1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Proposed 1 x 15 MW Nett (Gross 17 MW) coal based Captive Power Plant, 5000 TPA Ferro Titanium, 3000 TPA Ferro Manganese, 12 TPD Aluminum powder plant & 2.4 TPA Scandium Oxide Recovery Plant | (b)Name of the Company / Organisation | SARAF AGENCIES PRIVATE LIMITED | (c)Registered Address | 4/1 RED CROSS PLACE,Kolkata,Kolkata,West Bengal-700001 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | AJEETRAJ MEHTA | (b)Designation (Owner/ Partner/ CEO) | DIRECTOR | (c)Address | 4/1 Red Cross Place 3rd floor,4/1 Red Cross Place 3rd floor,Kolkata,Kolkata,Jharkhand-700001 | (d)Pin code | 700001 | (e)E-mail | pradeep@sarafagencies.com | (f)STD Code. | 33(f)Telephone No. | 22485901 | (g)Fax No. | 22487843 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 3(a) Metallurgical industries (ferrous & non ferrous)
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/OR/IND/57594/2016 | (d)Master Proposal Number(Single Window) | SW/88129/2018 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 1 | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | i) Lease Deed No.539/08 dated 21.02.08 for 34.095 | (b)Pincode | 761045 | (c)Bounded Latitudes (North) | | From | | Degree | 19.327778 | Minutes | | Second | | From | | Degree | 19.34138 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 84.952778 | Minutes | | Second | | From | | Degree | 84.96111 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 74A/15, 74A/16, 74E/3 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 31 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 38 | (j)Seismic Zone | 2 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Orissa | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Orissa | Ganjam | Chhatrapur | | |
|
6. | Details of Terms of Reference (ToR): | (a)MoEF&CC / SEIAA File Number | J-11011/658/2007-IA.II(I) | (b)Date of Apply of TOR | 19 Jul 2016 | (c)Date of Issue of TOR / Standard ToR | 02 Dec 2016 | (d)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 16 Aug 2017 | Distance of Public Hearing Venue from the Proposed Project : | 8 |
| Vacant Space infront of Kanamana G.P. Office | State : | Orissa | District : | Ganjam | Tehsil : | Chhatrapur | Village : | Kanamana |
| 102 | Pollution Control Measures, Employment to the Local People, CSR Activity & Plantation | Others | Additional District Magistrate | |
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | Ferro Titanium | 5000 TPA | | (2.) | Ferro Manganese | 3000 TPA | | (3.) | Aluminium Powder Plant | 12 TPD | | (4.) | Scandium Oxide Recovery Plant | 2.4 TPA | | (5.) | Captive Power Plant | 15 MW | | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Ferro Manganese | 3000 | Tons per Annum | | Road | | (2.) | Aluminium Powder Plant | 12 | Others | TPD | Road | | (3.) | Scandium Oxide Recovery Plant | 2.4 | Tons per Annum | | Road | | (4.) | Ferro Titanium | 5000 | Tons per Annum | | Road | | (5.) | Captive Power Plant | 15 | Mega Watt(MW) | | Road | | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 30 Mar 2017 | (iv)Valid Upto | 31 Mar 2021 | (v)File No. | 4771/IND-I-CON-6543 | (vi)Application No. | 1567012 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 193.3 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 5.54 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 2.8 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.554 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 191305 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 191305 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Ilmenite Concentrated | 36900 | Tons per Annum | | Market | Road | | 6 | Open Market | | Copy of Linkage | (2.) | Mn ore | 37000 | Tons per Annum | | Manganese Ore (I) Ltd. | Road | | 150 | Open Market | | Copy of Linkage | (3.) | Fluorspar | 1320 | Tons per Annum | | Market | Road | | 50 | Open Market | | Copy of Linkage | (4.) | Aluminium Powder | 3960 | Tons per Annum | | In house Production | Road | | 0 | Others | In house | Copy of Linkage | (5.) | Coal | 111540 | Tons per Annum | | Talcher Area | Road | | 250 | Open Market | | Copy of Linkage | (6.) | Waste Acid | 585 | Cubic Meter per Day | | In House Production | Others | Internal Transport | 0 | Others | Pigment Plant | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Dec 2016 To 28 Feb 2017 | (b)Season | Winter | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM2.5 | | Micro Gram per Meter Cube | 49.4 | 31.5 | 49 | 60 | (2.) | NOx | | Micro Gram per Meter Cube | 17 | 9.3 | 9.3 | 80 | (3.) | SO2 | | Micro Gram per Meter Cube | 15.2 | 7.7 | 15.1 | 80 | (4.) | PM10 | | Micro Gram per Meter Cube | 89.2 | 45.6 | 88.3 | 100 | |
14.2. No. of Ground Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | TDS | | | mg/l | | 389.87 | 98.05 | 500 | 2000 | (2.) | Total Hardness | | | mg/l | | 260 | 56 | 200 | 600 | (3.) | Chlorides | | | mg/l | | 23.79 | 13.79 | 250 | 1000 | (4.) | TSS | | | mg/l | | 0 | 0 | 0 | 0 | (5.) | Heavy Metals | | Zinc | mg/l | | 0.72 | 0.05 | 5 | 15 | (6.) | pH | | | NA | | 7.2 | 6.49 | 6.5 | 8.5 | (7.) | Fluoride | | | mg/l | | 0.31 | 0.07 | 1 | 1.5 | |
14.3. No. of Surface Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | BOD | | mg/l | | 20.9 | 7.6 | B | (2.) | COD | | mg/l | | 0 | 0 | B | (3.) | pH | | NA | | 7.74 | 7.01 | B | (4.) | DO | | mg/l | | 5.3 | 2.7 | B | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 72.3 | 39.2 | 75 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 68.4 | 35.6 | 65 | |
