(a)Name of the project(s) Proposed 1 x 15 MW Nett (Gross 17 MW) coal based Captive Power Plant, 5000 TPA Ferro Titanium, 3000 TPA Ferro Manganese, 12 TPD Aluminum powder plant & 2.4 TPA Scandium Oxide Recovery Plant
(b)Name of the Company / Organisation SARAF AGENCIES PRIVATE LIMITED
(c)Registered Address 4/1 RED CROSS PLACE,Kolkata,Kolkata,West Bengal-700001
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant AJEETRAJ MEHTA
(b)Designation (Owner/ Partner/ CEO) DIRECTOR
(c)Address 4/1 Red Cross Place 3rd floor,4/1 Red Cross Place 3rd floor,Kolkata,Kolkata,Jharkhand-700001
(d)Pin code 700001
(e)E-mail pradeep@sarafagencies.com
(f)STD Code. 33(f)Telephone No. 22485901
(g)Fax No. 22487843
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity3(a) Metallurgical industries (ferrous & non ferrous)
Minor Activity
(b)Category A
(c)Proposal Number IA/OR/IND/57594/2016
(d)Master Proposal Number(Single Window) SW/88129/2018
(e)EAC concerned (for category A Projects only) Industrial Projects - 1
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. i) Lease Deed No.539/08 dated 21.02.08 for 34.095
(b)Pincode 761045
(c)Bounded Latitudes (North)
From
Degree 19.327778
Minutes
Second
From
Degree 19.34138
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 84.952778
Minutes
Second
From
Degree 84.96111
Minutes
Second
(e)Survey of India Topo Sheet No. 74A/15, 74A/16, 74E/3
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 31
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 38
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Orissa
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)OrissaGanjamChhatrapur
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number J-11011/658/2007-IA.II(I)
(b)Date of Apply of TOR 19 Jul 2016
(c)Date of Issue of TOR / Standard ToR 02 Dec 2016
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :15 Jul 2017
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :16 Aug 2017
Distance of Public Hearing Venue from the Proposed Project :8
Vacant Space infront of Kanamana G.P. Office
State :Orissa
District :Ganjam
Tehsil :Chhatrapur
Village :Kanamana
102Pollution Control Measures, Employment to the Local People, CSR Activity & PlantationOthersAdditional District Magistrate
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Ferro Titanium5000 TPA
(2.)Ferro Manganese3000 TPA
(3.)Aluminium Powder Plant12 TPD
(4.)Scandium Oxide Recovery Plant2.4 TPA
(5.)Captive Power Plant15 MW
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Ferro Manganese3000Tons per AnnumRoad
(2.)Aluminium Powder Plant12OthersTPDRoad
(3.)Scandium Oxide Recovery Plant2.4Tons per AnnumRoad
(4.)Ferro Titanium5000Tons per AnnumRoad
(5.)Captive Power Plant15Mega Watt(MW)Road
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 30 Mar 2017
(iv)Valid Upto 31 Mar 2021
(v)File No. 4771/IND-I-CON-6543
(vi)Application No. 1567012
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 193.3
(b) Funds Allocated for Environment Management (Capital) (in Crores) 5.54
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 2.8
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.554
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 191305
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 191305
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Ilmenite Concentrated36900Tons per AnnumMarketRoad6 Open MarketCopy of Linkage
(2.)Mn ore37000Tons per AnnumManganese Ore (I) Ltd.Road150 Open MarketCopy of Linkage
(3.)Fluorspar1320Tons per AnnumMarketRoad50 Open MarketCopy of Linkage
(4.)Aluminium Powder3960Tons per AnnumIn house ProductionRoad0 OthersIn houseCopy of Linkage
(5.)Coal111540Tons per AnnumTalcher AreaRoad250 Open MarketCopy of Linkage
(6.)Waste Acid585Cubic Meter per DayIn House ProductionOthersInternal Transport0 OthersPigment PlantCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Dec 2016 To 28 Feb 2017
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube49.431.54960
(2.)NOxMicro Gram per Meter Cube179.39.380
(3.)SO2Micro Gram per Meter Cube15.27.715.180
(4.)PM10Micro Gram per Meter Cube89.245.688.3100
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TDSmg/l389.8798.055002000
(2.)Total Hardnessmg/l26056200600
(3.)Chloridesmg/l23.7913.792501000
(4.)TSSmg/l0000
(5.)Heavy MetalsZincmg/l0.720.05515
(6.)pHNA7.26.496.58.5
(7.)Fluoridemg/l0.310.0711.5
    14.3.     No. of Surface Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)BODmg/l20.97.6B
(2.)CODmg/l00B
(3.)pHNA7.747.01B
(4.)DOmg/l5.32.7B
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))72.339.275
(2.)Leq(Night)A-weighted decibels(dB(A))68.435.665
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)K(Potassium)Kilogram per hectare211169
(2.)pHOthersNA7.36.39
