1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | M/s. Cheminova India Limited (Technical Division) | (b)Name of the Company / Organisation | CHEMINOVA INDIA LIMITED TECHNICAL DIVISION | (c)Registered Address | The Centrium, Unit No. 2,
4th Floor, Phoenix Market City,
LBS Marg, Kurla (West),
Mumbai-400 070,,Mumbai (Suburban),Maharashtra-400070 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Anil Narendra Shah | (b)Designation (Owner/ Partner/ CEO) | FactoryManager | (c)Address | M/s. Cheminova India Limited Technical Division, Plot No 241, 242/2, 241/P, GIDC Estate, Panoli, Tal. Ankleshwar, Dist. Bharuch 394116, Gujarat, India,,Anklesvar,Bharuch,Gujarat-394116 | (d)Pin code | 394116 | (e)E-mail | anilkumar.trivedi@fmc.com | (f)STD Code. | 22(f)Telephone No. | 3978622 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 5(b) Pesticides industry and pesticide specific intermediates (excluding formulations)
| Minor Activity | 5(b) Pesticides industry and pesticide specific intermediates (excluding formulations)
| (b)Category | A | (c)Proposal Number | IA/GJ/IND2/89462/1997 | (d)Master Proposal Number(Single Window) | SW/89455/2018 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 2 | (f)Project Type | Expansion |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Plot No. 241, 242/2, 241/P | (b)Pincode | 394116 | (c)Bounded Latitudes (North) | | From | | Degree | 21.57422 | Minutes | | Second | | From | | Degree | 21.57599 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 72.99638 | Minutes | | Second | | From | | Degree | 72.99806 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | F43M14, F43M15, F43N2, F43N3 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 26 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 8 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Gujarat | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | J-11011/000/1997-IA-II(I) | (c)Date of Issue of TOR | 02 Oct 1997 | (f)Previous TOR Letter | Copy of Previous TOR letter | (b)Date of Apply of EC | 20 May 2019 | (c)Date of Issue of EC | 25 Nov 2019 | (d)Previous EC Letter | Copy of Previous EC letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | Yes | (b)Reason | Project site is located in the Notified industrial | (c)Supporting Document | Copy of Supporting Document | |
|
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | SPCB | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | | (iii)Letter No. | NA | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Dec 12 2018 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Agrochemicals & their intermediates | 3533 | 12050 | 15583 | Tons per Annum(TPA) | | Road | | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | Plant-2 | AZOXY plant (G.F+2) | Debottle necking or Addition of floors | Plant-2 | Please refer Annexure-16 for more details | (2.) | Plant-1 | ACP plant (G.F+3) | Debottle necking or Addition of floors | Plant-1 | Please refer Annexure-16 for more details | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 25 Jul 2017 | (iv)Valid Upto | 16 Apr 2022 | (v)File No. | CCA No. AWH-87335 | (vi)Application No. | -- | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 365.92 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 17.15 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 2.76 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.9 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 0 | (b)Existing quantity of raw material/fuel | 15500 | (c)Total quantity of raw material/fuel | 15500 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Natural Gas | 15500 | Cubic Meter per Day | | Gujarat Gas Limited | Pipe Conveyor | | 15 | Linkage | | Copy of Linkage | (2.) | Furnace Oil | 4000 | Others | kilogram per day | Local supplier | Road | | 15 | Linkage | | Copy of Linkage | (3.) | High Speed Diesel | 4320 | Others | liter per day | Local supplier | Road | | 15 | Open Market | | Copy of Linkage | (4.) | Raw material | 9189.49 | Others | Metric Tonne per month | Indigenous & Import | Road | | 300 | Linkage | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Feb 2017 To 30 Apr 2017 | (b)Season | Pre-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 9 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM2.5 | | Micro Gram per Meter Cube | 33 | 7 | 33 | NAAQS | (2.) | PM10 | | Micro Gram per Meter Cube | 91 | 64 | 91 | NAAQS | (3.) | NOx | | Micro Gram per Meter Cube | 32 | 8 | 32 | NAAQS | (4.) | SO2 | | Micro Gram per Meter Cube | 26 | 7 | 26 | NAAQS | |
