Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Nebula Health Care
(b)Name of the Company / Organisation NEBULA HEALTH CARE
(c)Registered Address Survey no (old) 60&61(revise)76&77,Opp suzuki synthetic,Chhatral-Kadi Road,Village Ankhol,taluka Kadi,Dist:Mehsana.,,Mahesana,Gujarat-382721
(d)Legal Status of the Company Others
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant ketan M Dhamsaniya
(b)Designation (Owner/ Partner/ CEO) partner
(c)Address SF/19-20,Milenium Plaza,opp swaminarayan temple premchandnagar road vastrapur ahmedabad,,Ahmedabad City,Ahmedabad,Gujarat-380015
(d)Pin code 380015
(e)E-mail nebulahealth@gmail.com
(f)STD Code. 79(f)Telephone No. 40040289
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
Minor Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
(b)Category A
(c)Proposal Number IA/GJ/IND2/88808/2017
(d)Master Proposal Number(Single Window) SW/88806/2018
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. (old) 60 & 61/(revised) 76 & 77
(b)Pincode 382715
(c)Bounded Latitudes (North)
From
Degree 23.27
Minutes
Second
From
Degree 23.28
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 72.40
Minutes
Second
From
Degree 72.41
Minutes
Second
(e)Survey of India Topo Sheet No. F43A7
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 70
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 30
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number IA/GJ/IND2/63782/2017
(c)Date of Issue of TOR 16 Aug 2017
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 04 Sep 2010
(c)Date of Issue of EC 30 Jun 2020
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :08 May 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :12 Jun 2018
Distance of Public Hearing Venue from the Proposed Project :7
Champaben Ratilal Patel Town Hall
State :Gujarat
District :Mahesana
Tehsil :Kadi
Village :Kadi
41Greenbelt, pollution management, CSR and women empowerment classesOthersResident Additional Collector and Additional District Magistrate, Mehsana
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Bhopal
(iii)Letter No. 5-27/2011(ENV)/561
(iv)Status of Compliance Partially Complied
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Jun 13 2018 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Bulk drugs240482722OthersMT/monthRoad
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)D.G. Set25 kVA125 kVA2 nos
(2.)Spin flash dryer150 lit/hr150 lit/hr2 nos
(3.)Fluid bed dryer120 Kgs0120 Kgs
(4.)Rotary vaccum dryer600 Liter0600 Liter
(5.)Centrifuge36''036''2 nos
(6.)SS reactor5 KL & 3 KL (2 nos)3 KL (2 nos)5 KL & 3 KL (4 nos)
(7.)Boiler0.5 TPH1 and 2 TPH3 nos
(8.)Thermic Fluid Heater6 lakhs Kcal/hr10 lakhs Kcal/hr2 nos
(9.)Spray dryer150 lit/hr150 lit/hr2 nos
(10.)Cooling tower50 TR100 TR2 nos
(11.)Glass lined reactor3 KL5 KL2 nos
(12.)Blinder600 Liter0600 Liter2 nos
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 07 Jan 2013
(iv)Valid Upto 26 Dec 2018
(v)File No. AWH-51495
(vi)Application No. 63863
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 3.50
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.5
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.175
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.3
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 400
(b)Existing quantity of raw material/fuel 100
(c)Total quantity of raw material/fuel 500
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)10830Tons per Annumopen marketRoad50 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Oct 2017 To 31 Dec 2017
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube78.350.470.96100
(2.)PM2.5Micro Gram per Meter Cube452540.1960
(3.)SO2Micro Gram per Meter Cube24.111.520.1880
(4.)NOxMicro Gram per Meter Cube26.515.223.9880
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TSSmg/l10.48.300
(2.)Fluoridemg/l0.70.511.5
(3.)Chloridesmg/l5104022501000
(4.)pHNA7.67.38.58.5
(5.)Total Hardnessmg/l337218300600
(6.)TDSmg/l11759965002000
    14.3.     No. of Surface Water monitoring locations : 4
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHmg/l7.647.35A
(2.)DOmg/l5.34.1B
(3.)BODmg/l16.58.1D
(4.)CODmg/l28.517.5D
    14.4.     No. of Ambient Noise monitoring locations : 9
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))58.350.975
(2.)Leq(Night)A-weighted decibels(dB(A))52.240.170
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pHOtherspH unit7.67.3
(2.)Electric ConductivityOthersdS/m2.21.3
(3.)N(Nitrogen)Milligram per Kilogram20830
(4.)P(Phosphorus)Milligram per Kilogram12524
(5.)K(Potassium)Milligram per Kilogram219113
