1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Recovery plant modernization project of existing paper/board manufacturing plant at ITC Limited PSPD, unit Bhadrachalam by replacing existing recovery boilers with one new energy efficient recovery bo | (b)Name of the Company / Organisation | ITC Limited ,Paper Boards and Specialty Papers Division, Unit: Bhadrachalam | (c)Registered Address | NIL | (d)Legal Status of the Company | NIL | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | | (b)Designation (Owner/ Partner/ CEO) | Head Manufacturing & Projects | (c)Address | NIL | (d)Pin code | 500003 | (e)E-mail | prafulla.samantasinghar@itc.in | (f)STD Code. | (f)Telephone No. | | (g)Fax No. | 0427842997 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 5(i) Pulp & paper industry excluding manufacturing of paper from waste
| Minor Activity | 1(d) Thermal Power Plants
| (b)Category | A | (c)Proposal Number | IA/TG/IND/89386/2018 | (d)Master Proposal Number(Single Window) | SW/89384/2018 | (e)EAC concerned (for category A Projects only) | NIL | (f)Project Type | Modernization under para 7(ii) |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | 262 | (b)Pincode | 507128 | (c)Bounded Latitudes (North) | | From | | Degree | 17.69076 | Minutes | | Second | | From | | Degree | 17.708705 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 80.860 | Minutes | | Second | | From | | Degree | 80.866 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 65C/13 and 65C/14 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 68 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 2 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Telangana | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Gujarat | kutch | Mundra | Baroi, Goarsama, Shekhadia, Luni | |
|
6. | Details of Terms of Reference (ToR)/EC: | Not Applicable | |
|
4. | Whether the Project Exempted from Public Hearing? | Details Not Applicable | |
|
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Chennai | (iii)Letter No. | EP/12.1/2010-11/55/AP/1177 | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | May 25 2017 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Captive Power Plant | 114.5 | 11.5 | 126 | Mega Watt(MW) | | Others | captive | (2.) | Paper/Board | 740000 | 0 | 740000 | Tons per Annum(TPA) | | Road | | (3.) | Captive chemical hardwood pulp | 350000 | 50000 | 400000 | Tons per Annum(TPA) | | Others | captive production | (4.) | Captive Bleached Chemi Thermo Mechanical Pulp | 100000 | 50000 | 150000 | Tons per Annum(TPA) | | Others | captive production | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | De-Inking plant | 120 BD TPD | 0 | 120 BD TPD | No change | (2.) | Secondary Fibre Treatment | 540 BD TPD | 0 | 540 BD TPD | No change | (3.) | Chemical Recovery Boiler | 2200 TPD of Black liquor Solids | 500 | 2700 TPD of Black liquor Solids | Retiring of existing Boiler with new Energy efficient recovery boiler | (4.) | Lime kiln | 500 TPD | 30 TPD | 530 TPD | Augmentation | (5.) | Power boilers | 530 TPH | - 90 TPH | 440 TPH | Reduction due to new EERB. No new coal fired boiler is proposed | (6.) | Waste water treatment Plant-1 | 100000 m3/day | 0 | 100000 m3/day | No change | (7.) | Wastewater Treatment Plant-2 | 80000 m3/day | 0 | 80000 m3/day | No change | (8.) | Paper/Board | 740000 TPA | 0 | 740000 TPA | No change | (9.) | Captive Chemical Hardwood Pulp Mill | 350000 BD TPA | 50000 BD TPA | 400000 BD TPA | Increase in captive pulp production | (10.) | ClO2 Plant | 10 TPD | 7 TPD | 17 TPD | New ClO2 plant of 7 TPD | (11.) | Oxygen generation Plant | 4000 Nm3/Hr | 500 Nm3/Hr | 4500 Nm3/hr | Augmentation | (12.) | White liquor Oxidation plant | 24 m3/hr | 0 | 24 m3/hr | No change | (13.) | Evaporator | 450 TPH | 100 TPH | 550 TPH | Upgradation | (14.) | Re-causticizing Plant | 450 TPD of active alkali | 150 TPD of active alkali | 600 TPD of active alkali | Augmentation | (15.) | Ozone Plant | 6 TPD | 0 | 6 TPD | No change | (16.) | Captive Bleached Chemi Thermo Mechanical Pulp | 100000 AD TPA | 50000 AD TPA | 150000 AD TPA | Increase in captive pulp production | (17.) | Captive Power Plant | 114.5 MW | 11.5 MW | 126 MW | Actual power Generation will be limited to existing consented level of 114.5 MW | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 04 Apr 2017 | (iv)Valid Upto | 30 Nov 2020 | (v)File No. | TSPCB/17042480631/2017 | (vi)Application No. | TSPCB/17042480631/2017 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 950 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 100 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 4.75 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 1 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 0 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 0 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Imported bleached hardwood pulp | 45000 | Tons per Annum | | imported | Road | | 250 | Open Market | | Copy of Linkage | (2.) | Wood | 1800000 | Tons per Annum | | Social and farm forestry | Road | | 100 | Others | Social and farm forestry | Copy of Linkage | (3.) | Imp. Soft Wood Pulp/Imported Waste Paper | 28000 | Tons per Annum | | imported | Road | | 250 | Open Market | Imported | Copy of Linkage | |
|
16. | Baseline Data | Not Applicable | |
|
