1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Proposed Pachhtardi Limestone Mine (Area- 18.03.88 ha) with limestone Production Capacity of 0.35 Million TPA located at survey No 78/P, Village: Pachhtardi, Taluka: Bhanvad, District: Devbhumi Dwarka | (b)Name of the Company / Organisation | M/S.SHEE DIGVIJAY CEMENT CO. LTD | (c)Registered Address | Post Digvijaygram;Sikka, Jamnagar (Gujarat),,Jamnagar,Gujarat-361140 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | KK Rajeev Nambiar | (b)Designation (Owner/ Partner/ CEO) | C.E.O & Whole Time Director | (c)Address | Digvijaygram, Sikka, Jamnagar 361140 (Gujarat),,,Jamnagar,Gujarat-361140 | (d)Pin code | 361140 | (e)E-mail | sdccl.env@digvijaycement.com | (f)STD Code. | 2895(f)Telephone No. | 262064 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 1(a) Mining of minerals
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/GJ/MIN/65781/2017 | (d)Master Proposal Number(Single Window) | SW/89448/2018 | (e)EAC concerned (for category A Projects only) | Non-Coal Mining | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | 78/p | (b)Pincode | 361345 | (c)Bounded Latitudes (North) | | From | | Degree | 215116.39 | Minutes | | Second | | From | | Degree | 215138.11 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 694058.74 | Minutes | | Second | | From | | Degree | 694133.83 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | Restricted | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 102 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 5.0 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Gujarat | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Gujarat | Devbhumi Dwarka | Bhanvad | | |
|
6. | Details of Terms of Reference (ToR): | (a)MoEF&CC / SEIAA File Number | J-11015/240/2016-IA.II(M) | (b)Date of Apply of TOR | 14 Nov 2017 | (c)Date of Issue of TOR / Standard ToR | 09 Jan 2018 | (d)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 12 Oct 2018 | Distance of Public Hearing Venue from the Proposed Project : | 0 |
| Survey No 78/P, near Pachhtardi primary school | State : | Gujarat | District : | Devbhumi Dwarka | Tehsil : | Bhanvad | Village : | Pachhtardi |
| 197 | No any issue raised during public hearing. Support was given to Project proponent for dooing work in field of village development work, education, employment, health & water facility etc. | District Collector | | |
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | Pachhtardi Limestone Mine | limestone Production Capacity 0.35 Million TPA | | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Limestone | 350000 | Tons per Annum | | Road | | (2.) | Mining lease area | 18.03.88 | Hectares | | Others | . | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | N/A | (iv)Valid Upto | N/A | (v)File No. | NA | (vi)Application No. | NA | (vii)Copy of Consent to operate valid as on date | NA | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 5.0 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 0.10 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0.15 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.10 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | Yes | c)Notified Eco-sensitive areas | Yes | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 0 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 0 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | HSD | 175000 | Others | Litres | Nearby HSD Pump | Road | | 20 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Dec 2017 To 27 Feb 2018 | (b)Season | Winter | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | SO2 | | Micro Gram per Meter Cube | 13.3 | 6.5 | 13.164 | 80 | (2.) | PM2.5 | | Micro Gram per Meter Cube | 43.9 | 25.9 | 43.54 | 60 | (3.) | PM10 | | Micro Gram per Meter Cube | 84.3 | 52.4 | 83.662 | 100 | (4.) | NOx | | Micro Gram per Meter Cube | 21.3 | 11.2 | 21.098 | 80 | |
