1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Proposed Expansion of Cement Clinker Capacity (1.75 MTPA to 1.88 MTPA) at Village Lumshnong, Tehsil Khliehriat, District East Jaintia Hills, Meghalaya by Star Cement Meghalaya Ltd., | (b)Name of the Company / Organisation | STAR CEMENT MEGHALAYA LIMITED | (c)Registered Address | Village Lumshnong, Tehsil Khliehriat, District East Jaintia Hills, Meghalaya,,East Jaintia Hills,Meghalaya-793210 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Pankaj Kejriwal | (b)Designation (Owner/ Partner/ CEO) | Director | (c)Address | 281, Deepali, Pitampura, New Delhi-110034,,Saraswati Vihar,North West,Delhi-110034 | (d)Pin code | 110034 | (e)E-mail | girisamk@starcement.co.in | (f)STD Code. | 3655(f)Telephone No. | 27033821 | (g)Fax No. | 278217 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 3(b) Cement plants
| Minor Activity | 3(b) Cement plants
| (b)Category | A | (c)Proposal Number | IA/ML/IND/89661/2018 | (d)Master Proposal Number(Single Window) | SW/89659/2018 | (e)EAC concerned (for category A Projects only) | NIL | (f)Project Type | Expansion under para 7(ii) |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Patta No.15 of 2008-2009 | (b)Pincode | 793210 | (c)Bounded Latitudes (North) | | From | | Degree | 25.168528 | Minutes | | Second | | From | | Degree | 25.183164 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 92.385361 | Minutes | | Second | | From | | Degree | 92.405853 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 83 C/8 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 474 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 128.75 | (j)Seismic Zone | 5 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Meghalaya | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR)/EC: | Not Applicable | |
|
4. | Whether the Project Exempted from Public Hearing? | Details Not Applicable | |
|
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Shillong | (iii)Letter No. | Ref.RO-MOEFCC/CEC/12/2018 | (iv)Status of Compliance | Partially Complied | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Dec 10 2018 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Clinker | 1750000 | 130000 | 1880000 | Tons per Annum(TPA) | | Road | | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | Clinker Plant | Production of clinker for cement manufacturing | Production of clinker for cement manufacturing | Production of clinker for cement manufacturing | | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 30 Jan 2018 | (iv)Valid Upto | 31 Jan 2019 | (v)File No. | MPCB/TB-115-2009/2017-2018/84 | (vi)Application No. | MPCB/TB-115-2009/2017-2018/84 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 5 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 0.25 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0.05 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.05 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | Yes | c)Notified Eco-sensitive areas | Yes | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 234800 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 234800 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Limestone | 2410000 | Tons per Annum | | Brishyrnot/Khub | Road,Conveyor Belt | | 2 | Captive | | Copy of Linkage | (2.) | Coal | 283800 | Tons per Annum | | Wapung | Road,Rail | | 26 | Open Market | | Copy of Linkage | (3.) | Mill Scale | 65000 | Tons per Annum | | Guwahati | Road | | 230 | Open Market | | Copy of Linkage | (4.) | Shale | 580000 | Tons per Annum | | 135th KM stone | Road | | 7 | Open Market | | Copy of Linkage | |
|
16. | Baseline Data | Not Applicable | |
|
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 0.77 To 2.86 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 0.57 To 1.40 | (c)Whether Ground Water Intersection will be there ? | NA | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Surface | | 1800 | 0 | Copy of Permission Letter | Pipeline | | Others | Pump house | AID(J)223/2008-09/ | 16 Jun 2009 | 4900 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Domestic waste water | 120 | 400 | STP based on MBBR technology | Others | Green belt & dust suppression | 120 | 0 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 120 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 120 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Used or Spent Oil | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 5.125 | Kilolitre | 568 | Road | | Authorized Recyclers | | (2.) | STP Sludge | Others | STP Sludge | 35.64 | Tons | 0 | Road | | Co-Processing | | (3.) | Municipal waste | Municipal Solid Waste | | 400.95 | Tons | 0 | Road | | Others | utilized internally | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | SO2 | | Microgram per Meter Cube | 6.4 | 0 | 0 | 6.4 | 80 | (2.) | PM2.5 | | Microgram per Meter Cube | 30.1 | 0 | 0 | 30.1 | 60 | (3.) | PM10 | | Microgram per Meter Cube | 71.3 | 0 | 0 | 71.3 | 100 | (4.) | NOx | | Microgram per Meter Cube | 16.8 | 0 | 0 | 16.8 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | RABH | NA | 45 | 3 | Others | PM | 19.7 | (2.) | RABH | NA | 45 | 3 | SO2 | | 91.6 | (3.) | Coal Mill | Coal | 37 | 1.2 | SO2 | | 3.4 | (4.) | Coal Mill | Coal | 37 | 1.2 | NOx | | 2.5 | (5.) | Cooler ESP | NA | 30 | 2.8 | Others | PM | 24.1 | (6.) | Cooler ESP | NA | 30 | 2.8 | SO2 | | BDL | (7.) | Cooler ESP | NA | 30 | 2.8 | NOx | | BDL | (8.) | RABH | NA | 45 | 3 | NOx | | 119.9 | (9.) | Coal Mill | Coal | 37 | 1.2 | Others | PM | 22.6 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 15000 | (b)Source | Meghalaya Power Ltd. | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | 0 | (e)Stack Height (in m) | 0 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 75 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 75 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 0 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 0 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : Plant area | 75 | Total (ha.) | 75 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 0 | No additional land is required for expansion | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Critically Polluted Area | NA | 0 | NA | (2.) | NPA | NA | 0 | NA | (3.) | Wildlife Corridors | NA | 0 | NA | (4.) | ESZs | Narpuh Wildlife Sanctuary | 3.17 | from ESZ boundary | (5.) | Corridors | NA | 0 | NA | (6.) | WLS | Narpuh Wildlife Sanctuary | 3.17 | From ESZ boundary | (7.) | ESAs | NA | 0 | NA | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | Narpuh Reserve Forest | 9.0 | in SE direction | (2.) | Archaeological Sites | | NA | 0 | NA | (3.) | Defence Installations | | NA | 0 | NA | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 75 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | NA | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | Yes | (i)Details of Schedule-I Species | Asian Leopard Cat, Hog Badger, Assam Bamboo Partridge, Hoolock gibbon, Family Hylobatiedae, Serow and Slow Loris | (b)Whether conservation plan for Schedule-I Species has been prepared ? | Yes | (i)Uploaded copy of conservation plan | Copy of conservation plan | (ii)Fund Provision made | 115 Lakh | (iii)Period of Implementation | NA | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | Yes | (i)Uploaded copy of approval | Copy of approval | (ii)Letter No. | MFG.16/50/CMCL/Vol-II/3007 | (iii)Date of issue | 09 Dec 2015 | (iv)Recommendation | NA | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | Yes | (i)Details of Water Bodies in Core Area | Umtyrngai Nallah-adjacent to the plant premises | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | Yes | (i)Uploaded copy of permission | Copy of permission | (ii)Letter No. | AID(J)223/2008-09/ | (iii)Date of issue | 16 Jun 2009 | (iv)Recommendation | NA | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Um-Lunar River- 3.0 Km E, Lubha River- 4.5 Km SE | (ii)Direction of Water Bodies in Buffer Area | South East | (iii)Distance of Water Bodies in Buffer Area | 3.0 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 170 | (c)Temporary Employment- During Construction | 0 | (d)Temporary Employment- During Operation | 0 | (e)No. of working days | 330 | (f)Total Manpower | 170 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 25 | 0 | 25 | (2.) | Percentage of Total Project Area | 33 | 0 | 33 | (3.) | No. of Plants | 44920 | 0 | 44920 | (4.) | Funds Allocated | 95 | 0 | 95 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Environmental | Reduction in energy consumption and better control of fugitive dust. | (2.) | Social | Increased in indirect employment due to additional transportation. | (3.) | Financial | Reduction in overhead expanses will increase revenue per ton and Government will benefit from addition of tax collection. | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 1 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | 117 | (ii)Name of the EIA Consultant | Perfact Enviro Solutions Pvt. Ltd. | (iii)Address | 5th Floor, NN Mall, Mangalam Palace, Sector 3, Rohini, New Delhi-110085 | (iv)Mobile No. | 9818346370 | (v)Landline No. | 0114928137 | (vi)Email Id | info@perfactgroup.in | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 1 | (ix)Validity of Accreditation | 27 May 2019 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | Kindly resubmit the application afresh along with the certified compliance report from Regional office - Shillong and detailed technical documentation inter-alia including proposed process modifications, impact prediction, pollution load assessment etc., | 23 Jan 2019 | |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Pankaj Kejriwal | Designation | Director | Name of Company (Applicant Name should not be given here) | STAR CEMENT MEGHALAYA LIMITED | Address | Village Lumshnong, Tehsil Khliehriat, District East Jaintia Hills, Meghalaya |
|