) Methanol (Fexofenadine intermediate)6OthersTPMRoad
(6.)n-Acetyl Piperzine(Intermediate)2OthersTPMRoad
(7.)5-Cyano Phthalide (Citalopram Intermediate)5OthersTPMRoad
(8.)N-Methyl-1-Napthalenemethylamine Hydrochloride(Terbinafine Hydrochloride)6OthersTPMRoad
(9.)1-Acetyl-4-(Hydroxy Phenyl) Piperazine(Itraconazole Intermediate)6OthersTPMRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 5.2
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.71
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 26
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.15
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? Yes
d)Inter-State boundaries and international boundaries Yes
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 43.92
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 43.92
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)2,3-Dichlorophenylamine43.92Tons per AnnumDomesticRoad12 Open MarketCopy of Linkage
(2.)1-(4-Methoxy phenyl ) Piperazine44.64Tons per AnnumDomesticRoad12 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Oct 2017 To 31 Dec 2017
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube61.446.860.8100
(2.)NOxMicro Gram per Meter Cube23.820.723.880
(3.)OthersCOMili Gram per Meter Cube0.480.280.472
(4.)PM2.5Micro Gram per Meter Cube26.522.526.460
(5.)SO2Micro Gram per Meter Cube15.912.515.980
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Total Hardnessmg/l735405200600
(2.)TDSmg/l161011005002000
(3.)Fluoridemg/l0011.5
(4.)TSSmg/l0000
(5.)Chloridesmg/l365.5254.42501000
(6.)pHOthersNA7.957.228.50
    14.3.     No. of Surface Water monitoring locations : 2
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)BODmg/l22.318.4E
(2.)DOmg/l5.35E
(3.)pHmg/l8.127.85E
(4.)CODmg/l7562E
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))54.852.975
(2.)Leq(Night)A-weighted decibels(dB(A))43.937.270
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pHOthersNA8.057.25
(2.)N(Nitrogen)Milligram per Kilogram1.421.18
(3.)P(Phosphorus)Milligram per Kilogram13.610.6
(4.)Electric ConductivityOthersµ mhos320165
(5.)K(Potassium)Milligram per Kilogram16.8510.55
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.65 To 11.97
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.37 To 15.26
(c)Whether Ground Water Intersection will be there ? Yes
(d)Upload Copy of Central Ground Water Authority Letter Copy of Central Ground Water Authority Letter
(e)Letter No. 1304
(f)Date of Issue 10 Oct 2017
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater620.1Copy of Permission LettermodeOthersWithin the plant siteTube Well130410 Oct 201762
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Washings245ZLD SystemOthersTreatment losses1.780.22
(2.)Boiler Blow down345ZLD SystemOthersTreatment losses2.670.33
(3.)Domestic1.545ZLD SystemOthersTreatment losses1.330.17
(4.)Process1145ZLD SystemOthersTreatment losses8.532.47
(5.)Scrubbing system245ZLD SystemOthersTreatment losses1.40.6
(6.)Cooling towers Blow down545ZLD SystemOthersTreatment losses4.460.54
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 24.5
(b)Total Discharged Water (Kilolitre per Day) 4.33
(c)Total Reused Water (Kilolitre per Day) 20.17
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Solvent Distillation residueHazardous Waste (as per Hazardous and Other Waste Management rules 2016)102.96Tons12RoadOthersSent to Cement industries
(2.)ETP SludgeHazardous Waste (as per Hazardous and Other Waste Management rules 2016)54Tons400RoadTreatment, Storage and Disposal Facility(TSDF)
(3.)Organic wasteHazardous Waste (as per Hazardous and Other Waste Management rules 2016)18Tons12RoadOthersSent to Cement industries
(4.)Spent CarbonHazardous Waste (as per Hazardous and Other Waste Management rules 2016)9Tons12RoadOthersSent to Cement industries
(5.)MEE SaltsHazardous Waste (as per Hazardous and Other Waste Management rules 2016)219.6Tons400RoadTreatment, Storage and Disposal Facility(TSDF)
(6.)Ash from BoilerOthersAsh from boiler1323Tons12RoadOthersSent to Brick Manufacturers
(7.)Used oilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.25Kilolitre12RoadAuthorized Recyclers
(8.)Inorganic wasteHazardous Waste (as per Hazardous and Other Waste Management rules 2016)9Tons400RoadTreatment, Storage and Disposal Facility(TSDF)
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube60.80.51.26662.066100
(2.)SO2Microgram per Meter Cube15.90.52.8218.7280
(3.)NOxMicrogram per Meter Cube23.80.53.9127.7180
