1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Mill Expansion Plan of Unit-2, Installation of Paper Machine, Pulp Mill, Chemical Recovery Island, and Augmentation of Co-Generation Plant and utilities at TNPL, Unit 2, Mondipatti, Trichy. | (b)Name of the Company / Organisation | TAMIL NADU NEWSPRINT AND PAPERS LIMITED | (c)Registered Address | TNPL, Unit -2, Mondipatti Village, Manaparai Taluk, Tiruchirapalli District,,Tiruchirappalli,Tamil Nadu-621306 | (d)Legal Status of the Company | State PSU | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Varadarajan SJ | (b)Designation (Owner/ Partner/ CEO) | DGM | (c)Address | TNPL, UNit-2, Mondipatti Village, Manaparai Taluk,Tiruchirapalli District,,Manapparai,Tiruchirappalli,Tamil Nadu-621306 | (d)Pin code | 621306 | (e)E-mail | ims.u2@tnpl.co.in | (f)STD Code. | 432(f)Telephone No. | 4275331 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 5(i) Pulp & paper industry excluding manufacturing of paper from waste
| Minor Activity | 1(d) Thermal Power Plants
| (b)Category | A | (c)Proposal Number | IA/TN/IND/88943/2013 | (d)Master Proposal Number(Single Window) | SW/88939/2018 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 1 | (f)Project Type | Expansion |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Mondipatti Village: 1/1,2,3A & 3B, 2/1 & 2, 3/1 to | (b)Pincode | 621306 | (c)Bounded Latitudes (North) | | From | | Degree | 10.679942 | Minutes | | Second | | From | | Degree | 10.687065 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 78.430449 | Minutes | | Second | | From | | Degree | 78.452916 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 58 J/6 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 145 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 5 | (j)Seismic Zone | 2 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Tamil Nadu | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | J-11011/172/2017-IA.II(I) | (c)Date of Issue of TOR | 03 Jun 2013 | (f)Previous TOR Letter | Copy of Previous TOR letter | (b)Date of Apply of EC | 19 Dec 2018 | (c)Date of Issue of EC | 04 Apr 2019 | (d)Previous EC Letter | Copy of Previous EC letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 06 Sep 2018 | Distance of Public Hearing Venue from the Proposed Project : | 7 |
| Arulmigu Mariamman Thirukkoil Thirumana Mandapam, Manapparai, Trichy | State : | Tamil Nadu | District : | Tiruchirappalli | Tehsil : | Manapparai | Village : | Manapparai |
| 410 | (i) Issues related to disbursement of land compensation for 2015-16 green field project;
(ii) Employment opportunities to the local people;
(iii) Possible environmental impacts on local community – | District Collector | | |
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Chennai | (iii)Letter No. | F.No. EP/12.1/2016-17/SEIAA/24/TN | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Nov 9 2018 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Captive Power plant | 30 | 50 | 80 | Mega Watt(MW) | | Others | Captive | (2.) | Printing and writing paper | 0 | 165000 | 165000 | Tons per Annum(TPA) | | Road | | (3.) | Bleached chemical wood pulp | 0 | 140000 | 140000 | Tons per Annum(TPA) | | Others | Captive | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | ECF chemical wood pulp mill | 0 | 1,40,000 TPA | 1,40,000 TPA | New proposal | (2.) | Lime kiln | 0 | 250 TPD of lime | 250 TPD of lime | New proposal | (3.) | Turbo generators | 30 MW | 50 MW | 80 MW | 2 turbo generators of capacity 20 MW and 30 MW | (4.) | Power boilers | 180 TPH | 130 TPH | 310 TPH | New boiler of capacity 130 TPH | (5.) | Waste water treatment plant | 9000 KLD | 18000 KLD | 27000 KLD | Augmented from 9000 KLD to 12000 KLD and addition of a new 15000 KLD plant | (6.) | Board production | 200000 TPA | 0 | 200000 TPA | No change | (7.) | Printing and writing paper machine | 0 | 1,65,000 TPA | 1,65,000 TPA | New proposal | (8.) | Chemical recovery plant | 0 | 1100 TPD of black liquor solids | 1100 TPD of black liquor solids | New proposal | (9.) | Mill area | 122.76 Ha | 122.76 Ha | 122.76 Ha | No change | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 21 May 2018 | (iv)Valid Upto | 31 Mar 2019 | (v)File