Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) EXPANSION OF ISOLATED STORAGE TERMINAL WITH ADDITIONAL STORAGE TANKS FOR 60,000 KL HSD; 9,000 KL MS & 140 KL BIODEISEL
(b)Name of the Company / Organisation INDIAN OIL CORPORATION LIMITED MARKETING DIVISION
(c)Registered Address Indian oil Bhavan, G-9, Ali Yavar Jung Marg, Bandra (East), Mumbai-400051,,New Delhi,Delhi-400051
(d)Legal Status of the Company Central PSU
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Harshverdhan Gupta
(b)Designation (Owner/ Partner/ CEO) CTM
(c)Address Rewari Terminal, Vill. Karanwas Bawal Road, Rewari-123401,,Rewari,Rewari,Haryana-123401
(d)Pin code 123401
(e)E-mail hwardhan@indianoil.in
(f)STD Code. 11(f)Telephone No. 74269534
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity6(b)Isolated storage & handling of hazardous chemicals (As per threshold planning
Minor Activity6(b)Isolated storage & handling of hazardous chemicals (As per threshold planning
(b)Category B1
   Reason for Applying at Ministry SEIAA
(c)Proposal Number IA/HR/IND2/88639/2017
(d)Master Proposal Number(Single Window) SW/88634/2018
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 20,23,15,72
(b)Pincode 123401
(c)Bounded Latitudes (North)
From
Degree 3113731
Minutes
Second
From
Degree 541318
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 657304
Minutes
Second
From
Degree 8502902
Minutes
Second
(e)Survey of India Topo Sheet No. H43W12
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 259
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0
(j)Seismic Zone 4
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Haryana
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number 313091217REWCTO4329070
(b)Date of Apply of TOR 20 Sep 2017
(c)Date of Issue of TOR / Standard ToR 14 Dec 2017
(d)Date of Apply of EC 20 Sep 2017
(e)Date of Issue of EC 14 Dec 2017
(f)Previous TOR Letter Copy of Previous TOR letter
(g)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :24 Jul 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :29 Aug 2018
Distance of Public Hearing Venue from the Proposed Project :0
IOCL-REWARI TERMINAL, VILL: KARNAWAS, BAWAL-REWARI ROAD, REWARI, HARYANA-123401
State :Haryana
District :Rewari
Tehsil :Rewari
Village :karnawas, Bawal -Rewari Road
69The points raised during public hearing are: During rainy season Rewari terminal releasing water into the adjacent crop field, since 10 to 12 year, due to that crop is destroyed. Related to safety oDeputy Commissioner
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By SPCB
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on
(iii)Letter No. RWR/HSPCB/17-18
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Mar 16 2018 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)MS29960862038580OthersKLOthersPipeline
(2.)HSD4817060000108170OthersKLOthersPipeline
(3.)SKO12030012030OthersKLOthersPipeline
(4.)Ethnaol1400140OthersKLOthersPipeline
(5.)BIODIESEL20140160OthersKLOthersPipeline
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)NANANANANA
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 14 Dec 2017
(iv)Valid Upto 30 Sep 2019
(v)File No. 313091217REWCTO4329070
(vi)Application No. 4329070
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 55.23
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.004
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.55
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.3907
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 00
(b)Existing quantity of raw material/fuel 00
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)NS0OthersNANAOthersNA0 OthersNACopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2017 To 31 May 2017
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)NOxMicro Gram per Meter Cube29.521.125.380
(2.)PM10Micro Gram per Meter Cube120.473.9117.7100
(3.)PM2.5Micro Gram per Meter Cube59.439.65960
(4.)SO2Micro Gram per Meter Cube15.89.213.580
(5.)OthersCOMicro Gram per Meter Cube6813866742000
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHOthersPh unit7.717.206.58.5
(2.)Chloridesmg/l26993562501000
(3.)Total Hardnessmg/l2148330200600
(4.)Fluoridemg/l10.511.5
(5.)OthersTurbidityOthersNTU4.11.251.5
(6.)TDSmg/l42129945002000
(7.)TSSmg/l0000
    14.3.     No. of Surface Water monitoring locations : 0
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHmg/l00C
(2.)DOmg/l00C
(3.)BODmg/l00C
(4.)OthersTDSmg/l00C
(5.)CODmg/l00C
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))80.150.275
(2.)Leq(Night)A-weighted decibels(dB(A))76.240.970
    14.5.     No. of Soil Sample Monitored locations : 4
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)K(Potassium)Milliequivalents per 100 Gram1.20.6
(2.)N(Nitrogen)OthersGRAM1158.4965.3
(3.)P(Phosphorus)Othersmg/100 gm385.3138.9
(4.)pHOthers-7.287.16
(5.)Electric ConductivityOthersS/m0.330.22
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 10.1
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 0 To 0
