Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Expansion from 0.135 MTPA steel to 0.33 MTPA cold drawn and long products by M/s Maithan Steel & Power Ltd
(b)Name of the Company / Organisation MAITHAN STEEL AND POWER LTD
(c)Registered Address 9, AJC Bose Road, Ideal Centre, 6th floor, Kolkata,,Barddhaman,West Bengal-700017
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Madhur Agarwalla
(b)Designation (Owner/ Partner/ CEO) Director
(c)Address 9, AJC Bose Road, Ideal Centre, 6th Floor, Kolkata,,Kanksa,Barddhaman,West Bengal-700017
(d)Pin code 700017
(e)E-mail madhur@maithangroup.com
(f)STD Code. 33(f)Telephone No. 39877200
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity3(a) Metallurgical industries (ferrous & non ferrous)
Minor Activity
(b)Category A
(c)Proposal Number IA/WB/IND/88715/2017
(d)Master Proposal Number(Single Window) SW/88709/2018
(e)EAC concerned (for category A Projects only) Industrial Projects - 1
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 1016,1010,1011,1018,1019,1024,1041
(b)Pincode 713357
(c)Bounded Latitudes (North)
From
Degree 234626.30
Minutes
Second
From
Degree 234639.90
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 865200.12
Minutes
Second
From
Degree 865200.26
Minutes
Second
(e)Survey of India Topo Sheet No. F45C14
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 255
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 3.8
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project West Bengal
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)West BengalBurdwanKanksaNakrajoria
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-11011/679/2008-IA II(I)
(c)Date of Issue of TOR 16 Jan 2018
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 24 Dec 2018
(c)Date of Issue of EC 16 Apr 2019
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :12 Jul 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :17 Aug 2018
Distance of Public Hearing Venue from the Proposed Project :2.5
Conference hall of Panorma Country Club and resorts near Chowinghee More
State :West Bengal
District :Burdwan
Tehsil :Kanksa
Village :Nakrajoria
88Concern about pollution load, scarcity of electricity for general public, health deterioration, solid waste generation, source of water for expansion and its impact on water regime, peripheral developOthersDM&DC
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Bhubaneswar
(iii)Letter No. 102-309/08/EPE/3618
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Sep 17 2018 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Steel135000195000330000Tons per Annum(TPA)Road,Rail
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Induction Furnace3 X 15 T5 X 15 T8 X 15 T
(2.)Rolling Mill90,000 TPA2,07,000 TPA2,97,000 TPA
(3.)Cold drawn wires033,000 TPA33,000 TPA
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 30 Jul 2018
(iv)Valid Upto 30 Jun 2023
(v)File No. CO110133
(vi)Application No. CO110133
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 136.50
(b) Funds Allocated for Environment Management (Capital) (in Crores) 5.5
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 1.30
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.6
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 435000
(b)Existing quantity of raw material/fuel 0
(c)Total quantity of raw material/fuel 435000
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Sponge Iron370000Tons per AnnumPuruliaRoad40 OthersTax invoiceCopy of Linkage
(2.)Pig Iron45000Tons per AnnumDurgapurRoad58 OthersinvoiceCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Dec 2017 To 28 Feb 2018
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube93.666.692.1100
(2.)NOxMicro Gram per Meter Cube27.614.42680
(3.)OthersCOMicro Gram per Meter Cube470323441.52000
(4.)PM2.5Micro Gram per Meter Cube56.431.353.160
(5.)SO2Micro Gram per Meter Cube22.812.121.580
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.57.16.58.5
(2.)TSSmg/l0000
(3.)Total Hardnessmg/l156116200600
(4.)Chloridesmg/l51.646.42501000
(5.)Heavy MetalsFemg/l0.110.0511
(6.)Fluoridemg/l0.480.3511.5
(7.)TDSmg/l3643045002000
    14.3.     No. of Surface Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.87.2C
(2.)OthersTDSmg/l262214.02C
(3.)DOmg/l6.65.2C
(4.)BODmg/l7.24.8C
(5.)CODmg/l40.326.9C
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))50.242.345