14.2. No. of Ground Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | Chlorides | | | NA | | 756.40 | 68.75 | 250 | 1000 | (2.) | Total Hardness | | | mg/l | | 1070.65 | 144.85 | 200 | 600 | (3.) | TSS | | | NA | | . | . | . | . | (4.) | Fluoride | | | mg/l | | 0.60 | 0.12 | 1.0 | 1.5 | (5.) | pH | | | NA | | 7.98 | 7.15 | 6.8 | 8.5 | (6.) | TDS | | | mg/l | | 1456 | 284 | 500 | 2000 | (7.) | Heavy Metals | | others | NA | | . | . | . | . | |
14.3. No. of Surface Water monitoring locations : 2 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | NA | | 7.52 | 7.49 | D | (2.) | BOD | | mg/l | | 16.20 | 12.0 | D | (3.) | COD | | mg/l | | 46.40 | 34.80 | D | (4.) | DO | | mg/l | | 5.20 | 4.90 | D | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 53.8 | 51.4 | I- 75, R-55 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 43.9 | 41.1 | I-70, R-45 | |
14.5. No. of Soil Sample Monitored locations : 11 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | Others | . | 8.16 | 7.76 | (2.) | N(Nitrogen) | Kilogram per hectare | | 325.45 | 266.20 | (3.) | P(Phosphorus) | Kilogram per hectare | | 40.15 | 18.26 | (4.) | Electric Conductivity | Millisiemens per Centimetre | | 0.39 | 0.25 | (5.) | K(Potassium) | Kilogram per hectare | | 485.66 | 289.85 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 16 To 22 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 04.6 To 22 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | GroundWater | | 22 | 0 | Copy of Permission Letter | modeOthers | Tankers | Others | Proposed Bore wells | 21-4/4141/GJ/MIN/2018 | 16 Jul 2018 | 22 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Drinking & sanitation | 0.5 | 4 | Soal Pit Via septic tank | Others | Soak Pit via septic tank | 0 | 0.5 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 0.5 | (b)Total Discharged Water (Kilolitre per Day) | 0.5 | (c)Total Reused Water (Kilolitre per Day) | 0 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Soil | Others | Mine waste | 0 | Tons | 0 | Others | No Soil generation | Others | No soil generation | (2.) | OB | Others | Mine excavation | 0 | Tons | 0 | Others | No OB generataion | Others | No OB generation | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 64.5 | 0 | 1.03 | 65.53 | 100 | (2.) | PM2.5 | | Microgram per Meter Cube | 33.2 | 0 | 0.63 | 33.83 | 60 | (3.) | SO2 | | Microgram per Meter Cube | 10.4 | 0 | 0.48 | 10.88 | 80 | (4.) | NOx | | Microgram per Meter Cube | 15.9 | 0 | 2.56 | 18.46 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | . | . | . | . | Others | . | . | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 25 | (b)Source | Pashchim Gujarat Vij Co. Ltd. (PGVCL). | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | Power backup for emergency services like PC and Li | (e)Stack Height (in m) | 0 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 0 | (c)Government Land (ha.) | 18.0388 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 18.0388 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 0 | (b)Waste/Barren Land (ha.) | 18.0388 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 0 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : 0 | 0 | Total (ha.) | 18.0388 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Quarry Area | | 13.8690 | | (2.) | Built Up Area | | 0.55 | | (3.) | Green belt | | 2.0150 | | (4.) | Others | Undisturbed | 1.6048 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Critically Polluted Area | none | 0 | No CPA within 10 km of mine site | (2.) | WLS | Barda Wildlife sanctuary | 1.5 | no | (3.) | NPA | None | 0 | No NPA within 10 km of mine site | (4.) | ESZs | ESZ of Barda Wildlife sanctuary | 1.18 | No | (5.) | Corridors | None | 0 | No Corridors within 10 km of mine site | (6.) | ESAs | None | 0 | No ESA within 10 km of mine site | (7.) | Wildlife Corridors | None | 0 | No Wildlife corridors with in 10 km of mine site | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | None | 0 | 0 | (2.) | Defence Installations | | None | 0 | 0 | (3.) | Archaeological Sites | | None | 0 | 0 | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 18.0388 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | Mining lease is Govt waste land | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 1 | (b)No. of Households | 248 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | Yes | (i)Details of Schedule-I Species | Indian Peafowl, Leopard, monitor lizard | (b)Whether conservation plan for Schedule-I Species has been prepared ? | Yes | (i)Uploaded copy of conservation plan | Copy of conservation plan | (ii)Fund Provision made | 22.20 | (iii)Period of Implementation | 5 years | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Vartu River | (ii)Direction of Water Bodies in Buffer Area | North West | (iii)Distance of Water Bodies in Buffer Area | 5.0 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 63 | (c)Temporary Employment- During Construction | 10 | (d)Temporary Employment- During Operation | 0 | (e)No. of working days | 300 | (f)Total Manpower | 73 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 2.015 | (b)Percentage of Total Project Area | 11.17 | (c)No. of Plants to be Planted | 4030 | (d)Funds Allocated for Plantation | 8.06 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
NIL | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For Non-Coal Mining |
|
1. No. of Mineral(s) to be Mined : 1 |
---|
S. No. | Mineral(s) to be Mined | Major or Minor Mineral |
---|
(1.) | Limestone | Major | |
|
2. | Mine Capacity in ROM (Run of Mine) | 0.35 million TPA | |
|
|
4. | Mining Plan: | (a)Approval Letter No. | 682(23)(450)/ 2006- Uday | (b)Date of Approval | 11 Jul 2006 | (c)Approved Letter | Copy of Approved Letter | (d)Approved By State Mining and Geology Department | IBM | (e)Approved Mining Lease Area | 18.0388 | (f)Approved Capacity | 350000 | |
|
5. | Technical Details: | (a)Total Geological Reserves (Million Ton) | 5.400000 | (b)Mineable Reserves (Million Ton) | 4.018680 | (c)Extractable Reserves(Million Ton) | 4.018680 | (d)Percent(%) of Extraction | 100 | (e)Grade of Coal /Ore /Mineral | Cement grade | (f)Stripping Ratio | 1 : 0 | (g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) | . | (h)Average Gradient(Degree) | . | (i)Mining Method | Opencast | (j)Life of Mine (Years) | 12 | |
|
6. | Details of Beneficiations: | (a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area | No | (b)Whether it is proposed to install crusher within the mining lease area | No | |
|
7. | Details of Seams: | (a)Whether details of seam applicable | No | |
|
8. | Details of Mining Lease: | (a)Mining Lease Area (in Hectare) | 18.0388 | (b)Whether obtained Letter of Intent (LOI) from the state government ? | Yes | (i)Copy of Letter of Intent | Copy of Letter of Intent | (ii)Date of issue of LOI | 09 Nov 2005 | (iii)Validity of LOI | 30 | (iv)Reference No. of LOI | Ref: MCR-1103-2119(2)-Chh | (c)Whether Lease Deed Executed ? | Yes | (i)Copy of Executed Lease deed valid as on Date | Copy of Executed Lease deed | (ii)Provide area in Hectare as per executed lease deed (initial) document | 18.0388 | (iii)Validity of the lease deed | From : 11 Jan 2017 To : 10 Jan 2067 | (iv)Date of Execution of Mining Lese | 11 Jan 2017 | (v)Reference Number | GJ35340660265903P | (d)Whether Lease Deed Renewed ? | No | (i)Reason thereof | Valid upto year 2067 | |
|
9. | OB (Over Burden) Management: | (a) Details of External Dumps: | (i)No. of OB Dumps | 0 | (ii)Total Area (in Hectare) | 0 | (iii)Height (in meter) | 0 | (iv)Quantity (in Million Cubic meter) | 0 | (v)No. of year back fill up | 0 | (b) Details of Internal Dumps: | (i)No. of Internal Dumps | 0 | (ii)Total Area (in Hectare) | 0 | (iii)Height (in meter) | 0 | (iv)Quantity (in Million Cubic meter) | 0 | |
|
10. | Details of Topsoil Management: | (a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) | 0 | (b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) | 0 | (c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) | 0 | |
|
11. | Details of Final Mine Void: | (a)Area (in Hectare) | 18.0388 | (b)Depth (in meter) | 15 | (c)Volume (in Million Cubic meter) | 2.70 | |
|
12. | Details of Quarry: | (a)Final Void of 13.8690 (hectare) at a Depth of 15 meter which is Proposed to be Converted into a Water Body. | (b)Total Quarry Area (ha) | 18.0388 | |
|
