Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) PINE LAMINATES PVT. LTD.
(b)Name of the Company / Organisation PINE LAMINATES PVT LTD
(c)Registered Address A-526, RIICO Industrial Area, Chopanki, Bhiwadi, Tehsil Tijara, District Alwar, Rajasthan,,Alwar,Rajasthan-301019
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Manoj Agarwal
(b)Designation (Owner/ Partner/ CEO) Director
(c)Address A-526, RIICO Industrial Area, Chopanki, Bhiwadi, Tehsil Tijara, District Alwar, Rajasthan.,,Tijara,Alwar,Rajasthan-301019
(d)Pin code 301019
(e)E-mail pinelaminates2018@gmail.com
(f)STD Code. 141(f)Telephone No. 4029115
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
Minor Activity
(b)Category A
(c)Proposal Number IA/RJ/IND2/74569/2018
(d)Master Proposal Number(Single Window) SW/88765/2018
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. A-526
(b)Pincode 301019
(c)Bounded Latitudes (North)
From
Degree 2892806
Minutes
Second
From
Degree 28929.68
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 765237.23
Minutes
Second
From
Degree 765240.23
Minutes
Second
(e)Survey of India Topo Sheet No. 53 D/15
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 0.26
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0.28
(j)Seismic Zone 4
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Rajasthan
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)RajasthanAlwarTijara
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/143/2018-IA-II(I)
(b)Date of Apply of TOR 14 Apr 2018
(c)Date of Issue of TOR / Standard ToR 24 May 2018
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason PROJECT LIES IN NOTIFIES INDUSTRIAL AREA
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)CONDENSER11
(2.)MIXING TANK11
(3.)REACTOR11
(4.)EVAPORATOR11
(5.)ABS COLUMN11
(6.)ABS COLUMN11
(7.)ABS COLUMN11
(8.)COOLING TOWER11
(9.)BLOWER11
(10.)STORAGE TANK11
(11.)STEAM SEPARATOR11
(12.)PROCESS WATER TANK11
(13.)HEAT EXCHANGER11
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)FORMALDEHYE80OthersTPDRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 09 Feb 2018
(iv)Valid Upto 03 Feb 2021
(v)File No. nil
(vi)Application No. nil
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 2.5
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.01
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.05
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.003
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? Yes
d)Inter-State boundaries and international boundaries Yes
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 40
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 40
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Methanol40OthersTPDLocal marketRoad10 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2018 To 28 May 2018
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube44.8624.3343.5360
(2.)NOxMicro Gram per Meter Cube21.9010.8421.8080
(3.)SO2Micro Gram per Meter Cube10.845.9810.7680
(4.)OthersCOMili Gram per Meter Cube0.850.180.854
(5.)PM10Micro Gram per Meter Cube75.6248.4774.99100
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA8.197.858.58.5
(2.)TSSmg/l0000
(3.)TDSmg/l14324645002000
(4.)Total Hardnessmg/l588248200600
(5.)Chloridesmg/l2261082501000
(6.)Fluoridemg/l1.20.611.5
(7.)Heavy MetalsIRONmg/l0.360.10.30.3
(8.)OthersCALCIUMmg/l129.660.875200
    14.3.     No. of Surface Water monitoring locations : 2
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DONA00C
(2.)pHNA00C
(3.)BODmg/l00C
(4.)CODmg/l00C
(5.)OthersnilNA00C
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))53.447.275
(2.)Leq(Night)A-weighted decibels(dB(A))39.135.170
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Milligram per Kilogram165139
(2.)Electric ConductivityOthersµS/cm561215
(3.)P(Phosphorus)Milligram per Kilogram76.2029.7
(4.)pHOthersna8.217.45
(5.)K(Potassium)Milligram per Kilogram176126
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 40
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 30 To 60
(c)Whether Ground Water Intersection will be there ? NA
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater600Copy of Permission LetterPipelineTube Wellnil28 Nov 201880
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)domestic sewage1100riicoOtherswill be managed by RIICO01
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 1
(b)Total Discharged Water (Kilolitre per Day) 1
(c)Total Reused Water (Kilolitre per Day) 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)used oilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)5Kilolitre10RoadAuthorized Recyclers
