Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Proposed Chlorinated Paraffin Plasticizer Unit by M/s Swastik Chloroffin LLP At Village: Azimabad Pardi Nagda, District: Ujjain, State: Madhya Pradesh
(b)Name of the Company / Organisation SWASTIK CHLOROFFIN L L P
(c)Registered Address 4656/15, Jai Mata Market, Tri Nagar, Delhi,,Ujjain,Madhya Pradesh-110035
(d)Legal Status of the Company Others
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Jitesh Nenwani
(b)Designation (Owner/ Partner/ CEO) Partner
(c)Address 4656/15, Jai Mata Market, Tri Nagar, Delhi,,Saraswati Vihar,North West,Delhi-110035
(d)Pin code 110035
(e)E-mail swastikchloroffinllp123@gmail.com
(f)STD Code. 124(f)Telephone No. 4291036
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
Minor Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
(b)Category A
(c)Proposal Number IA/MP/IND2/87993/2018
(d)Master Proposal Number(Single Window) SW/87976/2018
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Survey no.- 2, 21/3, 21/2 & 23/3
(b)Pincode 456331
(c)Bounded Latitudes (North)
From
Degree 23.4360
Minutes
Second
From
Degree 23.4369
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 75.4130
Minutes
Second
From
Degree 75.4135
Minutes
Second
(e)Survey of India Topo Sheet No. F43D6,F43D7,F43D10,F43D11
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 500
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 1.5
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Madhya Pradesh
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/209/2018-IA-II(I)
(b)Date of Apply of TOR 23 Jun 2018
(c)Date of Issue of TOR / Standard ToR 27 Jul 2018
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :04 Oct 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :12 Nov 2018
Distance of Public Hearing Venue from the Proposed Project :3
anuvibhagiya karyalaya, Nagda
State :Madhya Pradesh
District :Ujjain
Tehsil :Nagda
Village :Azimabad Pardi
40Environment should not be polluted and more plants and trees to be planted. More Cleanliness should be maintained. Villager's health and safety should be taken care. For Employment priority should beOthersRegional Officer
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)ReactorQunatity- 8 no.sSupplier- Swiss Glasscoator Imported
(2.)Graphite BlockQunatity- 4 no.sSupplier- Graphicarb Engineers
(3.)HCL Storage TankQunatity- 10 no.sSupplier- Self Made, Material Open MKT.
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Chlorinated paraffin plasticizer18000OthersMTPARoad
(2.)Hydrochloric Acid (by product)36000OthersMTPARoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 9.5
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.37
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.19
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.125
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 31200
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 31200
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Chlorine24000OthersMTPAPIPELINEPipe Conveyor0.5 Fuel Supply AgreementCopy of Linkage
(2.)Heavy Normal Paraffin7200OthersMTPAlocal marketRoad15 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2018 To 31 May 2018
(b)Season Pre-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube95.166.487.98100
(2.)PM2.5Micro Gram per Meter Cube80.332.252.1260
(3.)SO2Micro Gram per Meter Cube18.55.314.6280
(4.)NOxMicro Gram per Meter Cube56.614.242.9780
(5.)OthersCOMili Gram per Meter Cube1.420.561.114.00
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA8.307.156.58.5
(2.)Chloridesmg/l286.00118.372501000
(3.)Fluoridemg/l1.520.721.01.5
(4.)Heavy MetalsMercurymg/l0.0010.0010.0010.001
(5.)TSSNA0000
(6.)Total Hardnessmg/l437.26264.3200600
(7.)TDSmg/l9565605002000
    14.3.     No. of Surface Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l7.827.3A
(2.)CODmg/l82.2546.84B
(3.)pHNA7.827.3A
(4.)BODmg/l2615.36A
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))60.2146.2875
(2.)Leq(Night)A-weighted decibels(dB(A))53.1038.2370
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pHOthersNo unit8.026.87
(2.)P(Phosphorus)Kilogram per hectare27.216.14
(3.)N(Nitrogen)Kilogram per hectare383.00267.00
(4.)K(Potassium)Kilogram per hectare460308
(5.)Electric ConductivityMillisiemens per Centimetre0.580.45
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 30.99 To 5.05
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 10.48 To 0.08
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater930Copy of Permission LettermodeOthersBore wellTube Well21-4/678/MP/IND/201820 Aug 201893
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Industrial use9090ZLDReuse within the Plant & Recycling90
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 90
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 90