No. | T1/TNPCB/F.0142TRY/RL/TRY/W/2018 | (vi)Application No. | 1808112205227 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 2520 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 2520 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 6.3 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 200 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 570000 | (b)Existing quantity of raw material/fuel | 0 | (c)Total quantity of raw material/fuel | 570000 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Wood | 570000 | Tons per Annum | | Farm forestry | Road | | 400 | Others | Farm forestry | Copy of Linkage | (2.) | Coal | 310000 | Tons per Annum | | Imported from Indonesia | Road | | 190 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 08 Jun 2017 To 06 Sep 2017 | (b)Season | Post-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | NOx | | Micro Gram per Meter Cube | 23.2 | 12.0 | 22.6 | 80 | (2.) | Others | Ozone | Micro Gram per Meter Cube | 35.3 | 14.6 | 32.3 | 180 | (3.) | PM10 | | Micro Gram per Meter Cube | 68.0 | 49.3 | 67.3 | 100 | (4.) | SO2 | | Micro Gram per Meter Cube | 8.0 | 3.5 | 7.7 | 80 | (5.) | PM2.5 | | Micro Gram per Meter Cube | 33.7 | 22.1 | 33 | 60 | |
14.2. No. of Ground Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | pH | | | NA | | 8.2 | 7.8 | 7.5 | 8.5 | (2.) | TSS | | | mg/l | | 0 | 0 | 0 | 0 | (3.) | Total Hardness | | | mg/l | | 1368 | 154 | 200 | 600 | (4.) | Fluoride | | | mg/l | | 0.24 | 0.21 | 1 | 1.5 | (5.) | Heavy Metals | | Chromium | mg/l | | 0 | 0 | 0.05 | 0.05 | (6.) | Others | Sulphates | | mg/l | | 294.7 | 5 | 200 | 400 | (7.) | Chlorides | | | mg/l | | 1050 | 93 | 250 | 1000 | (8.) | TDS | | | mg/l | | 2716 | 324 | 500 | 2000 | |
14.3. No. of Surface Water monitoring locations : 6 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | mg/l | | 7.6 | 6.6 | E | (2.) | DO | | mg/l | | 0 | 0 | E | (3.) | BOD | | mg/l | | 0 | 0 | E | (4.) | COD | | mg/l | | 0 | 0 | E | (5.) | Others | Iron | mg/l | | 3.1 | 1.5 | E | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Night) | A-weighted decibels(dB(A)) | 47 | 39.5 | 45 | (2.) | Leq(Day) | A-weighted decibels(dB(A)) | 59.2 | 50.0 | 55 | |
14.5. No. of Soil Sample Monitored locations : 8 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | Others | Not Applicable | 8.1 | 7.3 | (2.) | N(Nitrogen) | Milligram per Kilogram | | 440 | 154 | (3.) | P(Phosphorus) | Milligram per Kilogram | | 314 | 118 | (4.) | K(Potassium) | Milligram per Kilogram | | 954 | 210 | (5.) | Electric Conductivity | Millisiemens per Centimetre | | 0.330 | 0.143 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 12.6 To 8 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 4 To 9 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Surface | | 20700 | 30 | Copy of Permission Letter | Pipeline | | Intake Well | | G.O. (Ms) No. 18 | 22 Jan 2015 | 23100 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Pulp mill and recovery | 10120 | 15000 | Extended Aeration | Others | Land irrigation | 620 | 9500 | (2.) | Paper Machine | 7880 | 12000 | Extended aeration | Others | Land irrigation | 1380 | 6500 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 18000 | (b)Total Discharged Water (Kilolitre per Day) | 16000 | (c)Total Reused Water (Kilolitre per Day) | 2000 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Secondary clarifier sludge | Industrial Waste | | 3400 | Tons | 10 | Road | | Others | Used as manure | (2.) | Primary clarifier sludge | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 20400 | Tons | 100 | Road | | Others | sent to cardboard manufacturers | (3.) | Boiler Ash | Fly Ash | | 40800 | Tons | 90 | Road | | Others | Sent to cement mill | (4.) | Used oil | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 20.4 | Kilolitre | 0 | Road | | Authorized Recyclers | | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 73.1 | 1 | 0.42 | 73.52 | 100 | (2.) | PM2.5 | | Microgram per Meter Cube | 35.1 | 1 | 0.252 | 35.352 | 60 | (3.) | SO2 | | Microgram per Meter Cube | 7.8 | 1 | 10.64 | 18.44 | 80 | (4.) | NOx | | Microgram per Meter Cube | 22.4 | 1 | 4.36 | 26.76 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | AFBC