Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) P V Narasimha Rao Kanthanapally Sujala Sravanthi Project, Thupakulagudem village, Eturnagaram Mandal, Jayashankar Bhupalapally District, Telangana
(b)Name of the Company / Organisation CHIEF ENGINEER GLIS WARANGAL
(c)Registered Address Chief Engineer, Godavari Lift Irrigation Scheme, KC Colony, Chinthagattu, Hanamkonda, Warangal (Urban),,Warangal,Telangana-506015
(d)Legal Status of the Company State Government
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Venkateshwarlu B
(b)Designation (Owner/ Partner/ CEO) CE
(c)Address Chief Engineer, Godavari Lift Irrigation Scheme, KC colony, Chinthagattu, Hanamkonda, Warangal Urban,,Warangal,Warangal,Telangana-506015
(d)Pin code 506015
(e)E-mail cegliswgl@gmail.com
(f)STD Code. 870(f)Telephone No. 2460698
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity1(c) River Valley projects
Minor Activity
(b)Category A
(c)Proposal Number IA/TG/RIV/87571/2017
(d)Master Proposal Number(Single Window) SW/87569/2018
(e)EAC concerned (for category A Projects only) River Valley and Hydroelectric Projects
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Thupakulagudem village Eturnagaram Mandal Bhupalpa
(b)Pincode 506165
(c)Bounded Latitudes (North)
From
Degree 18.3502
Minutes
Second
From
Degree 18.3519
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 80.2314
Minutes
Second
From
Degree 80.2349
Minutes
Second
(e)Survey of India Topo Sheet No. 65B6
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 83
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0.5
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Telangana
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number J-12011/1/2010-IA
(b)Date of Apply of TOR 22 Feb 2017
(c)Date of Issue of TOR / Standard ToR 03 Apr 2017
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :27 Aug 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :27 Sep 2018
Distance of Public Hearing Venue from the Proposed Project :27.41
Zilla Parishad High School, Eturnagaram, Jayashankar Bhupalapally District
State :Telangana
District :Warangal
Tehsil :Eturnagaram
Village :Etrunagaram
80The participants suggest to implement environmental mitigation measures and supported the project for early implementation to stablise the command areas of Devadula LIS and SRSP Satge - I and II ProjeDistrict Collector
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)1132 mBarrage
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)555310555310HectaresRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 2121
(b) Funds Allocated for Environment Management (Capital) (in Crores) 163.65
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 2.53
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.17
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? Yes
a)Protected areas notified under the wildlife (Protection) Act, 1972 Yes
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 26945
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 26945
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)coarse aggregate26945OthersCumHyderabadRoad235 CaptiveCopy of Linkage
(2.)Earth work3221797OthersCumGodavari riverConveyor Belt0 CaptiveCopy of Linkage
(3.)concrete54515OthersCumHyderabadRoad235 CaptiveCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Jul 2017 To 31 Mar 2018
(b)Season Pre-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube704067.05100
(2.)NOxMicro Gram per Meter Cube34.829.5232.7780
(3.)SO2Micro Gram per Meter Cube5.643.895.5380
(4.)PM2.5Micro Gram per Meter Cube251122.7060
    14.2.     No. of Ground Water monitoring locations : 25
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TSSmg/l29500
(2.)Heavy Metalsleadmg/l0.0110.010.010
(3.)Fluoridemg/l1.390.6011.5
(4.)Total Hardnessmg/l1190102200600
(5.)Chloridesmg/l1174.1024.502501000
(6.)pHNA8.016.756.58.5
(7.)TDSmg/l37384185002000
    14.3.     No. of Surface Water monitoring locations : 10
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)CODmg/l9216D
(2.)pHNA8.147.02A
(3.)DOmg/l5.53.3C
(4.)BODmg/l448D
    14.4.     No. of Ambient Noise monitoring locations : 6
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))53.5848.9855
(2.)Leq(Night)A-weighted decibels(dB(A))42.7239.3445
    14.5.     No. of Soil Sample Monitored locations : 15
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)P(Phosphorus)Kilogram per hectare1187.5267.21
(2.)Electric ConductivityMillisiemens per Centimetre905151
(3.)N(Nitrogen)Kilogram per hectareNA480.6594.58
