Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) COMMON BIOMEDICAL WASTE TREATMENT FACILITY, PANCHKULA
(b)Name of the Company / Organisation ESSKAY HYGIENIC SERVICES
(c)Registered Address NIL
(d)Legal Status of the Company NIL
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant ASHWANI DOGRA
(b)Designation (Owner/ Partner/ CEO) ACCOUNTANT
(c)Address NIL
(d)Pin code 125121
(e)E-mail esskayhygienic18@gmail.com
(f)STD Code. 141(f)Telephone No. 4029115
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(g) Distilleries
Minor Activity
(b)Category A
(c)Proposal Number IA/HR/IND2/88027/2017
(d)Master Proposal Number(Single Window) SW/88026/2018
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. KHEWAT NO. 1, KHATONI NO. 1 KITE NO. 50 TADADI 314
(b)Pincode 134201
(c)Bounded Latitudes (North)
From
Degree 302913.37
Minutes
Second
From
Degree 302914.68
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 765952.95
Minutes
Second
From
Degree 765954.94
Minutes
Second
(e)Survey of India Topo Sheet No. 53 B/15
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 0.30
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0.33
(j)Seismic Zone 4
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Haryana
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number SEIAA/HR/2017/169
(b)Date of Apply of TOR 01 Mar 2017
(c)Date of Issue of TOR / Standard ToR 15 Mar 2017
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason UNDER CLAUSE 7(ii), 23 Nov, 2016
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)INCINERATOR150 KG/HR1 NO.
(2.)AUTOCLAVE25 KG/BATCH1 NO.
(3.)ETP4 KLD1 NO.
(4.)SHREDDER25 KG/HR1 NO.
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)NONE0OthersNILOthersNONE
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 21 Apr 2015
(iv)Valid Upto 31 Mar 2017
(v)File No. HSPCB/Consent/: 280391PANCTO1893134
(vi)Application No. HSPCB/Consent/: 280391PANCTO1893134
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 0.45
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.34
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.005
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.09
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)NONE0OthersNONENONEOthersNONE0 OthersNONECopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2017 To 31 May 2017
(b)Season Pre-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube94.570.394.1100
(2.)PM2.5Micro Gram per Meter Cube55.241.855.260
(3.)OthersCOMili Gram per Meter Cube1.080.561.064.0
(4.)SO2Micro Gram per Meter Cube15.87.2114.880
(5.)NOxMicro Gram per Meter Cube28.715.628.580
    14.2.     No. of Ground Water monitoring locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TSSmg/l0.010.010.051.5
(2.)pHOthersNone7.686.498.58.5
(3.)TDSmg/l9247245002000
(4.)Total Hardnessmg/l464368200600
(5.)Chloridesmg/l214192.92501000
(6.)Heavy Metalsironmg/l0.10.10.30.3
(7.)Otherscalciummg/l97.878.675200
(8.)Fluoridemg/l1.01.01.01.5
    14.3.     No. of Surface Water monitoring locations : 3
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHOthersNONE6.596.24C
(2.)DOmg/l53C
(3.)BODmg/l74C
(4.)CODmg/l16.459.56C
(5.)OthersMagnesiummg/l11.28.51C
    14.4.     No. of Ambient Noise monitoring locations : 6
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))65.957.355
(2.)Leq(Night)A-weighted decibels(dB(A))51.240.245
    14.5.     No. of Soil Sample Monitored locations : 6
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pHOthersnone75
(2.)Electric ConductivityMillisiemens per Centimetre0.4240.386
(3.)N(Nitrogen)Otherspercentage by mass0.1420.093
(4.)P(Phosphorus)Milligram per Kilogram123.969.4
(5.)K(Potassium)Milligram per Kilogram246.8182.6
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 29.44 To 8.11
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 29.0 To 6.78
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater55Copy of Permission LettermodeOtherstankerTube Wellnil07 Apr 2017200
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)domestic sewage0.40soak pitOtherssoak pit0.40
(2.)process0.34etpGreen Belt Renewal Plant0.3
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 0.7
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 0.7
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)incineration ashBio-Medical Waste3Tons10RoadTreatment, Storage and Disposal Facility(TSDF)
(2.)disinfexted sharpsBio-Medical Waste3Tons10RoadOthersiron foundaries
(3.)glass wasteBio-Medical Waste1.6Tons10RoadAuthorized Recyclers
(4.)plastic waste after disinfection and shreddingPlastic Waste3.2Tons10RoadAuthorized Recyclers
(5.)oil & greaseBio-Medical Waste3Tons0OthersnoneOthersincineration
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube94.11.40.12594.22100
(2.)PM2.5Microgram per Meter Cube00000
(3.)SO2Microgram per Meter Cube15.81.40.01115.8180
(4.)NOxMicrogram per Meter Cube28.71.40.89829.5980
(5.)Others(Specify)noneMicrogram per Meter Cube00000
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG SETHSD1.20.15NOx9.2
(2.)INCINERATORHSD300.35OthersHCL50
(3.)DG SETHSD1.20.15OthersCO3.5
(4.)INCINERATORHSD300.35PM1050
(5.)DG SETHSD1.20.15PM100.3
(6.)DG SETHSD1.20.15SO20.05
(7.)INCINERATORHSD300.35SO20
(8.)INCINERATORHSD300.35NOx400
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 21.16
(b)Source DHBVN
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 40 kVA )1 No.)
