|
1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Expansion of Molasses Based Distillery (18 to 30 KLPD) along with the installation of 2 KLPD Malt Spirit Plant within the existing plant premises at Village Begumabad, Tehsil Modinagar, District Ghazi | (b)Name of the Company / Organisation | MODI DISTILLERY (A UNIT OF MODI INDUSTRIES LIMITED) | (c)Registered Address | Modi Distillery (A unit of Modi Industries Limited), Modi Nagar,District Ghaziabad (UP),Ghaziabad,Uttar Pradesh-201204 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Mukesh Kumar Sharma | (b)Designation (Owner/ Partner/ CEO) | General Manager (Plant) | (c)Address | Modi Distillery (A unit of Modi Industries Limited), Modi Nagar,District Ghaziabad (UP),Modinagar,Ghaziabad,Uttar Pradesh-201204 | (d)Pin code | 201204 | (e)E-mail | mukesh@modisugar.com | (f)STD Code. | 9219(f)Telephone No. | 440616 | (g)Fax No. | 242532 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 5(g) Distilleries
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/UP/IND2/87888/2016 | (d)Master Proposal Number(Single Window) | SW/82886/2018 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 2 | (f)Project Type | Expansion |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | 922, 896, 449 and 466 | (b)Pincode | 201204 | (c)Bounded Latitudes (North) | | From | | Degree | 28.82666667 | Minutes | | Second | | From | | Degree | 28.82805556 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 77.56777778 | Minutes | | Second | | From | | Degree | 77.56916667 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 53H5, 53H9, 53H10 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 225 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 15 | (j)Seismic Zone | 4 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Uttar Pradesh | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | J-11011/378/2016-IA II (I) | (c)Date of Issue of TOR | 29 Apr 2017 | (f)Previous TOR Letter | Copy of Previous TOR letter | (b)Date of Apply of EC | 21 Jan 2019 | (c)Date of Issue of EC | 17 Jun 2019 | (d)Previous EC Letter | Copy of Previous EC letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 16 Apr 2018 | Distance of Public Hearing Venue from the Proposed Project : | 0 |
| Plant Site | State : | Uttar Pradesh | District : | Ghaziabad | Tehsil : | Modinagar | Village : | Begumabad (Modinagar) |
| 72 | Additional Pollution, drinking water facilities under CSR, Odor problem, Insects near distillery unit, Sugar mill emissions | Others | Additional District Magistrate | |
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | SPCB | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | | (iii)Letter No. | 3602/C/M-23/2018 | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Jan 8 2018 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Distillery Plant - ENA/RS/Ethanol | 18 | 12 | 30 | Kilo Litre per Day(KLD) | | Road | | (2.) | Malt Spirit | 0 | 2 | 2 | Kilo Litre per Day(KLD) | | Road | | (3.) | Power | 0 | 0.5 | 0.5 | Mega Watt(MW) | | Others | Cables | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | Molasses Based Distillery | 18 | 12 | 30 | KLPD | (2.) | Malt Spirit Plant | 0 | 2 | 2 | KLPD | (3.) | Co-generation Power Plant | 0 | 0.5 | 0.5 | MW | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 16 Apr 2018 | (iv)Valid Upto | 31 Dec 2019 | (v)File No. | 15437/UPPCB/ Ghaziabad (UPPCBRO)/ CTO/air/ GHAZIAB | (vi)Application No. | 15443/UPPCB/ Ghaziabad (UPPCBRO)/ CTO/water/ GHAZI | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 20 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 5 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0.5 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 1 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 16500 | (b)Existing quantity of raw material/fuel | 26400 | (c)Total quantity of raw material/fuel | 42900 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Barley for malting | 1320 | Tons per Annum | | Nearby Areas | Road | | 300 | Open Market | | Copy of Linkage | (2.) | Bagasse as fuel for co generation power