Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) DTC Industries
(b)Name of the Company / Organisation DTC INDUSTRIES UNIT II
(c)Registered Address Survey No. 384, Village Lunege, Tal Khambhat, Dist Anand,,Anand,Gujarat-388620
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Khagesh Rajnikant Amin
(b)Designation (Owner/ Partner/ CEO) Partner
(c)Address Survey No. 384, Lunej, Khambhat, Anand,,Khambhat,Anand,Gujarat-388620
(d)Pin code 388620
(e)E-mail khagesh33738@gmail.com
(f)STD Code. 79(f)Telephone No. 22147550
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
Minor Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
(b)Category A
(c)Proposal Number IA/GJ/IND2/73817/2018
(d)Master Proposal Number(Single Window) SW/89515/2018
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Survey No. 384,Vill: Lunej
(b)Pincode 388620
(c)Bounded Latitudes (North)
From
Degree 22.362073
Minutes
Second
From
Degree 22.362600
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 72.574958
Minutes
Second
From
Degree 72.575500
Minutes
Second
(e)Survey of India Topo Sheet No. F43G11
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 7
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 10
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)GujaratAnandKhambhat
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/118/2018-IA-II(I)
(b)Date of Apply of TOR 30 Mar 2018
(c)Date of Issue of TOR / Standard ToR 04 May 2018
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :11 Oct 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :15 Nov 2018
Distance of Public Hearing Venue from the Proposed Project :0.01
Land beside DTC Industries, C/O DTC Industries At Survey No.384, Viage: Lunej, Taluka: Khambhat-388620, District: Anand
State :Gujarat
District :Anand
Tehsil :Khambhat
Village :Lunej
168CSR activities, Employment, Water salinity and rain water harvestingOthersResidential Additional Collector and Additional District Magistrate, Anand
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)SS/MS/CI Sulphonator7000 Ltr12 NOS
(2.)Dumping Vessel25000 Ltr7 NOS
(3.)Dumping Vessel30000 Ltr5 NOS
(4.)Alluminium Tank10 MT1 NOS
(5.)Dumping Vessel15000 Ltr7 NOS
(6.)Dumping Vessel20000 Ltr7 NOS
(7.)Filter Press36''4 NOS
(8.)Centrifuge48''3 NOS
(9.)MS/RL/BL Vessel25000 Ltr5 NOS
(10.)HDPE Tank20, 10, 40 MT1 NO, 1 NO, 2 NOS
(11.)MS Tank50, 40, 24 MT4 NOS, 1 NO, 2 NOS
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Para Nitro Toluene Ortho Sulphonic Acid (PNTOSA)240Tons per AnnumRoad
(2.)Yellow TGLL/Direct Orange 39600Tons per AnnumRoad
(3.)Resist Salt (Meta Nitrobenzene Sulphonic Acid)1800Tons per AnnumRoad
(4.)Metanilic Acid (3-Aminobenzenesulfonic Acid)1200Tons per AnnumRoad
(5.)Aniline 2:5 DSA (1-Amino Benzene 2,5 - Disulphonic Acid)300Tons per AnnumRoad
(6.)Sulphanilic Acid (4-Aminobenzenesulfonic Acid)1800Tons per AnnumRoad
(7.)Peri Acid (1-Aminonaphthalene-8-SulfonicAcid)120Tons per AnnumRoad
(8.)6 Acetyl OAPSA (6 Acetyl 2 Amino Phenol 4 Sulfonic Acid)60Tons per AnnumRoad
(9.)Naphtho Sultone (1-Naphthol-8-sulfonic acid sultone)60Tons per AnnumRoad
(10.)Reactive Blue 221600Tons per AnnumRoad
(11.)Ferrous Sulphate Heptahydrate1200Tons per AnnumRoad
(12.)Di-Nitro Stilbene Di Sulphonic Acid (DNSDSA)240Tons per AnnumRoad
(13.)Para Amino Azo Benzene 4 Sulphonic Acid (PAABSA)300Tons per AnnumRoad
(14.)Reactive Blue 220600Tons per AnnumRoad
(15.)Aniline 2,4 DSA (1-Amino Benzene 2,4- Disulphonic Acid)300Tons per AnnumRoad
(16.)Copper Formazone Base (Copper Formazone Blue of 4-Sulfo Anthranilic Acid)60Tons per AnnumRoad
(17.)4 Sulpho Anthranilic Acid300Tons per AnnumRoad
(18.)4 Nitro 2 Amino Phenol 6 Sulphonic Acid (4 NAPSA)120Tons per AnnumRoad
(19.)4 Sulpho Hydrozene (2-[2-Phenylmethylene) hydrazinyl]-4-sulfobenzoic acid sodium salt)300Tons per AnnumRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 6
