Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Construction of Proposed Common User Facility (CUF) at Sadashibpur (Meramundali), Dhenkanal, Odisha by BPCL, HPCL and IOCL with BPCL as lead company
(b)Name of the Company / Organisation BHARAT PETROLEUM CLEARANCE LIMITED MERAMUNDALI
(c)Registered Address Rasasingh, Pasasongh and Tentuliapada,,Sambalpur,Orissa-759121
(d)Legal Status of the Company Central PSU
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Simanchala Prasad Khadanga
(b)Designation (Owner/ Partner/ CEO) Head (Infra T/F) East
(c)Address BPCL,Eastern Regional Office, 2nd Floor Wing,No:31, PGM Road, Golf Green, Kolkata:700095,,Kolkata,Kolkata,West Bengal-700095
(d)Pin code 700095
(e)E-mail bpclmeramundali@gmail.com
(f)STD Code. 33(f)Telephone No. 24293291
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity6(b)Isolated storage & handling of hazardous chemicals (As per threshold planning
Minor Activity
(b)Category B1
   Reason for Applying at Ministry Other
   Other Reason for Applying at Ministry SEAC, Odisha not exist
(c)Proposal Number IA/OR/IND2/89481/2016
(d)Master Proposal Number(Single Window) SW/89480/2018
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 3575, 3576, 3576/4424, 3577e etc
(b)Pincode 759001
(c)Bounded Latitudes (North)
From
Degree 20.73
Minutes
Second
From
Degree 20.734
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 85.498
Minutes
Second
From
Degree 85.503
Minutes
Second
(e)Survey of India Topo Sheet No. F45T5,F45T6,F45T9,F45T10
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 96
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 4
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Orissa
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number SW/89480/2018
(b)Date of Apply of TOR 28 Dec 2016
(c)Date of Issue of TOR / Standard ToR 23 Aug 2017
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :11 Oct 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :14 Nov 2018
Distance of Public Hearing Venue from the Proposed Project :2
Conference Hall of Tahsil Office, Odapada
State :Orissa
District :Dhenkanal
Tehsil :Dhenkanal Sadar
Village :Sadashibpur
100Employment, Land loss, Accident prevention, Social responsibilityOthersAdditional District Magistrate
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Petroleum product storage tanks54742 KLTotal Storage Capacity of POL Depot
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)HSD26801OthersKILOLITRERail
(2.)ETHANOL2600OthersKILOLITRERoad
(3.)BIODIESEL3780OthersKILOLITRERoad
(4.)TRANSMIX1150OthersKILOLITRERail
(5.)MS20396OthersKILOLITRERail
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 270.02
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.98
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 3.44
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.15
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 54742
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 54742
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Ethanol2600OthersKILOLITREREFINERYRail200 CaptiveCopy of Linkage
(2.)Biodiesel3780OthersKILOLITREREFINERYRoad200 CaptiveCopy of Linkage
(3.)MS20396OthersKILOLITREREFINERYRail200 CaptiveCopy of Linkage
(4.)High Speed Diesel26801OthersKILOLITREREFINERYRail200 CaptiveCopy of Linkage
(5.)TRANSMIX1150OthersKILOLITRECAPTIVERail200 CaptiveCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Jan 2018 To 31 Mar 2018
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)SO2Micro Gram per Meter Cube7.65.06.580
(2.)OthersOZONEMicro Gram per Meter Cube13.15.09.9100
(3.)PM2.5Micro Gram per Meter Cube26.415.622.360
(4.)PM10Micro Gram per Meter Cube54.733.654.4100
(5.)NOxMicro Gram per Meter Cube14.46.511.680
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.086.136.58.5
(2.)TSSmg/l1111
(3.)TDSmg/l2221105002000
(4.)Total Hardnessmg/l23214200600
(5.)Chloridesmg/l84242501000
(6.)OthersSulphatemg/l314200400
(7.)Fluoridemg/l0.380.1511.5
(8.)Heavy MetalsMercurrymg/l0.0010.0010.0010.001
    14.3.     No. of Surface Water monitoring locations : 4
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.667.35C
(2.)BODmg/l2.32C
(3.)DOTDSmg/l7.96.5C
(4.)CODmg/l18.87C
(5.)OthersTotal Hardnessmg/l16652C
    14.4.     No. of Ambient Noise monitoring locations : 10
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))42.836.745
(2.)Leq(Day)A-weighted decibels(dB(A))50.845.855
    14.5.     No. of Soil Sample Monitored locations : 6
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Kilogram per hectare414296
(2.)Electric ConductivityMillisiemens per Centimetre0.2130.078
(3.)pHOthersNA6.925.97
