Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Recovery plant modernization project of existing paper/board manufacturing plant at ITC Limited PSPD, unit Bhadrachalam by replacing existing recovery boilers with one new energy efficient recovery bo
(b)Name of the Company / Organisation ITC Limited ,Paper Boards and Specialty Papers Division, Unit: Bhadrachalam
(c)Registered Address NIL
(d)Legal Status of the Company NIL
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant
(b)Designation (Owner/ Partner/ CEO) Head Manufacturing & Projects
(c)Address NIL
(d)Pin code 500003
(e)E-mail prafulla.samantasinghar@itc.in
(f)STD Code. (f)Telephone No.
(g)Fax No. 0427842997
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(i) Pulp & paper industry excluding manufacturing of paper from waste
Minor Activity1(d) Thermal Power Plants
(b)Category A
(c)Proposal Number IA/TG/IND/89386/2018
(d)Master Proposal Number(Single Window) SW/89384/2018
(e)EAC concerned (for category A Projects only) NIL
(f)Project Type Modernization under para 7(ii)
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 262
(b)Pincode 507128
(c)Bounded Latitudes (North)
From
Degree 17.69076
Minutes
Second
From
Degree 17.708705
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 80.860
Minutes
Second
From
Degree 80.866
Minutes
Second
(e)Survey of India Topo Sheet No. 65C/13 and 65C/14
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 68
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 2
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Telangana
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)GujaratkutchMundraBaroi, Goarsama, Shekhadia, Luni
6.
Details of Terms of Reference (ToR)/EC: Not Applicable
4.
Whether the Project Exempted from Public Hearing? Details Not Applicable
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Chennai
(iii)Letter No. EP/12.1/2010-11/55/AP/1177
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit May 25 2017 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Captive Power Plant114.511.5126Mega Watt(MW)Otherscaptive
(2.)Paper/Board7400000740000Tons per Annum(TPA)Road
(3.)Captive chemical hardwood pulp35000050000400000Tons per Annum(TPA)Otherscaptive production
(4.)Captive Bleached Chemi Thermo Mechanical Pulp10000050000150000Tons per Annum(TPA)Otherscaptive production
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)De-Inking plant120 BD TPD0120 BD TPDNo change
(2.)Secondary Fibre Treatment540 BD TPD0540 BD TPDNo change
(3.)Chemical Recovery Boiler2200 TPD of Black liquor Solids5002700 TPD of Black liquor SolidsRetiring of existing Boiler with new Energy efficient recovery boiler
(4.)Lime kiln500 TPD30 TPD530 TPDAugmentation
(5.)Power boilers530 TPH- 90 TPH440 TPHReduction due to new EERB. No new coal fired boiler is proposed
(6.)Waste water treatment Plant-1100000 m3/day0100000 m3/dayNo change
(7.)Wastewater Treatment Plant-280000 m3/day080000 m3/dayNo change
(8.)Paper/Board740000 TPA0740000 TPANo change
(9.)Captive Chemical Hardwood Pulp Mill350000 BD TPA50000 BD TPA400000 BD TPAIncrease in captive pulp production
(10.)ClO2 Plant10 TPD7 TPD17 TPDNew ClO2 plant of 7 TPD
(11.)Oxygen generation Plant4000 Nm3/Hr500 Nm3/Hr4500 Nm3/hrAugmentation
(12.)White liquor Oxidation plant24 m3/hr024 m3/hrNo change
(13.)Evaporator450 TPH100 TPH550 TPHUpgradation
(14.)Re-causticizing Plant450 TPD of active alkali150 TPD of active alkali600 TPD of active alkaliAugmentation
(15.)Ozone Plant6 TPD06 TPDNo change
(16.)Captive Bleached Chemi Thermo Mechanical Pulp100000 AD TPA50000 AD TPA150000 AD TPAIncrease in captive pulp production
(17.)Captive Power Plant114.5 MW11.5 MW126 MWActual power Generation will be limited to existing consented level of 114.5 MW
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 04 Apr 2017
(iv)Valid Upto 30 Nov 2020
(v)File No. TSPCB/17042480631/2017
(vi)Application No. TSPCB/17042480631/2017
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 950
(b) Funds Allocated for Environment Management (Capital) (in Crores) 100
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 4.75
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 1
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Imported bleached hardwood pulp45000Tons per AnnumimportedRoad250 Open MarketCopy of Linkage
(2.)Wood1800000Tons per AnnumSocial and farm forestryRoad100 OthersSocial and farm forestryCopy of Linkage
(3.)Imp. Soft Wood Pulp/Imported Waste Paper28000Tons per AnnumimportedRoad250 Open MarketImportedCopy of Linkage
16.