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersLocal Source15.13Copy of Permission LettermodeOthersby RoadOthersTankerRB/WATER/15614 Mar 201716
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic30Disposed off into Soak pitOthersDisposed off into Soak pit03
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 3
(b)Total Discharged Water (Kilolitre per Day) 3
(c)Total Reused Water (Kilolitre per Day) 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Used OilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.52Tons10RoadAuthorized Recyclers
(2.)Tank Cleaning SludgeHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.72Tons10RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube00000
(2.)SO2Microgram per Meter Cube00000
(3.)NOxMicrogram per Meter Cube00000
(4.)PM10Microgram per Meter Cube00000
(5.)Others(Specify)COMicrogram per Meter Cube00000
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG SETHSD9.860.25OthersPM, SO2 and NOx-
(2.)Fire Water Engine PumpsHSD6.570.125OthersPM, SO2 and NOx0
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 1200
(b)Source Power grid of HSEB
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 3 DG Sets
(e)Stack Height (in m) 9.86
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 39.82
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 39.82
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 23810
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 20
(e)Settlements (ha.) 5886
(f)Industrial (ha.) 500
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Scrub land 3826
    Total (ha.) 34042
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant8.51Tanks, utility area, etc.
(2.)Green belt13.88
(3.)Built Up Area4.16
(4.)OthersOpen space, scrap yard,etc13.25
Total (ha.) 39.8
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNA0NA
(2.)WLSNA0NA
(3.)NPANA0NA
(4.)ESAsNA0NA
(5.)CorridorsNA0NA
(6.)Wildlife CorridorsNA0NA
(7.)ESZsNA0NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNA0NA
(2.)Defence InstallationsNA0NA
(3.)ForestNA0NA
(4.)OthersNANA0NA
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 39.82
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Yet To Start
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 50
(c)Temporary Employment- During Construction 100
(d)Temporary Employment- During Operation 0
(e)No. of working days 360
(f)Total Manpower 150
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt1388960138896
(2.)No. of Plants11204011204
(3.)Funds Allocated38.66038.66
(4.)Percentage of Total Project Area34.88034.88
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialAdditional job creations, temporary and permanent, during construction and operation phase
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1720/ RA 051
(ii)Name of the EIA Consultant Eco Chem Sales and Services
(iii)Address Office floor, Ashoka Pavilion ’A’ New Civil Road, Surat, 395001
(iv)Mobile No. 0
(v)Landline No. 261223163
(vi)Email Id eco@ecoshripad.com
(vii)Category of Accreditation B
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 29 Feb 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAPlease inform about the EC for the present storage facilities of capacity 90320 KL, and the compliance status thereof. Any clarification in this regard needs to be submitted along with supporting documents. 30 Dec 2018
2.NAThe correction have been made as per the instruction received 31 Dec 2018
3.NAPlease submit documentary evidence/proof for the present storage facilities set up in 1996 to take the proposal forward. 06 Jan 2019
4.NAThe correction have been made as per the instruction received 10 Jan 2019
5.NAIn response to our last observations dated 6/1/2019, please submit consent to establish/operate issued by SPCB for the existing storage facilities/capacity of 90320 KL set up in 1996. 17 Jan 2019
6.NAThe correction have been made as per the instruction received 01 Feb 2019
7.NASEAC/SEIAA for the State of Haryana has been reconstituted. Please submit the proposal accordingly. 01 Feb 2019
8.NAThe correction have been made as per the instruction received 05 Feb 2019
9.NAAs already informed, your proposal is to be considered by SEAC/SEIAA of Haryana and not at the central level. 07 Feb 2019
10.NAThe correction have been made as per the instruction received 15 Feb 2019
11.NAPlease see our earlier observations dated 1/2/2019 & 7/2/2019 for the needful. 15 Feb 2019
12.NAThe correction have been made as per the instruction received 16 Feb 2019
13.NAWe reiterate our earlier observations. Please submit your proposal to the SEAC/SEIAA. 16 Feb 2019
14.NAThe correction have been made as per the instruction received 20 Feb 2019
15.NAYour reply is noted 23 Feb 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantHarshverdhan Gupta
DesignationCTM
Name of Company (Applicant Name should not be given here)INDIAN OIL CORPORATION LIMITED MARKETING DIVISION
AddressIndian oil Bhavan, G-9, Ali Yavar Jung Marg, Bandra (East), Mumbai-400051
Print