(4.)P(Phosphorus)Kilogram per hectare61.225.1
(5.)K(Potassium)Kilogram per hectare317169
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 13.0 To 3.1
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.2 To 8.0
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater100Copy of Permission LetterPipelineTube WellBPCL/PS/POL/DNKL/7622 Dec 201810
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Washing, cooling22OWSGreen Belt Renewal Plant2
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 2
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 2
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)oily sludgeHazardous Waste (as per Hazardous and Other Waste Management rules 2016)2Tons300RoadAuthorized Recyclers
(2.)Kitchen waste, paper, plasticsMunicipal Solid Waste9.1Tons15RoadSanitary Landfills
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube26.40026.460
(2.)NOxMicrogram per Meter Cube14.40.051.1815.5880
(3.)PM10Microgram per Meter Cube54.70.050.855.5100
(4.)SO2Microgram per Meter Cube7.60.050.928.5280
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DGHSD BSIV122SO29.5
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 500
(b)Source Central Electricity Supply Unit (CESU), Odisha
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 500 KVA, 125 KVA
(e)Stack Height (in m) 12
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 23.58
(c)Government Land (ha.) 1.73
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 1.14
    Total Land (ha.) 26.45
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 45
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 11
(e)Settlements (ha.) 16
(f)Industrial (ha.) 0
(g)Forest (ha.) 20
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Roads, rail etc 8
    Total (ha.) 100
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant9.64
(2.)Green belt21.6
(3.)OthersRoad, railway, other34.13
Total (ha.) 65.37
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSNil0Not applicable
(2.)NPANil0Not applicable
(3.)ESAsNil0Not applicable
(4.)ESZsNil0Not applicable
(5.)CorridorsNil0Not applicable
(6.)Wildlife CorridorsNil0Not applicable
(7.)Critically Polluted AreaNil0Not applicable
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestMatharagadi RF2Not applicable
(2.)Archaeological SitesNil0Not applicable
(3.)Defence InstallationsNil0Not applicable
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 40
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 13.76
(b)Land yet to be acquired(Ha) 12.69
(c)Status of Land acquisition if not acquired In progress
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Elephas maximus (Asian Elephant)
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 69900000
(iii)Period of Implementation 5 years
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Brahmani River
(ii)Direction of Water Bodies in Buffer Area North
(iii)Distance of Water Bodies in Buffer Area 1.4
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 10
(b)Permanent Employment-During Operation 10
(c)Temporary Employment- During Construction 160
(d)Temporary Employment- During Operation 20
(e)No. of working days 330
(f)Total Manpower 200
32.
Green Belt in Ha:
(a)Total Area of Green Belt 8.74
(b)Percentage of Total Project Area 33.04
(c)No. of Plants to be Planted 3500
(d)Funds Allocated for Plantation 1000000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)Socialemployment
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA0048
(ii)Name of the EIA Consultant ABC Techno Labs India Pvt. Ltd.
(iii)Address 400, 13th Street, SIDCO Industrial Estate (North Phase) Ambattur – 600 098
(iv)Mobile No. 8420642002
(v)Landline No. 0442616112
(vi)Email Id abc@abctechnolab.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 25 May 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAPlease inform about the approval required from PESO for the site plan and the storage tanks details, to ensure safety measures. 31 Dec 2018
2.NAThe correction have been made as per the instruction received 08 Jan 2019
3.NAAs requested earlier, please submit proposal to PESO for the required approval for the site/layout plan and storage facilities. Also, please ensure that the storage details mentioned in column 8.1 & 8.2 are not at variance. 16 Jan 2019
4.NAThe correction have been made as per the instruction received 23 Jan 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantSimanchala Prasad Khadanga
DesignationHead (Infra T/F) East
Name of Company (Applicant Name should not be given here)BHARAT PETROLEUM CLEARANCE LIMITED MERAMUNDALI
AddressRasasingh, Pasasongh and Tentuliapada
Print