Boiler | Coal | 100 | 2.5 | NOx | | 0.588 | (2.) | AFBC Boiler | Coal | 100 | 2.5 | PM10 | | 0.14 | (3.) | Lime Kiln | Lime sludge and furnace oil | 30.4 | 1.3 | SO2 | | 0.132 | (4.) | AFBC Boiler | Coal | 100 | 2.5 | SO2 | | 0.588 | (5.) | Chemical recovery boiler | Black liquor | 90 | 3 | PM10 | | 0.224 | (6.) | Chemical recovery boiler | Black liquor | 90 | 3 | SO2 | | 1.617 | (7.) | Chemical recovery boiler | Black liquor | 90 | 3 | NOx | | 0.5964 | (8.) | Lime Kiln | Lime sludge and furnace oil | 30.4 | 1.3 | PM10 | | 0.053 | (9.) | Lime Kiln | Lime sludge and furnace oil | 30.4 | 1.3 | NOx | | 0.5432 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 80000 | (b)Source | Captive Power Plant | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | Not applicable | (e)Stack Height (in m) | 0 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 0 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 353.88 | Total Land (ha.) | 353.88 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 0 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 353.88 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : 0 | 0 | Total (ha.) | 353.88 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 9.72 | Plant and building | (2.) | Green belt | | 12.95 | | (3.) | Others | Storage area, roads and drains | 2.705 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | ESAs | Not Applicable | 0 | Not Applicable | (2.) | Wildlife Corridors | Not Applicable | 0 | Not Applicable | (3.) | Critically Polluted Area | Not Applicable | 0 | Not Applicable | (4.) | WLS | Not Applicable | 0 | Not Applicable | (5.) | NPA | Not Applicable | 0 | Not Applicable | (6.) | ESZs | Not Applicable | 0 | Not Applicable | (7.) | Corridors | Not Applicable | 0 | Not Applicable | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | Viramalai Reserved Forest | 5.2 | On the western direction | (2.) | Defence Installations | | Not Applicable | 0 | Not applicable | (3.) | Archaeological Sites | | Not applicable | 0 | Not applicable | (4.) | Others | River | Ariyar River | 6.7 | On the southern direction | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 353.88 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | Not Applicable | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Ariyar River | (ii)Direction of Water Bodies in Buffer Area | South | (iii)Distance of Water Bodies in Buffer Area | 6.7 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 400 | (c)Temporary Employment- During Construction | 1000 | (d)Temporary Employment- During Operation | 0 | (e)No. of working days | 365 | (f)Total Manpower | 1400 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 650 | 32 | 682 | (2.) | Percentage of Total Project Area | 74 | 3 | 77 | (3.) | No. of Plants | 600000 | 28000 | 628000 | (4.) | Funds Allocated | 180.57 | 8.43 | 189 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Social | The capital CER budget of Rs. 6.3 Crores has been embarked for the local community development. The project will create direct employment to about 400 persons. In addition it would generate indirect employment to about 1000 persons. | (2.) | Financial | The project is likely to generate income to the state by way of Goods and Service Tax (GST) to the tune of Rs 20 crores per annum and by way of income tax to the tune of Rs. 100 crores per annum. | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 1 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1619/SA 076 | (ii)Name of the EIA Consultant | Cholamandalam MS Risk Services Limited | (iii)Address | Parry House, 3rd Floor, No.2, NSC Bose Road, Chennai- 600001 | (iv)Mobile No. | 9677003778 | (v)Landline No. | 9144304456 | (vi)Email Id | bhaskarvs@cholams.murugappa.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 1 | (ix)Validity of Accreditation | 23 May 2019 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought : NIL |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Varadarajan SJ | Designation | DGM | Name of Company (Applicant Name should not be given here) | TAMIL NADU NEWSPRINT AND PAPERS LIMITED | Address | TNPL, Unit -2, Mondipatti Village, Manaparai Taluk, Tiruchirapalli District |
|