plant | 6600 | Tons per Annum | | Own Sugar Mill | Conveyor Belt,Others | trolleys | 0.2 | Others | Own Sugar Mill | Copy of Linkage | (3.) | Biogas | 4620000 | Others | Cubic meter | Own Plant | Others | Through Pipelines | 0.2 | Others | Own Plant | Copy of Linkage | (4.) | Molasses as raw material for distillery | 42900 | Tons per Annum | | Own Sugar Mill | Pipe Conveyor | Pipelines | 0.5 | Others | Own Sugar Mill | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Mar 2017 To 31 May 2017 | (b)Season | Summer | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM10 | | Micro Gram per Meter Cube | 95.7 | 62.3 | 95.4 | 100 | (2.) | PM2.5 | | Micro Gram per Meter Cube | 56.3 | 26.3 | 55.67 | 60 | (3.) | NOx | | Micro Gram per Meter Cube | 24.1 | 7.2 | 23.86 | 80 | (4.) | SO2 | | Micro Gram per Meter Cube | 12.6 | 5.3 | 12.51 | 80 | |
14.2. No. of Ground Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | Fluoride | | | mg/l | | 0.24 | 0.11 | 1 | 1.5 | (2.) | TDS | | | mg/l | | 850 | 435 | 500 | 2000 | (3.) | Total Hardness | | | mg/l | | 520 | 236.6 | 200 | 600 | (4.) | TSS | | | mg/l | | 0 | 0 | 0 | 0 | (5.) | Chlorides | | | mg/l | | 148.03 | 15.31 | 250 | 1000 | (6.) | pH | | | NA | | 7.92 | 7.23 | 6.5 | 8.5 | |
14.3. No. of Surface Water monitoring locations : 2 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | DO | | mg/l | | 5.50 | 5.20 | B | (2.) | COD | | mg/l | | 32.4 | 25.0 | E | (3.) | pH | | NA | | 7.20 | 7.13 | E | (4.) | BOD | | mg/l | | 11.9 | 6.8 | E | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 67.4 | 48.4 | 75 Industrial and 55 Residential | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 58.3 | 41.5 | 70 Industrial and 45 Residential | |
14.5. No. of Soil Sample Monitored locations : 8 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | Others | NA | 7.82 | 7.38 | (2.) | K(Potassium) | Kilogram per hectare | | 105.63 | 79.10 | (3.) | P(Phosphorus) | Kilogram per hectare | | 21.36 | 13.95 | (4.) | Electric Conductivity | Millisiemens per Centimetre | | 0.35 | 0.24 | (5.) | N(Nitrogen) | Kilogram per hectare | | 316.10 | 260.68 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 18.32 To 4.77 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 18.05 To 4.00 | (c)Whether Ground Water Intersection will be there ? | NA | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | GroundWater | | 250 | 0 | Copy of Permission Letter | Pipeline | | Tube Well | | CGWA/NOC/ IND/ ORIG/2018/3538 | 16 May 2018 | 261.15 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Industrial CPU | 309 | 500 | Aeration with Filters | Reuse within the Plant & Recycling | | 309 | | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 309 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 309 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Bio-compost | Industrial Waste | | 9528 | Tons | 50 | Road | | Others | Given to Farmers as manure | (2.) | Ash | Fly Ash | | 66 | Tons | 0.5 | Road,Others | use in Bio-composting | Others | Bio-composting and Supplied to Brick manufacturers | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | NOx | | Microgram per Meter Cube | 23.3 | 1 | 1.10 | 24.4 | 80 | (2.) | PM10 | | Microgram per Meter Cube | 94.7 | 1 | 0.29 | 94.99 | 100 | (3.) | PM2.5 | | Microgram per Meter Cube | 54.2 | 1 | 0.14 | 54.34 | 60 | (4.) | SO2 | | Microgram per Meter Cube | 12.3 | 1 | 1.18 | 13.48 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Boiler (5TPH) | Biogas and Bagasse | 30 | 1 | PM10 | | 50 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 400 | (b)Source | 0.5 MW Co-generation Power Plant | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 500 KVA | (e)Stack Height (in m) | 10 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 0 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 5 | Total Land (ha.) | 5 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 0 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 5 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : Expansion within Plant | 0 | Total (ha.) | 5 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 