(2.)packing materialOthersdiscarded carboys/ drums5Tons10RoadAuthorized Recyclers
(3.)municipal solid wasteMunicipal Solid Waste10Tons10RoadSanitary Landfills
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)Others(Specify)COMicrogram per Meter Cube850135512042000
(2.)PM10Microgram per Meter Cube75.6210.51476.134100
(3.)PM2.5NA00000
(4.)SO2NA00000
(5.)NOxMicrogram per Meter Cube21.9011.1323.0380
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG SETHSD3.50.10PM100.514
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 312.5
(b)Source JVVNL BHIWADI
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 250 KVA DG (1 NO)
(e)Stack Height (in m) 3.5
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0.19
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 0.19
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 0.19
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : nil 0
    Total (ha.) 0.19
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Green belt0.064
(2.)Othersopen & paved0.043
(3.)Main Plant0.088
Total (ha.) 0.195
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted Areanone00
(2.)WLSnone00
(3.)ESAsnone00
(4.)ESZsnone00
(5.)Corridorsnone00
(6.)Wildlife Corridorsnone00
(7.)NPAnone00
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestBANWAN PF0.60.6 KM WEST
(2.)Defence InstallationsNONE00
(3.)OthersWATER BODYINDORI NALA5.7NE
(4.)Archaeological SitesNONE00
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0.19
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area INDORI NALA
(ii)Direction of Water Bodies in Buffer Area North East
(iii)Distance of Water Bodies in Buffer Area 5.7
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 1
(b)Permanent Employment-During Operation 8
(c)Temporary Employment- During Construction 2
(d)Temporary Employment- During Operation 1
(e)No. of working days 320
(f)Total Manpower 12
32.
Green Belt in Ha:
(a)Total Area of Green Belt 0.064
(b)Percentage of Total Project Area 33.68
(c)No. of Plants to be Planted 26
(d)Funds Allocated for Plantation 25000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialThe proposed project of “synthetic organic chemicals category” is a purely backward integration process for the project proponent company. This unit will result in improvement of transport infrastructure by producing required raw material close to the point of consumption. This plant will as well as provide direct and indirect employment in the neighborhood, thus contributing to the socio-economic development in the area. The people residing in the nearby areas will be benefited directly and ind
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. Vison Labs
(ii)Name of the EIA Consultant Vison Labs
(iii)Address H.No.16-11-23/37/A, Flat No. 205, 2nd Floor, Opp. R.T.A. Office, Moosarambagh, Malakpet, Hyderabad, Telangana 500036
(iv)Mobile No. 9782074776
(v)Landline No. 0141402911
(vi)Email Id gaurangenviro@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 31 Dec 2021
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAPlease submit certificate of accreditation for the EIA consultant. 22 Dec 2018
2.NAThe correction have been made as per the instruction received 03 Jan 2019
3.NAPlease inform/clarify/submit the following:- - Applicability of general conditions along with supporting/certified documents. - Copy of the document referred to in column 9.1(iii)&(iv) of Form-2. - Copy of the permission letter for ground water withdrawal of 60 cum/day not submitted against column 15 of Form-2. 13 Jan 2019
4.NAThe correction have been made as per the instruction received 21 Jan 2019
5.NAPlease refer our earlier observations. Following are yet to be submitted and/or clarified:- - Certificate of Accreditation for the engaged EIA Consultant. - Column 15 of Form-2 shows date of issue of permission letter for ground water withdrawal as 28/11/2018. - Column 9.1 (iii) & (iv) of Form-2 still reflects the entries as 9/2/2018 & 3/2/2021. In case of CTO not applicable, the same needs to be clarified. 27 Jan 2019
6.NAThe correction have been made as per the instruction received 12 Feb 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantManoj Agarwal
DesignationDirector
Name of Company (Applicant Name should not be given here)PINE LAMINATES PVT LTD
AddressA-526, RIICO Industrial Area, Chopanki, Bhiwadi, Tehsil Tijara, District Alwar, Rajasthan
Print