Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Expansion in Pesticide Manufacturing Unit from 900 TPA to 7140 TPA by HPM Chemicals and Fertilizers Ltd. formerly known as Hindustan Pulverising Mills
(b)Name of the Company / Organisation HPM Chemicals and Fertilizers Ltd
(c)Registered Address 209-210, Annupam Bhavan, Azadpur commercial Complex, Delhi,,North,Delhi-110033
(d)Legal Status of the Company Others
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Gopi Ram Aggarwal
(b)Designation (Owner/ Partner/ CEO) Director
(c)Address NIL
(d)Pin code 301707
(e)E-mail hpmindiau1@gmail.com
(f)STD Code. 11(f)Telephone No. 45071800
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(b) Pesticides industry and pesticide specific intermediates (excluding formulations)
Minor Activity
(b)Category A
(c)Proposal Number IA/RJ/IND2/89499/2009
(d)Master Proposal Number(Single Window) SW/89495/2018
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. SP-9B, 9C, 9D, 9D1 and H1-39(O), RIICO Industrial
(b)Pincode 301707
(c)Bounded Latitudes (North)
From
Degree 28
Minutes
Second
From
Degree 28
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 76
Minutes
Second
From
Degree 76
Minutes
Second
(e)Survey of India Topo Sheet No. H43W12
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 5
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 10
(j)Seismic Zone 4
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Rajasthan
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-11011/459/2009-IA-II (I)
(c)Date of Issue of TOR 26 Feb 2009
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 11 Mar 2019
(c)Date of Issue of EC 18 Dec 2019
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason The expansion project falls in the notified indust
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Lucknow
(iii)Letter No. IV/ENV/R/IND-124/791/2010/599
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Jan 8 2019 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)3.0590062407140Tons per Annum(TPA)Road
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)NOVALURON (INSECTICIDE PGR)10100110
(2.)CHLORPYRIFOS ACEPHATE PROFENOFOS1508501000either or
(3.)FIPRONIL BUPROFEZINCARTAP HYDROCHLORIDE12080200either or
(4.)THIOPHANATE-METHYL METALAXYL202040either or
(5.)IMAZETHAPYR202040
(6.)CLODINAFOP-PROPARGYL595100
(7.)BUTACHLOR PRETILACHLOR1009001000either or
(8.)GLYPHOSATE OXYFLUORFEN ATRAZINE METRIBUZIN2507501000either or
(9.)DIAFENTHIURON0100100
(10.)CYPERMETHRIN PERMETHRIN DELTAMETHRIN0100100either or
(11.)CYPERMETHRICACIDCHLORIDE0850850
(12.)CLOQUINTOCET MEXYL0100100
(13.)ACETAMIPRID IMIDACLOPRID THIACLOPRID THIAMETHOXAM60240300Either or
(14.)LAMDA CYHALOTHRIN BIFENTHRIN30170200either or
(15.)HEXA TRICYCLA PROPICONA TEBUCONA DIFENO IPCONA PAC50300350either or
(16.)METSULF SULFOSULFU PYRAZOSULPHURON BENSULFURON3565100either or
(17.)PENDIMETHALIN0100100
(18.)MYCLOBUTANIL0100100
(19.)EMAMECTIN BENZOATE VALIDAMYCINE SPINOSAD50100150eother or
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 10 Apr 2018
(iv)Valid Upto 31 Mar 2022
(v)File No. F(PLG)/Alwar(Tijara)/39(1)/2015-2016/246-249
(vi)Application No. 2018-2019/PDF/3826
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 27.8916
(b) Funds Allocated for Environment Management (Capital) (in Crores) 5.22
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.2322
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.442
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 46817.57
(b)Existing quantity of raw material/fuel 7075.76
(c)Total quantity of raw material/fuel 53893.33
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)1,2,4-Triazole645.93Tons per AnnumLocalRoad25 Open MarketCopy of Linkage
(2.)Acetone8.5Tons per AnnumLocalRoad25 Open MarketCopy of Linkage
(3.)ammonia53Tons per AnnumLocalRoad25 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Oct 2017 To 31 Dec 2017
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube91.772.191.3100
(2.)SO2Micro Gram per Meter Cube15.29.015.180
(3.)NOxMicro Gram per Meter Cube22.814.522.880
(4.)PM2.5Micro Gram per Meter Cube52.836.052.460
    14.2.     No. of Ground Water monitoring locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.647.156.58.5
(2.)Total Hardnessmg/l1860286200600
(3.)Fluoridemg/l0.80.511.5
(4.)TDSmg/l14765325002000
(5.)Chloridesmg/l34561382501000
(6.)TSSmg/l00100600
    14.3.     No. of Surface Water monitoring locations : 0
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA8.56.5A
(2.)CODmg/l00A
(3.)DOmg/l00A
(4.)BODmg/l00A
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))70.358.475
(2.)Leq(Night)A-weighted decibels(dB(A))65.852.870
    14.5.     No. of Soil Sample Monitored locations : 4
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)Electric ConductivityOthersdS/m0.350.14
(2.)K(Potassium)Milliequivalents per 100 Gram0.90.3
(3.)pHOthersNA7.817.22
(4.)N(Nitrogen)Percent0.060.03
(5.)P(Phosphorus)Milliequivalents per 100 Gram15.34.2
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 20
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 20 To 40
(c)Whether Ground Water Intersection will be there ? NA
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersRIICO512.645Copy of Permission LetterPipelineOthersRIICO Water SupplyU(17)/2018-19/399021 Jan 2019512.64
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Industrial124.73150tertiary treatment and reuse of waterReuse within the Plant & Recycling,Green Belt Renewal Plant,Others51.59 kld losses73.1451.59
(2.)Domestic3550STPGreen Belt Renewal Plant,OthersSprinkling 6 kld and Losses 10 kld2510
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 159.73
(b)Total Discharged Water (Kilolitre per Day) 61.59
(c)Total Reused Water (Kilolitre per Day) 98.14
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)MEE SaltHazardous Waste (as per Hazardous and Other Waste Management rules 2016)2588Tons500RoadTreatment, Storage and Disposal Facility(TSDF)