(3.)N(Nitrogen)Kilogram per hectare426328
(4.)P(Phosphorus)Kilogram per hectare4527
(5.)Electric ConductivityMillisiemens per Centimetre28579
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 5.45 To 9.45
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 2.26 To 6.11
(c)Whether Ground Water Intersection will be there ? NA
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface61018Copy of Permission LetterPipelineOthersPipeline26883/WR., Irr.-II-WRC-106/1617 Nov 20161762
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Sewage Treatment Plant810Primary, Secondary, TertiaryReuse within the Plant & Recycling8
(2.)Effluent Treatment Plant114130Primary, Secondary, TertiaryReuse within the Plant & Recycling114
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 122
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 122
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Captive Power PlantFly Ash3258.9Tons0OthersBy DumpersTreatment, Storage and Disposal Facility(TSDF)
(2.)Ferro TitaniumOthersSlag200Tons0OthersBy DumpersTreatment, Storage and Disposal Facility(TSDF)
(3.)Scandium Oxide Recovery PlantOthersSludge from Raffinate0.4Tons0OthersBy DumpersTreatment, Storage and Disposal Facility(TSDF)
(4.)Captive Power PlantBottom Ash810Tons0OthersBy DumpersTreatment, Storage and Disposal Facility(TSDF)
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)NOxMicrogram per Meter Cube14.6500.7915.4480
(2.)PM10Microgram per Meter Cube89.200.4789.67100
(3.)SO2Microgram per Meter Cube13.2504.9018.1580
(4.)PM2.5Microgram per Meter Cube000060
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)FBC StackCoal781.6SO21.05
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 23000
(b)Source SOUTHCO
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 0
(e)Stack Height (in m) 0
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 91.4
(c)Government Land (ha.) 13.8
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 105.2
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 14231
(b)Waste/Barren Land (ha.) 94
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 1816
(e)Settlements (ha.) 1193
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 1170
(i)Marine Area (ha.) 9614
(j)Others (ha.) : Plantation, Sandy Area, Land with/without Scrub 6382
    Total (ha.) 34500
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Green belt34.8
(2.)OthersFuture Expansion29.13
(3.)Main Plant41.27
Total (ha.) 105.2
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNone0None within 15 Km radius
(2.)NPANone0None within 15 Km radius
(3.)ESAsNone0None within 15 Km radius
(4.)CorridorsNone0None within 15 Km radius
(5.)WLSNone0None within 15 Km radius
(6.)ESZsNone0None within 15 Km radius
(7.)Wildlife CorridorsNone0None within 15 Km radius
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNone0None within 15 Km radius
(2.)Archaeological SitesNone0None within 15 Km radius
(3.)Defence InstallationsNone0None within 15 Km radius
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 105.2
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired NA
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Rushikulya River
(ii)Direction of Water Bodies in Buffer Area North West
(iii)Distance of Water Bodies in Buffer Area 9
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 150
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 29
(e)No. of working days 330
(f)Total Manpower 179
32.
Green Belt in Ha:
(a)Total Area of Green Belt 34.8
(b)Percentage of Total Project Area 33.08
(c)No. of Plants to be Planted 52200
(d)Funds Allocated for Plantation 17400000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalPlanting of trees in the adjuring areas of the plant.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 1
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1720/RA 0119
(ii)Name of the EIA Consultant Centre for Envotech & Management Consultancy Pvt.
(iii)Address N5/305, IRC Village, Nayapalli, Bhubaneswar- 751015
(iv)Mobile No. 9861032826
(v)Landline No. 6742360344
(vi)Email Id cemc_consultancy@yahoo.co.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 1
(ix)Validity of Accreditation 16 Feb 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAMay kindly peruse the EIA/EMP submitted. The following observations were made: 1. The EIA/EMP is not as per the generic structure envisaged in the EIA Notification 2. The plans and figures are not clear 3. The corporate environmental pliocy copy is not attached and details are not in compliance with ToR 9(i), 9(ii), 9(iii) and 9(iv). You are requested to re-submit the application with incorporating the details as per the observations made above 23 Dec 2018
2.NAThe correction have been made as per the instruction received 01 Feb 2019