14.5. No. of Soil Sample Monitored locations : 8 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | K(Potassium) | Kilogram per hectare | | 211 | 169 | (2.) | pH | Others | NA | 7.3 | 6.39 | (3.) | N(Nitrogen) | Kilogram per hectare | | 426 | 328 | (4.) | P(Phosphorus) | Kilogram per hectare | | 45 | 27 | (5.) | Electric Conductivity | Millisiemens per Centimetre | | 285 | 79 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 5.45 To 9.45 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 2.26 To 6.11 | (c)Whether Ground Water Intersection will be there ? | NA | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Surface | | 610 | 18 | Copy of Permission Letter | Pipeline | | Others | Pipeline | 26883/WR., Irr.-II-WRC-106/16 | 17 Nov 2016 | 1762 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Sewage Treatment Plant | 8 | 10 | Primary, Secondary, Tertiary | Reuse within the Plant & Recycling | | 8 | | (2.) | Effluent Treatment Plant | 114 | 130 | Primary, Secondary, Tertiary | Reuse within the Plant & Recycling | | 114 | | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 122 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 122 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Captive Power Plant | Fly Ash | | 3258.9 | Tons | 0 | Others | By Dumpers | Treatment, Storage and Disposal Facility(TSDF) | | (2.) | Ferro Titanium | Others | Slag | 200 | Tons | 0 | Others | By Dumpers | Treatment, Storage and Disposal Facility(TSDF) | | (3.) | Scandium Oxide Recovery Plant | Others | Sludge from Raffinate | 0.4 | Tons | 0 | Others | By Dumpers | Treatment, Storage and Disposal Facility(TSDF) | | (4.) | Captive Power Plant | Bottom Ash | | 810 | Tons | 0 | Others | By Dumpers | Treatment, Storage and Disposal Facility(TSDF) | | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | NOx | | Microgram per Meter Cube | 14.65 | 0 | 0.79 | 15.44 | 80 | (2.) | PM10 | | Microgram per Meter Cube | 89.2 | 0 | 0.47 | 89.67 | 100 | (3.) | SO2 | | Microgram per Meter Cube | 13.25 | 0 | 4.90 | 18.15 | 80 | (4.) | PM2.5 | | Microgram per Meter Cube | 0 | 0 | 0 | 0 | 60 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | FBC Stack | Coal | 78 | 1.6 | SO2 | | 1.05 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 23000 | (b)Source | SOUTHCO | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 0 | (e)Stack Height (in m) | 0 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 91.4 | (c)Government Land (ha.) | 13.8 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 105.2 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 14231 | (b)Waste/Barren Land (ha.) | 94 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 1816 | (e)Settlements (ha.) | 1193 | (f)Industrial (ha.) | 0 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 1170 | (i)Marine Area (ha.) | 9614 | (j)Others (ha.) : Plantation, Sandy Area, Land with/without Scrub | 6382 | Total (ha.) | 34500 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Green belt | | 34.8 | | (2.) | Others | Future Expansion | 29.13 | | (3.) | Main Plant | | 41.27 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Critically Polluted Area | None | 0 | None within 15 Km radius | (2.) | NPA | None | 0 | None within 15 Km radius | (3.) | ESAs | None | 0 | None within 15 Km radius | (4.) | Corridors | None | 0 | None within 15 Km radius | (5.) | WLS | None | 0 | None within 15 Km radius | (6.) | ESZs | None | 0 | None within 15 Km radius | (7.) | Wildlife Corridors | None | 0 | None within 15 Km radius | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | None | 0 | None within 15 Km radius | (2.) | Archaeological Sites | | None | 0 | None within 15 Km radius | (3.) | Defence Installations | | None | 0 | None within 15 Km radius | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 105.2 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | NA | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Rushikulya River | (ii)Direction of Water Bodies in Buffer Area | North West | (iii)Distance of Water Bodies in Buffer Area | 9 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 150 | (c)Temporary Employment- During Construction | 0 | (d)Temporary Employment- During Operation | 29 | (e)No. of working days | 330 | (f)Total Manpower | 179 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 34.8 | (b)Percentage of Total Project Area | 33.08 | (c)No. of Plants to be Planted | 52200 | (d)Funds Allocated for Plantation | 17400000 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Environmental | Planting of trees in the adjuring areas of the plant. | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 1 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1720/RA 0119 | (ii)Name of the EIA Consultant | Centre for Envotech & Management Consultancy Pvt. | (iii)Address | N5/305, IRC Village, Nayapalli, Bhubaneswar- 751015 | (iv)Mobile No. | 9861032826 | (v)Landline No. | 6742360344 | (vi)Email Id | cemc_consultancy@yahoo.co.in | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 1 | (ix)Validity of Accreditation | 16 Feb 2020 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | May kindly peruse the EIA/EMP submitted. The following observations were made:
1. The EIA/EMP is not as per the generic structure envisaged in the EIA Notification
2. The plans and figures are not clear
3. The corporate environmental pliocy copy is not attached and details are not in compliance with ToR 9(i), 9(ii), 9(iii) and 9(iv).
You are requested to re-submit the application with incorporating the details as per the observations made above | 23 Dec 2018 | 2. | NA | The correction have been made as per the instruction received | 01 Feb 2019 | |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | NA | After detailed deliberations, the Committee
sought the following additional information for further re-consideration of the
proposal.
Print
|
|
|
|