(e)Stack Height (in m) 1.2
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0.4
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 0.4
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : private land 0.4
    Total (ha.) 0.4
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Green belt0.1537.07
(2.)Main Plant0.25work shed, open surface & paved areas
Total (ha.) 0.4
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSnone00
(2.)ESAsNIL00
(3.)CorridorsNIL00
(4.)Critically Polluted AreaNIL00
(5.)NPANIL00
(6.)ESZsNIL00
(7.)Wildlife CorridorsNIL00
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestBARI KHORI PF7Bari Khori P.F. ~7.0 km towards ENE
(2.)OthersWATER BODYBaliali Nala0.6Baliali Nala ~ 0.6 km towards NNE
(3.)Archaeological SitesNIL00
(4.)Defence InstallationsNIL00
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0.4
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Baliali Nala ~ 0.6 km towards NNE • Dangri Nadi ~ 4.5 km towards NW • Dhanana Nala ~ 2.3 km towards S • Dhanana River ~ 3.9 km towards SSW • Begna Nadi ~ 6.7 km towards E • Amri Choa ~ 5.0 km towards SE
(ii)Direction of Water Bodies in Buffer Area North
(iii)Distance of Water Bodies in Buffer Area 7
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 25
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 320
(f)Total Manpower 25
32.
Green Belt in Ha:
(a)Total Area of Green Belt 0.15
(b)Percentage of Total Project Area 37.50
(c)No. of Plants to be Planted 60
(d)Funds Allocated for Plantation 100000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalThe proper bio-medical waste management will help to control nosocomial diseases (hospital acquired infections), reduce HIV/AIDS, sepsis, and hepatitis transmission from dirty needles and other improperly cleaned / disposed medical items, control zones (diseases passed to humans through insects, birds, rats and other animals), prevent illegal repacking and resale of contaminated needles, cut cycles of infection and avoid negative long-term health effects like cancer, from the environmental relea
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1720/IA0026
(ii)Name of the EIA Consultant GAURANG ENVIRONMENTAL SOLUTIONS PVT. LTD.
(iii)Address 501, SONI'S PARIS POINT NEAR COLLECTORATE CIRCLE, BANI PARK, JAIPUR
(iv)Mobile No. 9782074776
(v)Landline No. 0141402911
(vi)Email Id gaurangenviro@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 31 Jan 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAProposal is not relating to Industry-2 sector. Please submit the same to Infra-2 sector. 12 Dec 2018
2.NAThe correction have been made as per the instruction received 14 Dec 2018
3.NAPlease see our observations dated 12/12/2018 for the needful. 16 Dec 2018
4.NAThe correction have been made as per the instruction received 17 Dec 2018
5.NAPlease see our observations dated 12/12/2018 for the needful. 22 Dec 2018
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantASHWANI DOGRA
DesignationACCOUNTANT
Name of Company (Applicant Name should not be given here)ESSKAY HYGIENIC SERVICES
AddressKhewat No 1 Khatoni No 1 Kite No 50 Tadadi No 314 village VPO Bagwala Tehsil Barwala District Panchkula
Print