(4.)K(Potassium)Milligram per Kilogram0.080.00078
(5.)pHOthersNA8.766.3
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 24 To 3
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 150 To 81
(c)Whether Ground Water Intersection will be there ? NA
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface10090Copy of Permission LetterCanalBarrage1413 Feb 2017100
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Labor camps3025Extended AerationReuse within the Plant & Recycling30
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 30
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 30
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Labor campsMunicipal Solid Waste65.7Tons27RoadSanitary Landfills
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube7055.331.7100
(2.)PM2.5Microgram per Meter Cube00000
(3.)NOxMicrogram per Meter Cube00000
(4.)SO2Microgram per Meter Cube00000
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)0000PM100
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 1500
(b)Source TSTRANSCO
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 500 KVA x 2
(e)Stack Height (in m) 4
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 94
(c)Government Land (ha.) 580
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 554636
    Total Land (ha.) 555310
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 983718
(b)Waste/Barren Land (ha.) 4898
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 68767
(e)Settlements (ha.) 26517
(f)Industrial (ha.) 0
(g)Forest (ha.) 180549
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : NA 0
    Total (ha.) 1264449
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)OthersBarrage and submergence674
Total (ha.) 674
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSEturnagaram WLS0.5Adjacent
(2.)ESZsEturnagaram WLS0.5No forest land required
(3.)NPA000
(4.)Critically Polluted Area000
(5.)ESAs000
(6.)Corridors000
(7.)Wildlife Corridors000
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestEturnagaram WLS0.5No forest land required
(2.)Defence Installations000
(3.)Archaeological Sites000
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 800
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 65
(b)Land yet to be acquired(Ha) 29
(c)Status of Land acquisition if not acquired Under process
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Yet To Start
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Shikra, Jerdon’s courser, Indian peafowl, Common buzzard and Booted eagle
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 200000
(iii)Period of Implementation 3 years
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Godavari river and other tanks in the command area
(b)Whether there is Diversion Required ? Yes
(i)Details of Diversion Required 100 TMC of water is proposed to be diverted
(ii)Details of Study Conducted DPR prepared by the WAPCOS
(c)Whether permission has been obtained from competent authority ? Yes
(i)Uploaded copy of permission Copy of permission
(ii)Letter No. 1443
(iii)Date of issue 01 Nov 2006
(iv)Recommendation NA
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 50
(b)Permanent Employment-During Operation 0
(c)Temporary Employment- During Construction 350
(d)Temporary Employment- During Operation 0
(e)No. of working days 750
(f)Total Manpower 400
32.
Green Belt in Ha:
(a)Total Area of Green Belt 26
(b)Percentage of Total Project Area 0.00
(c)No. of Plants to be Planted 2400
(d)Funds Allocated for Plantation 1400000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.       Project Benefits
S. No. Type of Project BenefitsDetails of Project Benefits
NIL
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For River Valley and Hydroelectric Projects
S. No.Item Details
1. Project Sub Sector Irrigation Project
2. Name of the River Godavari
3.
Whether Cumulative Impact Assessment and Carrying Capacity Study of River Basin is Carried Out? No
     4.      Type of Project: (Construction of Dam/ Barrage/ Run of the River/ Lift Irrigation Scheme)
S. No.Project TypeDam Height (in meters)Dam Length (in meters)Total Submergence Area (in hectare)Gross Command Area (GCA) (in hectare)Irrigable Command Area (ICA) (in hectare)Culturable Command Area (CCA) (in hectare)Total Command Area (in hectare)
(1.)Barrage01132580555310555310555310555310
5.
Powerhouse Installed Capacity No
(a) Type of Powerhouse Underground
(b) Capacity (in megawatts) 0
(c) No. of Tunnels 0
(d) No. of Units 0
(e) Bank of River Left
6.