(4.)PM2.5Microgram per Meter Cube26.40.50.84427.24460
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)2.0 TPH Coal Fired BoilerCoal300.35PM100.23
(2.)1.0 TPH BoilerCoal300.30PM100.17
(3.)1.0 TPH BoilerCoal300.30NOx0.76
(4.)2.0 TPH BoilerCoal300.35NOx1.58
(5.)1.0 TPH BoilerCoal300.30SO20.33
(6.)2.0 TPH boilerCoal300.35SO20.69
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 500
(b)Source APSPDCL
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) Not applicable
(e)Stack Height (in m) 10
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 2.509
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 2.509
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 17144.4
(b)Waste/Barren Land (ha.) 5809
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 1067.6
(e)Settlements (ha.) 1130.4
(f)Industrial (ha.) 1350.2
(g)Forest (ha.) 4898.4
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : None 0
    Total (ha.) 31400.000000000004
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Green belt0.902
(2.)OthersRoads & Open Area1.222
(3.)Built Up Area0.385
Total (ha.) 2.509
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNot present0NA
(2.)CorridorsNot present0NA
(3.)WLSNot present0NA
(4.)ESZsNot present0NA
(5.)NPANot present0NA
(6.)ESAsNot present0NA
(7.)Wildlife CorridorsNot present0NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNA0NA
(2.)ForestBellary R.F0.10N
(3.)Defence InstallationsNA0NA
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 2.509
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired NA
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Tungabhadra High Level Canal
(ii)Direction of Water Bodies in Buffer Area North East
(iii)Distance of Water Bodies in Buffer Area 9.1
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 40
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 365
(f)Total Manpower 40
32.
Green Belt in Ha:
(a)Total Area of Green Belt 0.902
(b)Percentage of Total Project Area 35.95
(c)No. of Plants to be Planted 1300
(d)Funds Allocated for Plantation 400000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.       Project Benefits
S. No. Type of Project BenefitsDetails of Project Benefits
NIL
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1821/RA 0100
(ii)Name of the EIA Consultant Rightsource Industrial Solutions Pvt. Ltd.
(iii)Address Plot No: 203, H.No:5-36/203, Prashanthi Nagar, IDA, Kukatpally, Hyderabad – 500072
(iv)Mobile No. 9885560011
(v)Landline No. 0402307060
(vi)Email Id eiaemp@rightsource.co.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 25 Feb 2021
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAPlease inform/clarify the following:- - Whether the proposed industrial operations at the identified site are in conformity with permitted land use of the area. Supporting documents in this regard to be submitted. - Actual fresh water requirement (irrespective of the permission obtained from the State Government) and the fuel consumption per day. 05 Jan 2019
2.NAThe correction have been made as per the instruction received 25 Feb 2019
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterRespected Sir, We, Clarus Chem Pvt. Ltd Proposed to establish a Bulk Drug Intermediates manufacturing Unit at Sy No: 173/B1, Obulapuram Village, D.Hirehal Mandal, Anantapur District, Andhra Pradesh. Based on 7th EAC (Industry-2) Meeting Held on 7th May, 2019 and minutes of the meeting, the committee sought for the following Information. The EAC, after deliberations, observed that incremental concentrations for critical air pollutants namely PM10, SO2 & NOx, measured as 2.11 µg/m3 , 2.82 µg/m3& 3.91 µg/m3, were on higher side and desired for confirmation of the same. The Committee also suggested for changing the boiler fuel from coal to bio-briquette or any other bio-fuel and rework on air quality modelling. In continuation to the above ADS, we are here with submitting details for your kind consideration. Hence, we are requesting you to consider our proposal to issue the Environmental Clearance. Thanking You Yours faithfully for Clarus Chem Pvt. Ltd Sambi Reddy Managing Director 27 May 2019
2.NA

Deferred

17 May 2019
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantSambi reddy Reddy
DesignationManagingDirector
Name of Company (Applicant Name should not be given here)CLARUS CHEM PVT LTD
AddressSy.No. 173/B1, Obulapuram (V), D. Hirehal (M), Anantapur (D), A.P
Print