Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Expansion of Molasses Based Distillery (18 to 30 KLPD) along with the installation of 2 KLPD Malt Spirit Plant within the existing plant premises at Village Begumabad, Tehsil Modinagar, District Ghazi
(b)Name of the Company / Organisation MODI DISTILLERY (A UNIT OF MODI INDUSTRIES LIMITED)
(c)Registered Address Modi Distillery (A unit of Modi Industries Limited), Modi Nagar,District Ghaziabad (UP),Ghaziabad,Uttar Pradesh-201204
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Mukesh Kumar Sharma
(b)Designation (Owner/ Partner/ CEO) General Manager (Plant)
(c)Address Modi Distillery (A unit of Modi Industries Limited), Modi Nagar,District Ghaziabad (UP),Modinagar,Ghaziabad,Uttar Pradesh-201204
(d)Pin code 201204
(e)E-mail mukesh@modisugar.com
(f)STD Code. 9219(f)Telephone No. 440616
(g)Fax No. 242532
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(g) Distilleries
Minor Activity
(b)Category A
(c)Proposal Number IA/UP/IND2/87888/2016
(d)Master Proposal Number(Single Window) SW/82886/2018
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 922, 896, 449 and 466
(b)Pincode 201204
(c)Bounded Latitudes (North)
From
Degree 28.82666667
Minutes
Second
From
Degree 28.82805556
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 77.56777778
Minutes
Second
From
Degree 77.56916667
Minutes
Second
(e)Survey of India Topo Sheet No. 53H5, 53H9, 53H10
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 225
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 15
(j)Seismic Zone 4
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Uttar Pradesh
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-11011/378/2016-IA II (I)
(c)Date of Issue of TOR 29 Apr 2017
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 21 Jan 2019
(c)Date of Issue of EC 17 Jun 2019
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :15 Mar 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :16 Apr 2018
Distance of Public Hearing Venue from the Proposed Project :0
Plant Site
State :Uttar Pradesh
District :Ghaziabad
Tehsil :Modinagar
Village :Begumabad (Modinagar)
72Additional Pollution, drinking water facilities under CSR, Odor problem, Insects near distillery unit, Sugar mill emissionsOthersAdditional District Magistrate
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By SPCB
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on
(iii)Letter No. 3602/C/M-23/2018
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Jan 8 2018 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Distillery Plant - ENA/RS/Ethanol181230Kilo Litre per Day(KLD)Road
(2.)Malt Spirit022Kilo Litre per Day(KLD)Road
(3.)Power00.50.5Mega Watt(MW)OthersCables
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Molasses Based Distillery181230KLPD
(2.)Malt Spirit Plant022KLPD
(3.)Co-generation Power Plant00.50.5MW
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 16 Apr 2018
(iv)Valid Upto 31 Dec 2019
(v)File No. 15437/UPPCB/ Ghaziabad (UPPCBRO)/ CTO/air/ GHAZIAB
(vi)Application No. 15443/UPPCB/ Ghaziabad (UPPCBRO)/ CTO/water/ GHAZI
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 20
(b) Funds Allocated for Environment Management (Capital) (in Crores) 5
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.5
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 1
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 16500
(b)Existing quantity of raw material/fuel 26400
(c)Total quantity of raw material/fuel 42900
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Barley for malting1320Tons per AnnumNearby AreasRoad300 Open MarketCopy of Linkage
(2.)Bagasse as fuel for co generation power plant6600Tons per AnnumOwn Sugar MillConveyor Belt,Otherstrolleys0.2 OthersOwn Sugar MillCopy of Linkage
(3.)Biogas4620000OthersCubic meterOwn PlantOthersThrough Pipelines0.2 OthersOwn PlantCopy of Linkage
(4.)Molasses as raw material for distillery42900Tons per AnnumOwn Sugar MillPipe ConveyorPipelines0.5 OthersOwn Sugar MillCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2017 To 31 May 2017
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube95.762.395.4100
(2.)PM2.5Micro Gram per Meter Cube56.326.355.6760
(3.)NOxMicro Gram per Meter Cube24.17.223.8680
(4.)SO2Micro Gram per Meter Cube12.65.312.5180
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Fluoridemg/l0.240.1111.5
(2.)TDSmg/l8504355002000
(3.)Total Hardnessmg/l520236.6200600
(4.)TSSmg/l0000
(5.)Chloridesmg/l148.0315.312501000
(6.)pHNA7.927.236.58.5
    14.3.     No. of Surface Water monitoring locations : 2
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l5.505.20B
(2.)CODmg/l32.425.0E
(3.)pHNA7.207.13E
(4.)BODmg/l11.96.8E
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))67.448.475 Industrial and 55 Residential
(2.)Leq(Night)A-weighted decibels(dB(A))58.341.570 Industrial and 45 Residential
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pHOthersNA7.827.38
(2.)K(Potassium)Kilogram per hectare105.6379.10
(3.)P(Phosphorus)Kilogram per hectare21.3613.95
(4.)Electric ConductivityMillisiemens per Centimetre0.350.24
(5.)N(Nitrogen)Kilogram per hectare316.10260.68
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 18.32 To 4.77