14.2. No. of Ground Water monitoring locations : 9 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | Chlorides | | | mg/l | | 369 | 18 | 250 | 1000 | (2.) | TSS | | | mg/l | | 70 | 10 | 10 | 10 | (3.) | Heavy Metals | | Zinc | mg/l | | 0.2 | 0.2 | 5 | 15 | (4.) | Total Hardness | | | mg/l | | 424 | 112 | 200 | 6000 | (5.) | pH | | | NA | | 8.31 | 7.07 | 7 | 8.5 | (6.) | Fluoride | | | mg/l | | 1.05 | 0.5 | 1 | 1.5 | (7.) | TDS | | | mg/l | | 1730 | 185 | 500 | 2000 | |
14.3. No. of Surface Water monitoring locations : 15 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | BOD | | mg/l | | 95 | 15 | B | (2.) | pH | | NA | | 8.55 | 7.16 | B | (3.) | COD | | mg/l | | 206 | 32 | B | (4.) | DO | | mg/l | | 7.5 | 1 | B | |
14.4. No. of Ambient Noise monitoring locations : 9 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Night) | A-weighted decibels(dB(A)) | 66 | 33 | Noise Rules 2000 | (2.) | Leq(Day) | A-weighted decibels(dB(A)) | 75 | 40 | Noise Rules 2000 | |
14.5. No. of Soil Sample Monitored locations : 9 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | P(Phosphorus) | Milligram per Kilogram | | 9.43 | 3.5 | (2.) | pH | Others | -- | 8.55 | 7.74 | (3.) | N(Nitrogen) | Percent | | 0.05 | 0.05 | (4.) | K(Potassium) | Milligram per Kilogram | | 331.68 | 64.356 | (5.) | Electric Conductivity | Others | µ mhos/cm | 1556 | 413.34 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 10 To 5 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 2 To 5 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Surface | | 410 | 1.89 | Copy of Permission Letter | Pipeline | | Weir | | Ref: CIL/Tech/July/001, Connection No.: 2081 | 16 Jul 1996 | 315 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Domestic | 35 | 50 | To be treated in STP | Green Belt Renewal Plant | | 35 | | (2.) | Industrial | 572 | 620 | To be treated in ETP/MEE/RO | Discharge into Seawater Body,Reuse within the Plant & Recycling | | 453 | 119 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 607 | (b)Total Discharged Water (Kilolitre per Day) | 119 | (c)Total Reused Water (Kilolitre per Day) | 488 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Stripped Solvent from Stripper | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 1200 | Tons | 50 | Road | | Others | premises/CHWIF/Co-processing/Autho users | (2.) | Process Waste | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 28151 | Tons | 15 | Road | | Others | Incineration/Co-processing | (3.) | Acetic Acid/Sodium Acetate/OrganicByproducts etc. | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 18224 | Tons | 50 | Road | | Others | CHWIF/Autho users | (4.) | Used or Spent Oil | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 50.36 | Tons | 15 | Road | | Authorized Recyclers | | (5.) | Spent Catalyst | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 90 | Tons | 15 | Road | | Others | CHWIF/regenerator | (6.) | NaCl Sol.n (19%) | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 145 | Tons | 50 | Road | | Others | Authorized Userswith Rule 9 permission/TSDF/CHWIF | (7.) | ETP Sludge | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 905 | Tons | 15 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (8.) | Evaporation Salt | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 13155 | Tons | 15 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (9.) | Date-expired and off specification pesticides | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 1000 | Tons | 15 | Road | | Others | CHWIF/Co-processing | (10.) | Ethanol | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 4520 | Tons | 50 | Road | | Others | Authorized Users having Rule 9 permission | (11.) | Empty barrels/containers/liners | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 5362.11 | Tons | 15 | Road | | Others | authorized recyclers/premises/CHWIF/TSDF | (12.) | Spent Solvent (MDC, EA, Acetone, etc.) | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 2500 | Tons | 50 | Road | | Others | premises/CHWIF/Co-processing/Autho