(b) Funds Allocated for Environment Management (Capital) (in Crores) 2.2
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.12
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 3.55
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 20
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 20
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)26739Tons per Annumopen marketRoad50 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2018 To 31 May 2018
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube77.253.771.7100
(2.)NOxMicro Gram per Meter Cube24.211.22080
(3.)PM2.5Micro Gram per Meter Cube44.924.639.760
(4.)SO2Micro Gram per Meter Cube20.79.215.180
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Total Hardnessmg/l612362300600
(2.)Chloridesmg/l12485382501000
(3.)Fluoridemg/l0.720.4111.5
(4.)TSSmg/l18.87.500
(5.)TDSmg/l246511545002000
(6.)pHNA7.677.348.58.5
    14.3.     No. of Surface Water monitoring locations : 3
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)BODmg/l23.511.8D
(2.)pHNA7.97.4A
(3.)DOmg/l4.23.7C
(4.)CODmg/l54.125.6D
    14.4.     No. of Ambient Noise monitoring locations : 9
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))54.951.575
(2.)Leq(Night)A-weighted decibels(dB(A))46.338.570
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Milligram per Kilogram152123
(2.)P(Phosphorus)Milligram per Kilogram1710
(3.)K(Potassium)Milligram per Kilogram242136
(4.)pHOtherspH unit7.97.39
(5.)Electric ConductivityOthersdS/m3.62.2
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 26.56 To 3.15
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.05 To 23.54
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater7400Copy of Permission LetterPipelineTube Well21-4/4670/GJ/IND/201822 Dec 201874
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Industrial103125ETP-RO-Spray dryerReuse within the Plant & Recycling103
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 103
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 103
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Iron sludgeHazardous Waste (as per Hazardous and Other Waste Management rules 2016)1800Tons55RoadOthersTSDF or co-processing
(2.)Used oilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.24Kilolitre55RoadAuthorized Recyclers
(3.)Discarded containers and linersHazardous Waste (as per Hazardous and Other Waste Management rules 2016)12Tons65RoadAuthorized Recyclers
(4.)Spent acidHazardous Waste (as per Hazardous and Other Waste Management rules 2016)4980Tons65RoadOthersInhouse reuse and sold to actual users
(5.)ETP sludgeHazardous Waste (as per Hazardous and Other Waste Management rules 2016)1200Tons55RoadTreatment, Storage and Disposal Facility(TSDF)
(6.)Gypsum wasteHazardous Waste (as per Hazardous and Other Waste Management rules 2016)1200Tons55RoadOthersTSDF or co-processing
(7.)Salt of spray dryerHazardous Waste (as per Hazardous and Other Waste Management rules 2016)720Tons55RoadTreatment, Storage and Disposal Facility(TSDF)
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)SO2Microgram per Meter Cube11.831.411.1112.9480
(2.)PM10Microgram per Meter Cube64.951.412.6267.57100
(3.)PM2.5Microgram per Meter Cube34.461.412.6237.0860
(4.)NOxMicrogram per Meter Cube15.481.410.7916.2780
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Process vesselNone110.3SO200
(2.)BoilerCoal210.45OthersPM, SO2, NOx00
(3.)HAGCoal300.45OthersPM, SO2, NOx00
(4.)Process vessel 2None110.3OthersSO2, NOx00
(5.)Spin flash dryerNone210.3PM1000
(6.)Spray dryerNone210.45PM1000
(7.)D G SetDiesel110.225OthersPM, SO2, NOx00
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 475
(b)Source MGVCL
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 125
(e)Stack Height (in m) 11
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0.4701
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 0.4701