Generation of Electricity Annually.
(a) Quantity of Generation of Electricity Annually (in giga watt hours) 0
(b) Water Availability at Various percentage
S. No.PercentageWater availability (in cusecs)Dependable yearRemarks
(1.)50 %66582542013
(2.)75 %44320022013
(3.)90 %35446022013
(c) Machine Availability (in percent) 0
(d) Cost of Electricity Generation (in INR) 0
(e) Internal Rate of Return (in percent) 0
(f) Year of achievement of Internal Rate of Return 0
7. Catchment Area Treatment Plan Copy of Catchment Plan
8.
Muck Management Plan
(a)Muck Management Plan Copy of Muck Management Plan
(b) Total Excavation Muck (in cubic meter) 3272754
(c) Utilized for Construction (in cubic meter)3272754
(d) No. of Muck Disposal sites1
(e) Total Muck Disposal Area (in hectare)25
9.
Fishery Development and Management Plan
(a)Fishery Development and Management Plan Copy of Fishery Development and Management Plan
(b) No. of Fish Species 105
(c) Name of the umbrella Fish Species (Scientific Name)Tor Khudree, Neolissochilus hexagonolepis, Systomu
10.
Status of Environmental Flow
S. No.SeasonAverage Inflow (in cumec)Percent of Flow
(1.)Lean3977.35.78
(2.)Monsoon6438293.64
(3.)Non-Lean Non-Monsoon6438293.64
11. Free Flow Stretch (in km) 25
12.
Approval of Central Water Commission Yes
(a)Approval Reference No. 1443
(a)Date of Approval 01 Nov 2006
(a)Copy of Approval Copy of approval
13.
Approval of Central Electricity Authority No
14.
Details of Coffer Dam (Upstream) None
15.
Details of Coffer Dam (Downstream) None
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. 00732
(ii)Name of the EIA Consultant Environmental Health and Safety Consultants Pvt Lt
(iii)Address No 13/2 First Main road Near Fire Station Industiral Town Rajajinagar Bangalore 560010
(iv)Mobile No. 9448094164
(v)Landline No. 0802301620
(vi)Email Id ehscblr@yahoo.com
(vii)Category of Accreditation B
(viii)Sector of Accreditation River Valley and Hydroelectric Projects
(ix)Validity of Accreditation 14 Feb 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterDear Sir, Please find enclosed the Additional Details for according Environmental Clearance to the Project. Yours faithfully, Chief Engineer Kanthanapally Project, Warangal, Telangana 23 Jul 2020
2.NAAs Chhattisgarh state boundary is only 2.5 km from the project site, what is extent of submergence area and mitigation steps to avoid submergence in the territory of Chhattisgarh. Please submit the information through Parivesh at the earliest. 14 Jul 2020
3. ADS Reply LetterDear Sir Please find enclosed the Stage- I FC and NBWL recommendation for the project. It is requested to issue the EC for the project at the earliest. Yours faithfully Chief Engineer Kantanapally Project I&CAD Dept., Govt. of Telangana 04 May 2020
4.NAProposal is listed in the 27th EAC meeting to be held on 23.09.2019 for reconsideration on the recommendations of the EAC and further deliberation on the utilization of water available to the projects in Godavari Basin, Telangana State, Forest Land issue and non-forestry activities depicted in the project boundary. PP alongwith the consultant is required to attend the meeting on the scheduled date. 18 Sep 2019
5. ADS Reply LetterDear Sir Please find enclosed the Additional Details along with Revised EIA report for according Environmental Clearance to the Project. Yours faithfully Chief Engineer Kanthanapally Project Warangal, Telangana 30 Apr 2019
6.NANA 19 Feb 2019
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantVenkateshwarlu B
DesignationCE
Name of Company (Applicant Name should not be given here)CHIEF ENGINEER GLIS WARANGAL
AddressChief Engineer, Godavari Lift Irrigation Scheme, KC Colony, Chinthagattu, Hanamkonda, Warangal (Urban)
Print