1 | | (2.) | Green belt | | 1.65 | | (3.) | Area for Solid Waste Management | | 2.35 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | WLS | Not Applicable | 0 | No WLS within 10 km radius | (2.) | ESAs | Not Applicable | 0 | No ESAs within 10 km radius | (3.) | ESZs | Not Applicable | 0 | No ESZs within 10 km radius | (4.) | Corridors | Not Applicable | 0 | No Corridors within 10 km radius | (5.) | Critically Polluted Area | Not Applicable | 0 | No CPA within 10 km radius | (6.) | NPA | Not Applicable | 0 | No NPS within 10 km radius | (7.) | Wildlife Corridors | Not Applicable | 0 | No Wildlife Corridors within 10 km radius | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Defence Installations | | Not Applicable | 0 | No Defence installation within 10 km radius | (2.) | Forest | | Not Applicable | 0 | No Forest within 10 km radius | (3.) | Archaeological Sites | | Not Applicable | 0 | No Archaeological sites within 10 km radius | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 5 | (b)Land yet to be acquired(Ha) | 5 | (c)Status of Land acquisition if not acquired | Already under possession | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Kharauli Drain | (ii)Direction of Water Bodies in Buffer Area | North East | (iii)Distance of Water Bodies in Buffer Area | 3.2 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 129 | (c)Temporary Employment- During Construction | 50 | (d)Temporary Employment- During Operation | 50 | (e)No. of working days | 330 | (f)Total Manpower | 229 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 1.65 | 0 | 1.65 | (2.) | Percentage of Total Project Area | 33 | 0 | 33 | (3.) | No. of Plants | 700 | 2500 | 3200 | (4.) | Funds Allocated | 200000 | 250000 | 450000 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Environmental | The project will help fulfilling the demand for ETHANOL | (2.) | Social | Employment generation | (3.) | Financial | Improved Livelihood with increased business opportunities | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 2 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1619/RA 0069 | (ii)Name of the EIA Consultant | JM EnviroNet Pvt. Ltd. | (iii)Address | 202 A, ABW Tower, MG Road, Gurugram (Haryana) | (iv)Mobile No. | 9015209362 | (v)Landline No. | 9015209362 | (vi)Email Id | jmenviron@hotmail.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 2 | (ix)Validity of Accreditation | 18 May 2019 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | - Please inform about EC for the present molasses based distillery of 18 KLPD, and the compliance status thereof.
- Whether the projected fresh water requirement of 250 cum/day would cater to the proposed expansion also. | 15 Dec 2018 | 2. | NA | The correction have been made as per the instruction received | 20 Dec 2018 | 3. | NA | In view of the clarification to our earlier observations, please confirm whether the proposed expansion would be achieved with up-gradation of the plant and there would be no increase in pollution load. Also please confirm the requirement of EC for the proposed 2 KLPD malt spirit plant vis-a-vis the schedule to the EIA Notification, 2006. | 29 Dec 2018 | 4. | NA | The correction have been made as per the instruction received | 03 Jan 2019 | 5. | NA | The proposal actually involves modernization cum expansion of distillery and needs to be examined vis-a-vis this Ministry's Notification dated 23/11/2016 for the requirement of EC. Proposed malt spirit plant of 2 KLPD requires appraisal/approval at the State level.
In addition, requirement of 250 cum/day of ground water to meet present production of 18 KLPD is not justified and needs to be reworked out. | 13 Jan 2019 | 6. | NA | The correction have been made as per the instruction received | 21 Jan 2019 | |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Mukesh Kumar Sharma | Designation | General Manager (Plant) | Name of Company (Applicant Name should not be given here) | MODI DISTILLERY (A UNIT OF MODI INDUSTRIES LIMITED) | Address | Modi Distillery (A unit of Modi Industries Limited), Modi Nagar |
|