users | (13.) | Distillation Residue | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 7300 | Tons | 15 | Road | | Others | CHWIF/Co-processing | (14.) | Spent Sulfuric Acid (50%) | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 16400 | Tons | 50 | Road | | Others | Authorized Users having Rule 9 permission | (15.) | HCl (30%) | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 1220 | Tons | 50 | Road | | Others | Authorized Users having Rule 9 permission | (16.) | Salts of per-acids | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 18864 | Tons | 50 | Road | | Others | Authorized Users having Rule 9 permission | (17.) | Contaminated cotton,PPE/other | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 50 | Tons | 15 | Road | | Others | TSDF/CHWIF | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 84 | 1.78 | 0.033 | 84.033 | NAAQS | (2.) | SO2 | | Microgram per Meter Cube | 22 | 1.78 | 0.382 | 22.382 | NAAQS | (3.) | NOx | | Microgram per Meter Cube | 28 | 1.78 | 0.178 | 28.178 | NAAQS | (4.) | PM2.5 | | Microgram per Meter Cube | 28 | 1.78 | 0.033 | 28.033 | NAAQS | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Attached to reaction vessel of ACP plant | -- | 25 | 0.065 | Others | HCl & Chlorine | 20 mg/Nm3 & 9 mg/Nm3 | (2.) | Reaction vessel of 4S Zeta Cypermethrin | -- | 25 | 0.065 | Others | HCl | 20 mg/Nm3 | (3.) | Regenerative Thermal Oxidizer | Natural gas | 30 | 0.15 | Others | CO | 2 mg/Nm3 | (4.) | Boiler- WHRB- CPP | Natural gas | 30 | 0.5 | SO2 | | 100 ppm | (5.) | Boiler- 10 TPH & 5 TPH | Natural gas & Furnace Oil | 30 | 0.6 | PM10 | | 150 mg/Nm3 | (6.) | Boiler- 10 TPH & 5 TPH | Natural gas & Furnace Oil | 30 | 0.6 | NOx | | 50 ppm | (7.) | Thermic fluid heater- 10 lakh Kcal/hr | Natural gas | 30 | 0.3 | SO2 | | 100 ppm | (8.) | D.G. Set- 1500 KVA | H.S.D | 11 | 0.2 | PM10 | | 150 mg/Nm3 | (9.) | D.G. Set- 1500 KVA | H.S.D | 11 | 0.2 | SO2 | | 100 ppm | (10.) | D.G. Set- 1500 KVA | H.S.D | 11 | 0.2 | NOx | | 50 ppm | (11.) | Attached to reaction vessel of AZOXY Plant | -- | 25 | 0.075 | Others | HCl & Chlorine | 20 mg/Nm3 & 9 mg/Nm3 | (12.) | Reaction vessel of Sulfentrazone & DBC80 | -- | 25 | 0.075 | Others | HCl | 20 mg/Nm3 | (13.) | Boiler- WHRB- CPP | Natural gas | 30 | 0.5 | PM10 | | 150 mg/Nm3 | (14.) | Boiler- WHRB- CPP | Natural gas | 30 | 0.5 | NOx | | 50 ppm | (15.) | Boiler- 10 TPH & 5 TPH | Natural gas & furnace Oil | 30 | 0.6 | SO2 | | 100 ppm | (16.) | D.G set- 1250 KVA | H.S.D | 11 | 0.2 | PM10 | | 150 mg/Nm3 | (17.) | D.G. set- 1250 KVA | H.S.D | 11 | 0.2 | SO2 | | 100 ppm | (18.) | D.G. set- 1250 KVA | H.S.D | 11 | 0.2 | NOx | | 50 ppm | (19.) | Thermic Fluid heater- 10 lakh Kcal/hr | Natural gas | 30 | 0.3 | PM10 | | 150 mg/Nm3 | (20.) | Thermic Fluid Heater- 10 lakh Kcal/hr | Natural gas | 30 | 0.3 | NOx | | 50 ppm | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 3500 | (b)Source | Dakshin Gujarat Vij Company Limited (DGVCL) | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | 1 no. of 1250 KVA & 1 no. of 1500 KVA | (e)Stack Height (in m) | 11 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 0 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 4.0476941 | Total Land (ha.) | 4.0476941 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 19466 | (b)Waste/Barren Land (ha.) | 5830 | (c)Grazing/ Community Land (ha.) | 0.0 | (d)Surface Water Bodies (ha.) | 521 | (e)Settlements (ha.) | 2802 | (f)Industrial (ha.) | 2797 | (g)Forest (ha.) | 0.0 | (h)Mangroves (ha.) | 0.0 | (i)Marine Area (ha.) | 0.0 | (j)Others (ha.) : NA | 0.0 | Total (ha.) | 31416 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Built Up Area | | 2.207151 | | (2.) | Green belt | | 1.345 | | (3.) | Others | Open area | 0.4955431 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | WLS | NA | 0 | -- | (2.) | ESAs | NA | 0 | -- | (3.) | ESZs | NA | 0 | -- | (4.) | Corridors | NA | 0 | -- | (5.) | Wildlife Corridors | NA | 0 | -- | (6.) | Critically Polluted Area | NA | 0 | -- | (7.) | NPA | NA | 0 | -- | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Others | NA | NA | 0 | -- | (2.) | Forest | | NA | 0 | -- | (3.) | Archaeological Sites | | NA | 0 | -- | (4.) | Defence Installations | | NA | 0 | -- | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | Not