Baseline Data Not Applicable
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 2 To 5
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 2 To 5
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface800002Copy of Permission LetterPipelineIntake WellG.O ms No. 7103 Dec 201668220
(2.)Surface800002 Not Appliacble PipelineIntake WellG.O. Ms No. 50326 Jun 197611825
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Entire plant operations6850080000Biological TreatmentOthersLand irrigation/River Godavari200066500
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 68500
(b)Total Discharged Water (Kilolitre per Day) 66500
(c)Total Reused Water (Kilolitre per Day) 2000
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Lime sludge from lime kilnIndustrial Waste33580Tons5RoadOthersSent to cement plants
(2.)Chipper dustIndustrial Waste28470Tons5RoadCo-Processingused as fuel
(3.)Waste fibre from SFTIndustrial Waste3650Tons4RoadOtherssent to low grade paper board facilities
(4.)Fly Ash and bottom ash from coal fired boilersFly Ash350400Tons5RoadOthersutilized by fly ash brick manufacturing facilities
(5.)Waste sludge from DIPHazardous Waste (as per Hazardous and Other Waste Management rules 2016)12775Tons10RoadCo-Processing
(6.)Used OilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)75Kilolitre10RoadAuthorized Recyclers
(7.)primary clarifier sludgeHazardous Waste (as per Hazardous and Other Waste Management rules 2016)16425Tons10RoadOtherssent to low grade paper board facilities
(8.)Non ferrous scrapHazardous Waste (as per Hazardous and Other Waste Management rules 2016)13Tons10RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)SO2Microgram per Meter Cube14001480
(2.)PM2.5Microgram per Meter Cube41.750041.7560
(3.)NOxMicrogram per Meter Cube10.50010.580
(4.)PM10Microgram per Meter Cube76.750076.75100
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)EERB (new)Black liquor Solid1002PM1010
(2.)EERB (new)black liquor solid1002NOx27.22
(3.)EERB (new)Black liquor solid1002SO246.9
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 127000
(b)Source Captive Power Plant
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) Not Applicable
(e)Stack Height (in m) 65
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 241
    Total Land (ha.) 241
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 186
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Green Belt 55
    Total (ha.) 241
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant160Total mill area
(2.)Township81colony bank and other area
Total (ha.) 241
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNA0NA
(2.)NPANA0NA
(3.)ESZsNA0NA
(4.)ESAsNA0NA
(5.)CorridorsNA0NA
(6.)Wildlife CorridorsNA0NA
(7.)WLSKinnersanni Wildlife sanctuary7Southern Direction
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestPalvoncha reserved forest6.6South Western Side
(2.)Defence InstallationsNA0NA
(3.)Archaeological SitesNA0NA
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 241
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Entire land is already acquired
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Godavari River
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Kinnerasani
(ii)Direction of Water Bodies in Buffer Area South
(iii)Distance of Water Bodies in Buffer Area 7.3
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 0
(c)Temporary Employment- During Construction 200
(d)Temporary Employment- During Operation 200
(e)No. of working days 340
(f)Total Manpower 400
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt1360136
(2.)Percentage of Total Project Area35035
(3.)Funds Allocated000
(4.)No. of Plants2040000204000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialCSR for community development
(2.)EnvironmentalReduction in coal consumption and other emission
(3.)FinancialReduction in the usage of imported pulps, thus saving FOREX to the tune of Rs. 400 Crores per year.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 1
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/SA 076
(ii)Name of the EIA Consultant Cholamandalam MS Risk Services Limited
(iii)Address Cholamandalam MS Risk Services Limited, Parry House, 3rd Floor, No.2, NSC Bose Road, Parrys, Chennai-600001
(iv)Mobile No. 9677003778
(v)Landline No. 0443044562
(vi)Email Id bhaskarVS@cholams.murugappa.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 1
(ix)Validity of Accreditation 23 May 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAYou are requested to submit the latest certificate of compliance of earlier EC. The certificate which was submitted is of more than one year old 24 Dec 2018
2.NAThe correction have been made as per the instruction received 15 Feb 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of Applicant
DesignationHead Manufacturing & Projects
Name of Company (Applicant Name should not be given here)ITC Limited ,Paper Boards and Specialty Papers Division, Unit: Bhadrachalam
AddressDivisional Headquarters: 106, Sardar Patel Road, Secunderabad- 500 003