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 25 To 40
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 15 To 30
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater73.60Copy of Permission LetterPipelineTube Well21-4/3626/GJ/IND/201816 Apr 201874
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Utilities - water treatment, boiler, cooling710ROReuse within the Plant & Recycling7
(2.)Process, washing, lab, scrubber1520MEEReuse within the Plant & Recycling15
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 22
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 22
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Distillation residueHazardous Waste (as per Hazardous and Other Waste Management rules 2016)60Tons145RoadOthersIncineration
(2.)ETP wasteHazardous Waste (as per Hazardous and Other Waste Management rules 2016)24Tons110RoadTreatment, Storage and Disposal Facility(TSDF)
(3.)MEE saltHazardous Waste (as per Hazardous and Other Waste Management rules 2016)75Tons110RoadTreatment, Storage and Disposal Facility(TSDF)
(4.)Spent carbonHazardous Waste (as per Hazardous and Other Waste Management rules 2016)30Tons145RoadOthersIncineration
(5.)Used lubricating oilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.200Kilolitre25RoadAuthorized Recyclers
(6.)Discarded linersHazardous Waste (as per Hazardous and Other Waste Management rules 2016)10Tons25RoadAuthorized Recyclers
(7.)Discarded containersHazardous Waste (as per Hazardous and Other Waste Management rules 2016)15Tons25RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)SO2Microgram per Meter Cube34.912.44937.34980
(2.)PM10Microgram per Meter Cube64.514.56969.069100
(3.)NOxMicrogram per Meter Cube19.811.3121.1180
(4.)PM2.5Microgram per Meter Cube36.914.56941.46960
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)TFHAgro waste/briquettes300.5OthersPM, SO2, NOx0
(2.)DG setHSD110.3OthersPM, SO2, NOx0
(3.)Existing Boiler (1 no), TFH (1 no) & DG set (1 no)Agro waste/ briquettes and HSD150.3OthersPM, SO2, NOx0
(4.)Boiler (1+2 TPH)Agro waste/briquettes300.5OthersPM, SO2, NOx0
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 250
(b)Source UGVCL
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 125
(e)Stack Height (in m) 11
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 2.2050
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 2.2050
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 23880
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 1137
(e)Settlements (ha.) 2184
(f)Industrial (ha.) 1924
(g)Forest (ha.) 0
(h)Mangroves (ha.) 1848
(i)Marine Area (ha.) 0
(j)Others (ha.) : Roads 512
    Total (ha.) 31485
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Green belt0.7277
(2.)Main Plant0.2500
(3.)Built Up Area0.2570
(4.)OthersParking, roads and open area0.9703Parking, roads and open area
Total (ha.) 2.205
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaVatva44None within 10 km
(2.)NPABlackbuck National Park Velavadar158None within 10 km
(3.)ESAsMount Abu138None within 10 km
(4.)ESZsThol Wildlife Sanctuary18None within 10 km
(5.)WLSNal Sarovar Birds Sanctuary65None within 10 km
(6.)CorridorsNone within 10 km00None within 10 km
(7.)Wildlife CorridorsNone within 10 km00None within 10 km
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestPolo Forest115None within 10 km
(2.)Archaeological SitesAdalaj Stepwell25None within 10 km
(3.)Defence InstallationsNone within 10 km00None within 10 km
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) Not Applicable
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 2.2050
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired NA
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Narmada canal and Budasan lake
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Piyaj and Borisana lake
(ii)Direction of Water Bodies in Buffer Area East
(iii)Distance of Water Bodies in Buffer Area 7
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 18
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 26
(f)Total Manpower 18
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt310041777277
(2.)Percentage of Total Project Area141933
(3.)Funds Allocated123
(4.)No. of Plants80500580
    33.       Project Benefits
S. No. Type of Project BenefitsDetails of Project Benefits
NIL
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA 0084
(ii)Name of the EIA Consultant San Envirotech Pvt. Ltd., Ahmedabad
(iii)Address 401/402/423/424/324, Medicine Market, Opp. Shefali Centre, Paldi cross Road, Ahmedabad
(iv)Mobile No. 9825007201
(v)Landline No. 0792658307