(2.)ETP sludgeHazardous Waste (as per Hazardous and Other Waste Management rules 2016)427.05Tons500RoadTreatment, Storage and Disposal Facility(TSDF)
(3.)Ash from incineratorHazardous Waste (as per Hazardous and Other Waste Management rules 2016)23.44Tons500RoadTreatment, Storage and Disposal Facility(TSDF)
(4.)Used OilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.82Kilolitre25RoadAuthorized Recyclers
(5.)Process wasteIndustrial Waste1467.3Tons0OthersmanualOthersIncineration
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10SPMMicrogram per Meter Cube89.902.40.2190.11100
(2.)PM2.5Microgram per Meter Cube52.82.40.0152.8160
(3.)SO2Microgram per Meter Cube15.12.40.4115.5180
(4.)NOxMicrogram per Meter Cube19.102.40.1419.2480
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)IncineratorHSD300.2OthersHCl50
(2.)BoilerWood or coal or rice husk350.75PM10150
(3.)DG SetHSD7.50.1NOx50
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 1850
(b)Source Jaipur Vidyut Vitran Nigam Limited
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) Existing D. G. set (62 kVA) – 1 No. and Proposed D
(e)Stack Height (in m) 7.5
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0.0
(b)Private Land (ha.) 0.00
(c)Government Land (ha.) 3.05
(d)Revenue Land (ha.) 0.0
(e)Other Land (ha.) 0.0
    Total Land (ha.) 3.05
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 15496.2
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 1725.6
(e)Settlements (ha.) 2026.3
(f)Industrial (ha.) 600.2
(g)Forest (ha.) 957.8
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Scrub and fellow land 10472.2
    Total (ha.) 31278.3
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant0.558784
(2.)Green belt0.4669
(3.)OthersOther plant2.024316
Total (ha.) 3.05
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNone0None in 10 km radius
(2.)WLSNone0None in 10 km radius
(3.)ESAsNone0None in 10 km radius
(4.)Wildlife CorridorsNone0None in 10 km radius
(5.)NPANone0None in 10 km radius
(6.)CorridorsNone0None in 10 km radius
(7.)ESZsNone0None in 10 km radius
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestBanban main (A,B,C,D,E,F)5.5protected forest
(2.)Archaeological SitesNone0None in 10 km radius
(3.)Defence InstallationsNone0None in 10 km radius
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 3.05
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Aquired
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 5
(b)Permanent Employment-During Operation 20
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 5
(e)No. of working days 330
(f)Total Manpower 30
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt2582.872086.324669.1900000000005
(2.)No. of Plants33615661902
(3.)Funds Allocated1.52.754.25
(4.)Percentage of Total Project Area8.4713.6222.09
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)FinancialExpansion project will gain income and upsurge the turnover of HPM Chemicals and Fertilizers Ltd.
(2.)EnvironmentalHPM had done plantation in local area in the 2017-18 along the roadside, gardens etc. Proposed green belt area 2086.32 m2 will provide aesthetic view and habitat for the local avifauna.
(3.)SocialLocal people will be benefited direct and indirectly during construction and operation phase. It is envisaged that 30-40 Nos. of skilled and semiskilled labour will be employed during construction phase and additionally 30 Nos. of technical/nontechnical and labour based on their knowledge and skill will be employed during the operational phase. In addition to this there will be indirect business opportunities (refreshment shop, cycle/motorcycle repair shop etc.) for local people.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1720/ RA 051
(ii)Name of the EIA Consultant ECO CHEM SALES & SERVICES
(iii)Address Office Floor, Ashoka Pavilion, New Civil Road Surat (
(iv)Mobile No. 9227934111
(v)Landline No. 0261223163
(vi)Email Id eco@ecoshripad.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 19 Feb 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NA- Please submit copy of the EC dated 4/2/2010 for the present production of pesticides of 900 TPA, and the compliance status thereof through the concerned Regional Office of the Ministry. The same also needs to be mentioned in column 6 of Form-2. Entry in column 3 of Form-2 needs to be corrected for expansion of pesticides, and not for fertilizers. - Present status of the permission required for additional fresh water requirement of 462 cum/day. 31 Dec 2018
2.NAThe correction have been made as per the instruction received 07 Feb 2019
3.NA- There are no enclosures along with your reply dated 7/2/2019. - Entries at column 6 of form-2 are yet not filled up with the relevant details. - Certification to the effect that none of the pesticides is covered under banned category as notified by the concerned regulatory authorities from time to time. 15 Feb 2019
4.NAThe correction have been made as per the instruction received 19 Feb 2019
5.NAPlease refer your reply dated 7/2/2019 & 17/2/2019 to our earlier observations. It is to inform that still there are no enclosures. Also, no details are provided against column 6 of Form-2. Entry at column 3(a) of Form-2 needs to be corrected for categorization of the proposed project/activity. 03 Mar 2019
6.NAThe correction have been made as per the instruction received 11 Mar 2019
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterUploaded EC Transfer Application on 23.05.2019. 21 Jun 2019
2.NA

Deferred

17 May 2019
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantGopi Ram Aggarwal
DesignationDirector
Name of Company (Applicant Name should not be given here)HPM Chemicals and Fertilizers Ltd
Address209-210, Annupam Bhavan, Azadpur commercial Complex, Delhi