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 16419
(b)Waste/Barren Land (ha.) 224
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 986
(e)Settlements (ha.) 1263
(f)Industrial (ha.) 393
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Bays and Estuaries, Dry Salt Flats, Tidal Flat 12193
    Total (ha.) 31478
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Green belt0.1550
(2.)Main Plant0.1519
(3.)OthersParking, roads and open area0.1632Parking, roads and open area
Total (ha.) 0.4701
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)NPABlackbuck National Park Velavadar64None within 10 km
(2.)WLSThol Wildlife Sanctuary87None within 10 km
(3.)ESZsNal Sarovar Birds Sanctuary70None within 10 km
(4.)Wildlife CorridorsNone within 10 km00None within 10 km
(5.)Critically Polluted AreaNone within 10 km00None within 10 km
(6.)ESAsMount Abu240None within 10 km
(7.)CorridorsNone within 10 km50None within 10 km
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestRatanmahal Sloth Bear Sanctuary144None within 10 km
(2.)Archaeological SitesLothal40None within 10 km
(3.)Defence InstallationsNone within 10 km50None within 10 km
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) Not Applicable
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0.4701
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 00
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 00
(b)No. of Households 00
(c)No. of PDFs (Project Displaced Families) 00
(d)No. of PAFs (Project Affected Families) 00
(e)Funds Allocated for R&R(in INR) (in Lacs) 00
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Pond of Neja
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Pond of Akhol and khambhat
(ii)Direction of Water Bodies in Buffer Area South East
(iii)Distance of Water Bodies in Buffer Area 5.83
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 35
(c)Temporary Employment- During Construction 25
(d)Temporary Employment- During Operation 0
(e)No. of working days 26
(f)Total Manpower 60
32.
Green Belt in Ha:
(a)Total Area of Green Belt 0.1555
(b)Percentage of Total Project Area 33.08
(c)No. of Plants to be Planted 150
(d)Funds Allocated for Plantation 200000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.       Project Benefits
S. No. Type of Project BenefitsDetails of Project Benefits
NIL
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA 0084
(ii)Name of the EIA Consultant San Envirotech Pvt. Ltd., Ahmedabad
(iii)Address 401/402/423/424/324, Medicine Market, Opp. Shefali Centre, Paldi cross Road, Ahmedabad
(iv)Mobile No. 9825007201
(v)Landline No. 0792658307
(vi)Email Id mahendra.sepl@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 23 Dec 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NA- Please inform whether the proposed industrial operations at the identified site would be in conformity with permitted land use of the area. This needs to be clarified along with supporting documents. - Please confirm whether all the proposed products (20 nos) are synthetic organic chemicals and thus requiring prior EC in terms of the EIA Notification, 2006. 30 Dec 2018
2.NAThe correction have been made as per the instruction received 03 Jan 2019
3.NAColumn 8.2 of Form-2 shows 20 nos of products (10500 TPA/875 TPM), which is not consistent with the products details informed in response to our earlier observations (19 products including the inorganic one). Present status of the earlier unit M/s Neel Chem Agro Tech Pvt Ltd operating at the project site and the CTO valid up to 9/2/2019. 13 Jan 2019
4.NAThe correction have been made as per the instruction received 19 Jan 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantKhagesh Rajnikant Amin
DesignationPartner
Name of Company (Applicant Name should not be given here)DTC INDUSTRIES UNIT II
AddressSurvey No. 384, Village Lunege, Tal Khambhat, Dist Anand
Print