13. | Details of Transportation: | (a)In Pit/Underground to Surface | NA | (b)Surface to Siding/Loading | NA | (c)Transportation / Conveyor Details | Dumpers | |
|
|
14. Details of Land Usage (Pre-Mining) |
---|
S. No. | LAND USE | Other LAND USE | WITHIN ML AREA (Hectare) | OUTSIDE ML AREA (Hectare) | TOTAL (Hectare) |
---|
(1.) | AGRICULTURE LAND | | 0 | 0 | 0 | (2.) | WASTE LAND | | 18.0388 | 0 | 18.0388 | (3.) | GRAZING LAND | | 0 | 0 | 0 | (4.) | SURFACE WATER BODIES | | 0 | 0 | 0 | (5.) | FOREST LAND | | 0 | 0 | 0 | (6.) | SETTLEMENTS | | 0 | 0 | 0 | |
TOTAL | 18.0388 | 0 | 18.0388 | |
|
15. Details of Land Usage (Post-Mining) |
---|
S. No. | LAND USE | Other LAND USE | Plantation (ha) | Water Body (ha) | Public Use (ha) | Undisturbed (ha) | Total |
---|
(1.) | INTERNAL OB DUMPS | | 0 | 0 | 0 | | 0 | (2.) | ROADS | | 0 | 0 | 0 | | 0 | (3.) | BUILT UP AREA (COLONY/OFFICE) | | 0 | 0 | 0.55 | | 0.55 | (4.) | GREEN BELT | | 2.0150 | 0 | 0 | | 2.015 | (5.) | TOP SOIL STORAGE | | 0 | 0 | 0 | | 0 | (6.) | EXTERNAL OB DUMPS | | 0 | 0 | 0 | | 0 | (7.) | VIRGIN AREA | | 0 | 0 | 1.6048 | | 1.6048 | (8.) | EXCAVATION/QUARRY | | 0 | 13.8690 | 0 | | 13.869 | |
TOTAL | 2.015 | 13.869 | 2.1548 | 0 | 18.0388 | |
16. | Details of Reclamation: | Total Afforestation Plan shall be Implemented Covering of Mining.This will Include: | (a)External OB Dump(in hectare) | 0 | (b)Internal Dump(in hectare) | 0 | (c)Quarry(in hectare) | 0 | (d)Safety Zone(in hectare) | 2.0150 | (e)Final Void of 13.8690 (hectare) at a Depth of 15 meter which is Proposed to be Converted into a Water Body. | (f)Density of Tree Plantation per ha (in no.) | 2000 | (g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) | 0.55 | (h)Total afforestation plant (in hectare) | 2.015 | |
|
17. | Status of progressive Mining Closure Plan: | Details Not Applicable | |
|
18. Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception: |
---|
S. No. | Financial Year | Sanctioned Capacity as per EC (MTPA) | Sanctioned Capacity as per CTO | Sanctioned Capacity as per approved mining plan | Actual Production | Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA) |
---|
(1.) | 0 | 0 | 0 | 0 | 0 | 0 | |
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1619/RA0069 | (ii)Name of the EIA Consultant | JM EnviroNet Pvt Ltd | (iii)Address | 202-A, ABW Tower, MG Road, IFFCO Chowk, Sector 25, Gurugram Haryana-122001 | (iv)Mobile No. | 9509267011 | (v)Landline No. | 0124414192 | (vi)Email Id | jmenviron@hotmail.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Non-Coal Mining | (ix)Validity of Accreditation | 18 May 2019 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | 1. It is observed that the PP applied for amendment in TOR such as correction in the mine lease area (from 18.03 ha to 18.03.88 ha), the proposal was placed in EAC held during 20-21th February, 2019. The committee recommended the amendment in the TOR subject to confirmation from the State Mines and Geology w.r.t. mine lease area. The information from State Mines and Geology is still awaited, therefore, in the current situation the proposal may not be processed further until get the required clarification. It is also recommended to get the amendment in TOR first.
2. In the Form 2 it was mentioned that the total mine lease is 18.0388 ha.
3. Copy of approval letter for conservation plan.
4. Public hearing advertisement mentioned 18.03 ha and conducted for 18.03 ha.
5. Copy of mining plan is not submitted | 11 Apr 2019 | 2. | NA | The correction have been made as per the instruction received | 25 Oct 2019 | |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | We are herewith submitting ADS reply | 30 Jul 2020 | 2. | NA | deferred | 26 Mar 2020 | 3. | ADS Reply Letter | we are herewith submitting ADS Reply in ref of 11th EAC MoM | 06 Jan 2020 | 4. | NA | deferred
| 20 Dec 2019 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | KK Rajeev Nambiar | Designation | C.E.O & Whole Time Director | Name of Company (Applicant Name should not be given here) | M/S.SHEE DIGVIJAY CEMENT CO. LTD | Address | Post Digvijaygram;Sikka, Jamnagar (Gujarat) |
|