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 18.05 To 4.00
(c)Whether Ground Water Intersection will be there ? NA
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater2500Copy of Permission LetterPipelineTube WellCGWA/NOC/ IND/ ORIG/2018/353816 May 2018261.15
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Industrial CPU309500Aeration with FiltersReuse within the Plant & Recycling309
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 309
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 309
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Bio-compostIndustrial Waste9528Tons50RoadOthersGiven to Farmers as manure
(2.)AshFly Ash66Tons0.5Road,Othersuse in Bio-compostingOthersBio-composting and Supplied to Brick manufacturers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)NOxMicrogram per Meter Cube23.311.1024.480
(2.)PM10Microgram per Meter Cube94.710.2994.99100
(3.)PM2.5Microgram per Meter Cube54.210.1454.3460
(4.)SO2Microgram per Meter Cube12.311.1813.4880
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Boiler (5TPH)Biogas and Bagasse301PM1050
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 400
(b)Source 0.5 MW Co-generation Power Plant
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 500 KVA
(e)Stack Height (in m) 10
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 5
    Total Land (ha.) 5
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 5
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Expansion within Plant 0
    Total (ha.) 5
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant1
(2.)Green belt1.65
(3.)Area for Solid Waste Management2.35
Total (ha.) 5
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSNot Applicable0No WLS within 10 km radius
(2.)ESAsNot Applicable0No ESAs within 10 km radius
(3.)ESZsNot Applicable0No ESZs within 10 km radius
(4.)CorridorsNot Applicable0No Corridors within 10 km radius
(5.)Critically Polluted AreaNot Applicable0No CPA within 10 km radius
(6.)NPANot Applicable0No NPS within 10 km radius
(7.)Wildlife CorridorsNot Applicable0No Wildlife Corridors within 10 km radius
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Defence InstallationsNot Applicable0No Defence installation within 10 km radius
(2.)ForestNot Applicable0No Forest within 10 km radius
(3.)Archaeological SitesNot Applicable0No Archaeological sites within 10 km radius
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 5
(b)Land yet to be acquired(Ha) 5
(c)Status of Land acquisition if not acquired Already under possession
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Kharauli Drain
(ii)Direction of Water Bodies in Buffer Area North East
(iii)Distance of Water Bodies in Buffer Area 3.2
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 129
(c)Temporary Employment- During Construction 50
(d)Temporary Employment- During Operation 50
(e)No. of working days 330
(f)Total Manpower 229
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt1.6501.65
(2.)Percentage of Total Project Area33033
(3.)No. of Plants70025003200
(4.)Funds Allocated200000250000450000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalThe project will help fulfilling the demand for ETHANOL
(2.)SocialEmployment generation
(3.)FinancialImproved Livelihood with increased business opportunities
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA 0069
(ii)Name of the EIA Consultant JM EnviroNet Pvt. Ltd.
(iii)Address 202 A, ABW Tower, MG Road, Gurugram (Haryana)
(iv)Mobile No. 9015209362
(v)Landline No. 9015209362
(vi)Email Id jmenviron@hotmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 18 May 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NA- Please inform about EC for the present molasses based distillery of 18 KLPD, and the compliance status thereof. - Whether the projected fresh water requirement of 250 cum/day would cater to the proposed expansion also. 15 Dec 2018
2.NAThe correction have been made as per the instruction received 20 Dec 2018
3.NAIn view of the clarification to our earlier observations, please confirm whether the proposed expansion would be achieved with up-gradation of the plant and there would be no increase in pollution load. Also please confirm the requirement of EC for the proposed 2 KLPD malt spirit plant vis-a-vis the schedule to the EIA Notification, 2006. 29 Dec 2018
4.NAThe correction have been made as per the instruction received 03 Jan 2019
5.NAThe proposal actually involves modernization cum expansion of distillery and needs to be examined vis-a-vis this Ministry's Notification dated 23/11/2016 for the requirement of EC. Proposed malt spirit plant of 2 KLPD requires appraisal/approval at the State level. In addition, requirement of 250 cum/day of ground water to meet present production of 18 KLPD is not justified and needs to be reworked out. 13 Jan 2019
6.NAThe correction have been made as per the instruction received 21 Jan 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantMukesh Kumar Sharma
DesignationGeneral Manager (Plant)
Name of Company (Applicant Name should not be given here)MODI DISTILLERY (A UNIT OF MODI INDUSTRIES LIMITED)
AddressModi Distillery (A unit of Modi Industries Limited), Modi Nagar
Print