EC Report
1. Project Details
   Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? : No
1. Project Details
   i. Proposal No. : IA/RJ/MIN/20302/2013    ii. MoEFCC File No. : J-11015/232/2013-IA.II (M)    iii.Short narrative of the project: Bajri Mine (Minor Mineral)    iv. Project Sector : Mining Projects    v. Company/Proponent : Shri AbhishekChaudhary
  vi.Details of State of the project
Details of State of the project
S.no. State Name District Name Tehsil Name
1.KeralaMalappuramNilambur
2.RajasthanBhilwaraRaipur
 
   vii.Date of TOR Granted 17 Oct 2013 viii.TOR letter issued by Ministry: Annexure-TOR letter ix.Date of Submission for EC: 01 Apr 2015 x.Project Type: New
2. Uploaded Documents of EIA/EMP,Risk Assessment,Public Hearing etc.
i.EIA/EMP: Annexure-EIA/EMP ii.Risk Assessment: Annexure-Risk Assessment iii.Public Hearing: Annexure-Public Hearing    iv. Date of Public Hearing: 11 Dec 2014   v. Uploaded Additional Report/Study/Document as desired by Ministry/EAC: Annexure-Additional Report/Study/Document   vi. Uploaded Cover Letter: Annexure-Cover Letter   vii.Remarks: The project is being uploaded for Final EC Consideration.
3. Additional Detail Sought
Additional Detail Sought
Sno. ADS Letter Remarks Date of ADS
1. ADS LetterAdditional letter 02 Jan 2017
2. ADS LetterFinal Report Phase-II Sand Mining Replenishment Study carried out by CMPDI, Ranchi is being uploaded for kind consideration in regards to EC. 03 Apr 2018
3.NAPlease upload all the information sought by EAC in its meeting held on Jan-2018 and May 2018 in respect of sand mining project from State of Rajasthan. Upload the actual replenishment study report. Recommendation of Sub-Divisional Committee as per S.O. 141(E) dated 15.01.2016. 07 Oct 2019
4. ADS LetterSubmission of Replenishment Study Report for Village: (Chhatol, Bhatewar and Nathariya), Tehsil- Raipur, District- Bhilwara (Rajasthan), Name of River – Kothari River, Lease Area:- 836.13 Hectare, Surveyed/Study Area:-50.1307 Hectare. Chhatol (Stretch-I):-12.0831 Hectare, Bhatewar (Stretch-II):-18.4767 Hectare, Nathariyas (Stretch-III):- 19.5709 Hectare. 16 May 2020
5.NA

the proposal is deferred 

01 Jul 2020
6. ADS LetterRequisite information regarding replenishment study report Sand mining project report prepared and verified by irrigation as well as Department of Mines & Geology Rajasthan Complying the points raised by EAC IN 16TH meeting held on 5-6 May 2020. The point wise compliance & clarifications are as following:- 11 Jul 2020
4. Accredited Consultant Details
   i. Accreditation status : Yes    ii. Accreditation No. : 44    iii. Name of Consultant: ENKAY ENVIRO SERVICES PVT. LTD   iv. Address : #24-B, Gopal Bari, Ajmer Pulia, Jaipur   v. Mobile No.: 9314363996   vi. Landline No.: 1414013996   vii. Email Id: raipurbajri@gmail.com
5. Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.
   i. Name of Applicant : Mr Abhishek    ii. Designation : Lessee    iii. Name of Company(Applicant Name should not be given here) : MR ABHISHEK CHAUDHARY    iv. Address : Abhishek Chaudhary MRS Group, A-24, Ambabari, Near Chomu Puliya Jaipur (Rajasthan v. Uploaded copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency: NIL
Print