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 2 To 5 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 2 To 5 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Surface | | 80000 | 2 | Copy of Permission Letter | Pipeline | | Intake Well | | G.O ms No. 71 | 03 Dec 2016 | 68220 | (2.) | Surface | | 80000 | 2 | Not Appliacble | Pipeline | | Intake Well | | G.O. Ms No. 503 | 26 Jun 1976 | 11825 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Entire plant operations | 68500 | 80000 | Biological Treatment | Others | Land irrigation/River Godavari | 2000 | 66500 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 68500 | (b)Total Discharged Water (Kilolitre per Day) | 66500 | (c)Total Reused Water (Kilolitre per Day) | 2000 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Lime sludge from lime kiln | Industrial Waste | | 33580 | Tons | 5 | Road | | Others | Sent to cement plants | (2.) | Chipper dust | Industrial Waste | | 28470 | Tons | 5 | Road | | Co-Processing | used as fuel | (3.) | Waste fibre from SFT | Industrial Waste | | 3650 | Tons | 4 | Road | | Others | sent to low grade paper board facilities | (4.) | Fly Ash and bottom ash from coal fired boilers | Fly Ash | | 350400 | Tons | 5 | Road | | Others | utilized by fly ash brick manufacturing facilities | (5.) | Waste sludge from DIP | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 12775 | Tons | 10 | Road | | Co-Processing | | (6.) | Used Oil | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 75 | Kilolitre | 10 | Road | | Authorized Recyclers | | (7.) | primary clarifier sludge | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 16425 | Tons | 10 | Road | | Others | sent to low grade paper board facilities | (8.) | Non ferrous scrap | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 13 | Tons | 10 | Road | | Authorized Recyclers | | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | SO2 | | Microgram per Meter Cube | 14 | 0 | 0 | 14 | 80 | (2.) | PM2.5 | | Microgram per Meter Cube | 41.75 | 0 | 0 | 41.75 | 60 | (3.) | NOx | | Microgram per Meter Cube | 10.5 | 0 | 0 | 10.5 | 80 | (4.) | PM10 | | Microgram per Meter Cube | 76.75 | 0 | 0 | 76.75 | 100 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | EERB (new) | Black liquor Solid | 100 | 2 | PM10 | | 10 | (2.) | EERB (new) | black liquor solid | 100 | 2 | NOx | | 27.22 | (3.) | EERB (new) | Black liquor solid | 100 | 2 | SO2 | | 46.9 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 127000 | (b)Source | Captive Power Plant | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | Not Applicable | (e)Stack Height (in m) | 65 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 0 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 241 | Total Land (ha.) | 241 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 0 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 186 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : Green Belt | 55 | Total (ha.) | 241 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 160 | Total mill area | (2.) | Township | | 81 | colony bank and other area | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Critically Polluted Area | NA | 0 | NA | (2.) | NPA | NA | 0 | NA | (3.) | ESZs | NA | 0 | NA | (4.) | ESAs | NA | 0 | NA | (5.) | Corridors | NA | 0 | NA | (6.) | Wildlife Corridors | NA | 0 | NA | (7.) | WLS | Kinnersanni Wildlife sanctuary | 7 | Southern Direction | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | Palvoncha reserved forest | 6.6 | South Western Side | (2.) | Defence Installations | | NA | 0 | NA | (3.) | Archaeological Sites | | NA | 0 | NA | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 241 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | Entire land is already acquired | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | Yes | (i)Details of Water Bodies in Core Area | Godavari River | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Kinnerasani | (ii)Direction of Water Bodies in Buffer Area | South | (iii)Distance of Water Bodies in Buffer Area | 7.3 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 0 | (c)Temporary Employment- During Construction | 200 | (d)Temporary Employment- During Operation | 200 | (e)No. of working days | 340 | (f)Total Manpower | 400 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 136 | 0 | 136 | (2.) | Percentage of Total Project Area | 35 | 0 | 35 | (3.) | Funds Allocated | 0 | 0 | 0 | (4.) | No. of Plants | 204000 | 0 | 204000 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Social | CSR for community development | (2.) | Environmental | Reduction in coal consumption and other emission | (3.) | Financial | Reduction in the usage of imported pulps, thus saving FOREX to the tune of Rs. 400 Crores per year. | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 1 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1619/SA 076 | (ii)Name of the EIA Consultant | Cholamandalam MS Risk Services Limited | (iii)Address | Cholamandalam MS Risk Services Limited, Parry House, 3rd Floor, No.2, NSC Bose Road, Parrys, Chennai-600001 | (iv)Mobile No. | 9677003778 | (v)Landline No. | 0443044562 | (vi)Email Id | bhaskarVS@cholams.murugappa.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 1 | (ix)Validity of Accreditation | 23 May 2019 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | You are requested to submit the latest certificate of compliance of earlier EC. The certificate which was submitted is of more than one year old | 24 Dec 2018 | 2. | NA | The correction have been made as per the instruction received | 15 Feb 2019 | |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | | Designation | Head Manufacturing & Projects | Name of Company (Applicant Name should not be given here) | ITC Limited ,Paper Boards and Specialty Papers Division, Unit: Bhadrachalam | Address | Divisional Headquarters: 106, Sardar Patel Road, Secunderabad- 500 003 |
|