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)used oilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)1.2Kilolitre0RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube88.5000.022188.522100
(2.)PM2.5Microgram per Meter Cube46.600.013246.6160
(3.)SO2Microgram per Meter Cube14.3000.5914.8980
(4.)NOxMicrogram per Meter Cube36.4000.19836.5980
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)D.G SetHSD60.2PM100.0011
(2.)D.G SetHSD60.2SO20.0347
(3.)D.G SetHSD60.2NOx0.0011
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 190
(b)Source Madhya Pradesh Electricity Board
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 1 D.G Set of capacity 280 KVA
(e)Stack Height (in m) 6
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0.73
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 0.73
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 9221
(b)Waste/Barren Land (ha.) 5732
(c)Grazing/ Community Land (ha.) 2492
(d)Surface Water Bodies (ha.) 739
(e)Settlements (ha.) 894
(f)Industrial (ha.) 123
(g)Forest (ha.) 5451
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Fallow land 7025
    Total (ha.) 31677
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Green belt0.241
(2.)Main Plant0.49
Total (ha.) 0.731
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNot Applicable0Not Applicable in study area
(2.)ESAsNot Applicable0Not Applicable in study area
(3.)NPANot Applicable0Not Applicable in study area
(4.)ESZsNot Applicable0Not Applicable in study area
(5.)CorridorsNot Applicable0Not Applicable in study area
(6.)WLSNot Applicable0Not Applicable in study area
(7.)Wildlife CorridorsNot Applicable0Not Applicable in study area
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNot Applicable0Not Applicable in the study area
(2.)Defence InstallationsNot Applicable0Not Applicable in the study area
(3.)Archaeological SitesNot Applicable0Not Applicable in the study area
23.3.
(a)Whether Noc / Permission from the competent authority is required? Yes
(i)Uploaded Noc / Permission from the competent authority Copy of Noc / Permission from the competent authority
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) Not Applicable
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0.73
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Aquired
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Pavo Cristatus
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Chambal River
(ii)Direction of Water Bodies in Buffer Area North West
(iii)Distance of Water Bodies in Buffer Area 1.5
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 11
(c)Temporary Employment- During Construction 7
(d)Temporary Employment- During Operation 0
(e)No. of working days 300
(f)Total Manpower 18
32.
Green Belt in Ha:
(a)Total Area of Green Belt 0.241
(b)Percentage of Total Project Area 33.01
(c)No. of Plants to be Planted 2000
(d)Funds Allocated for Plantation 200000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)FinancialNeed for the proposed products are based on the demand and supply gap in the current market. With increasing utilization of the current products, in future, to cater the requirement of all the products, it is essential to have the proposed manufacturing unit.
(2.)SocialThe local peoples’ interest towards education will increase due to the expectation of getting jobs, especially from non-agricultural sources such as the industries in the vicinity of M/s Swastik Chloroffin LLP. The project is expected to increase such aspirations by bringing opportunities of some direct and indirect employment for the local people.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA0037
(ii)Name of the EIA Consultant Vardan Environet
(iii)Address D-142, Golf course Ext Rd, Sushant Lok III, Sector 57, Gurgaon- 122002
(iv)Mobile No. 9953147268
(v)Landline No. 0124429103
(vi)Email Id industry@vardanenvironet.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 09 Nov 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAPlease inform/clarify the following:- - Whether the proposed industrial operations at the identified site are in conformity with the permitted land use of the area. That needs to be clarified along with the supporting documents. - Present status of the required clearance for ground water withdrawal of 93 cum/day. 16 Dec 2018
2.NAThe correction have been made as per the instruction received 17 Dec 2018
3.NAPlease confirm whether change of land use for commercial purposes, allows the proposed industrial operations at the identified site. Also, please inform present status of clearance required for ground water withdrawal. 28 Dec 2018
4.NAThe correction have been made as per the instruction received 29 Dec 2018
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantJitesh Nenwani
DesignationPartner
Name of Company (Applicant Name should not be given here)SWASTIK CHLOROFFIN L L P
Address4656/15, Jai Mata Market, Tri Nagar, Delhi
Print