Applicable | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 4.0476941 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | NA | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | Yes | (i)Details of Schedule-I Species | Indian Peafowl | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | Yes | (i)Details of Water Bodies in Core Area | Khadis, Canal, Ponds | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Khadis, Canal, Ponds | (ii)Direction of Water Bodies in Buffer Area | North East | (iii)Distance of Water Bodies in Buffer Area | 5 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 154 | (b)Permanent Employment-During Operation | 46 | (c)Temporary Employment- During Construction | 346 | (d)Temporary Employment- During Operation | 154 | (e)No. of working days | 320 | (f)Total Manpower | 700 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 1.0796 | 0.2654 | 1.345 | (2.) | No. of Plants | 1620 | 450 | 2070 | (3.) | Percentage of Total Project Area | 26.67 | 6.56 | 33.230000000000004 | (4.) | Funds Allocated | 5.4 | 1.5 | 6.9 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Financial | Revenue Generation, Employment generation | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 2 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1821/RA 0104 | (ii)Name of the EIA Consultant | M/s. Siddhi Green Excellence Pvt. Ltd. | (iii)Address | “Kamal Arcade – The Vertical Sunclock”, Comm. Plot No. C-3/3, Nr. SBI Industrial Branch, Station Road, G.I.D.C, Ankleshwar – 393 002,Gujarat | (iv)Mobile No. | 9824345895 | (v)Landline No. | 2646224805 | (vi)Email Id | siddhi.ank@gmail.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 2 | (ix)Validity of Accreditation | 27 Apr 2021 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | Please confirm no requirement of prior environmental clearance for the existing production capacity of 3533 TPA in terms of the provisions of EIA Notification, 1994, along with the supporting documents. Also, please note that category A of item 5(b) of the schedule to the EIA Notification, 2006, mentions requirement of EC for the units producing technical grade pesticides. | 04 Jan 2019 | 2. | NA | The correction have been made as per the instruction received | 05 Jan 2019 | 3. | NA | - Please inform the approved production capacity of pesticides in the year 1994, as per the NOCs issued by GPCB on 11/9/1986 & 5/8/1987.
- No details made available regarding the existing/proposed products, whether technical grade pesticides or its intermediates to ascertain categorization of the unit (A/B). | 13 Jan 2019 | 4. | NA | The correction have been made as per the instruction received | 18 Jan 2019 | 5. | NA | It is yet to be established as to why no EC was obtained under the EIA Notification, 1994 for the present production of 3533 TPA. Please provide specific reply to our earlier observations dated 13/1/2019 for consideration of the proposal. | 26 Jan 2019 | 6. | NA | The correction have been made as per the instruction received | 28 Jan 2019 | 7. | NA | To resolve the issue, the matter may be discussed with us in the Ministry. Meanwhile, please ensure that none of the pesticides/chemicals presently manufactured and the proposed ones, are banned by the regulatory authorities for manufacture, use, transport, etc. | 03 Feb 2019 | 8. | NA | The correction have been made as per the instruction received | 05 Feb 2019 | 9. | NA | Please see recommendations of the sectoral EAC in a similar case, in its meeting held in April, 2019, for the needful. | 28 Apr 2019 | 10. | NA | The correction have been made as per the instruction received | 20 May 2019 | |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | Reply attached as per additional details sought on 16/07/2019 and points mentioned in minutes of 9th EAC (Industry-2) meeting dated 28/06/2019 | 30 Jul 2019 | 2. | NA | Proposal deferred for want of additional information
| 16 Jul 2019 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Anil Narendra Shah | Designation | FactoryManager | Name of Company (Applicant Name should not be given here) | CHEMINOVA INDIA LIMITED TECHNICAL DIVISION | Address | The Centrium, Unit No. 2,
4th Floor, Phoenix Market City,
LBS Marg, Kurla (West),
Mumbai-400 070 |
|