(vi)Email Id mahendra.sepl@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 23 Dec 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NA- No EIA/EMP uploaded against column 39(a) of Form-2. - No Certified Compliance Report submitted against column 9(v) of Form-2. - No entries in column 6 of Form-2. Please do the needful to take the proposal forward. 27 Dec 2018
2.NAThe correction have been made as per the instruction received 03 Jan 2019
3.NA- Please confirm whether all the existing (240 TPM) and proposed products (482 TPM) are synthetic organic chemicals, and thus requiring prior EC. - Please fill up/provide the relevant details in column 6 of Form-2. - As per the ToR, permission for ground water withdrawal of 74 cum/day was to be submitted along with the EC proposal. - Whether the ATR submitted to the Regional Office on 31/12/2018 has been accepted by them. 13 Jan 2019
4.NAThe correction have been made as per the instruction received 22 Jan 2019
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterReply of ADS along with water permission from competent authority of GWSSB is attached. 05 Jun 2020
2.NAPlease refer your reply dated 12th November, 2019, wherein the document at Annexure -1 is not very clear about authority of giving permission for water supply/abstraction from canal. Now, I am directed to ask the project proponent to seek endorsement of concerned State authorities or District Collector on the permission given by Gram Panchayat regarding Surface water abstraction from canal stating the authority of Gram Panchayat for such permission. You are therefore requested to submit the above information at earliest so that your proposal for Environmental Clearance can be processed. 20 Feb 2020
3.NAPlease refer your proposal for environmental clearance to the project for expansion of bulk drugs manufacturing unit from 240 TPM to 717 TPM by M/s Nebula Health Care in an area of 22050 sqm located at Survey No. (Old) 60 & 61/ (Revised) 76 & 77, Opp. Suzuki Synthetic, Chattral-Kadi Road, Village Ankhol, Taluka Kadi, District Mehsana (Gujarat). The proposal was recommended by the EAC in its meeting held on 30-31 May, 2019 for grant of EC. Please refer your reply dated 12th November, 2019, wherein the document at Annexure -1 is not very clear about authority of giving permission for water supply/abstraction from canal. Now, I am directed to ask the project proponent to seek endorsement of concerned State authorities or District Collector on the permission given by Gram Panchayat regarding Surface water abstraction from canal stating the authority of Gram Panchayat for such permission. You are therefore requested to submit the above information at earliest so that your proposal for Environmental Clearance can be processed. 20 Feb 2020
4.NAPlease refer your proposal for environmental clearance to the project for expansion of bulk drugs manufacturing unit from 240 TPM to 717 TPM by M/s Nebula Health Care in an area of 22050 sqm located at Survey No. (Old) 60 & 61/ (Revised) 76 & 77, Opp. Suzuki Synthetic, Chattral-Kadi Road, Village Ankhol, Taluka Kadi, District Mehsana (Gujarat). The proposal was recommended by the EAC in its meeting held on 30-31 May, 2019 for grant of EC. Please refer your reply dated 12th November, 2019, wherein the document at Annexure -1 is not very clear about authority of giving permission for water supply/abstraction from canal. Now, I am directed to ask the project proponent to seek endorsement of concerned State authorities or District Collector on the permission given by Gram Panchayat regarding Surface water abstraction from canal stating the authority of Gram Panchayat for such permission. You are therefore requested to submit the above information at earliest so that your proposal for Environmental Clearance can be processed. 20 Feb 2020
5. ADS Reply LetterNA 02 May 2019
6.NAThe EAC, after deliberations and especially in view of the project site/area identified as over-exploited zone, insisted for not using the ground water any more, but to explore other resources to meet the projected fresh water requirement of 73.6 cum/day. The Committee also opined to consider the proposal, in case permission is granted by CGWA to abstract ground water, as requested on 16th April, 2018. The proposal was deferred for the needful. 22 Apr 2019
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of Applicantketan M Dhamsaniya
Designationpartner
Name of Company (Applicant Name should not be given here)NEBULA HEALTH CARE
AddressSurvey no (old) 60&61(revise)76&77,Opp suzuki synthetic,Chhatral-Kadi Road,Village Ankhol,taluka Kadi,Dist:Mehsana.