(2.)Leq(Day)A-weighted decibels(dB(A))62.849.555
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)P(Phosphorus)Percent0.180.013
(2.)pHOthersNA7.97.2
(3.)N(Nitrogen)Percent0.0250.016
(4.)K(Potassium)Percent0.0210.012
(5.)Electric ConductivityMillisiemens per Centimetre330294
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 17
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 2 To 5
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface12500Copy of Permission LetterPipelineIntake WellMSPL-U2/SMS/17-18/29003 Apr 20181250
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic7280STPGreen Belt Renewal Plant72
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 72
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 72
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)IF slagIndustrial Waste45500Tons6RoadAuthorized Recyclers
(2.)IF dustIndustrial Waste5000Tons1500RailAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube53.16.150.4153.560
(2.)NOxMicrogram per Meter Cube00000
(3.)PM10Microgram per Meter Cube92.13.660.5492.6100
(4.)SO2Microgram per Meter Cube00000
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)IFElectricity301.4PM101.15
(2.)IFElectricity301.4PM101.15
(3.)IFElectricity301.4PM101.15
(4.)IFElectricity301.4PM101.15
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 35
(b)Source DVC
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 2 x 500 KVA
(e)Stack Height (in m) 8
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 10.27
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 10.27
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 14190
(b)Waste/Barren Land (ha.) 2300
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 4710
(e)Settlements (ha.) 7060
(f)Industrial (ha.) 2640
(g)Forest (ha.) 1000
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Road, railway 930
    Total (ha.) 32830
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Green belt3.43
(2.)Water Reservoir0.61
(3.)Main Plant5.1
(4.)OthersVacant space1.13
Total (ha.) 10.27
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNA0Not found
(2.)WLSNA0Not found
(3.)NPANA0Not found
(4.)CorridorsNA0Not found
(5.)ESAsNA0Not found
(6.)ESZsNA0Not found
(7.)Wildlife CorridorsNA0Not found
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Defence InstallationsNA0Not Found
(2.)ForestNA0Not Found
(3.)Archaeological SitesNA0Not Found
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 10.27
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Yet To Start
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Barakar river
(ii)Direction of Water Bodies in Buffer Area North
(iii)Distance of Water Bodies in Buffer Area 4.13
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 120
(b)Permanent Employment-During Operation 80
(c)Temporary Employment- During Construction 170
(d)Temporary Employment- During Operation 180
(e)No. of working days 330
(f)Total Manpower 550
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt2.860.553.41
(2.)Percentage of Total Project Area0.280.0530.333
(3.)No. of Plants43058255130
(4.)Funds Allocated286000126000412000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)FinancialRevenue generation
(2.)EnvironmentalGreen belt plantation
(3.)SocialPeripheral development, Employment opportunities
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 1
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. 77
(ii)Name of the EIA Consultant Global Tech Enviro Experts Pvt Ltd
(iii)Address C-23, BJB Nagar Bhubaneswar
(iv)Mobile No. 9437033487
(v)Landline No. 0674233685
(vi)Email Id global1experts@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 1
(ix)Validity of Accreditation 23 Nov 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAMay kindly peruse the Form-2. The following observations were made 1. The details regarding ToR and MoEFCC file No. is mentioned as Nil 2. The EIA/EMP is not able to view In light of the above, it is difficult to verify the project details regarding mandatory requirements. Therefore, you are requested to make application properly 23 Dec 2018
2.NAThe correction have been made as per the instruction received 24 Dec 2018
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantMadhur Agarwalla
DesignationDirector
Name of Company (Applicant Name should not be given here)MAITHAN STEEL AND POWER LTD
Address9, AJC Bose Road, Ideal Centre, 6th floor, Kolkata
Print