Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Manufacturing of New Technical grade pesticide by M/S Samradhi Crop Chemicals Pvt Ltd
(b)Name of the Company / Organisation M/S SAMRADHI CROP CHEMICAL PVT LTD
(c)Registered Address Plot no. HD 20,21,22 & Plot no. HE-27,28,29 & 30, UPSIDC Industrial Area, Sikandrabad,Dist. Bulandshahr, UP,,Bulandshahr,Uttar Pradesh-203205
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant RAJPAL SINGH
(b)Designation (Owner/ Partner/ CEO) Director
(c)Address Plot No. HD 20,21,22 Plot No. HE- 27,28,29 and 30, UPSIDC Industrial Area, Sikandrabad, Dist- Bulandshahr ,UP,,Sikandrabad,Bulandshahr,Uttar Pradesh-203205
(d)Pin code 203205
(e)E-mail samradhicropnew@gmail.com
(f)STD Code. 11(f)Telephone No. 30003211
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(b) Pesticides industry and pesticide specific intermediates (excluding formulations)
Minor Activity
(b)Category A
(c)Proposal Number IA/UP/IND2/87428/2018
(d)Master Proposal Number(Single Window) SW/87375/2018
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Plot no. HD 20,21,22 & Plot no. HE- 27,28,29 & 30
(b)Pincode 203205
(c)Bounded Latitudes (North)
From
Degree 28.483982
Minutes
Second
From
Degree 28.484051
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 77.652893
Minutes
Second
From
Degree 77.653140
Minutes
Second
(e)Survey of India Topo Sheet No. 53 H10,53 H11, 53 H14, 53 53 H15
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 186
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0.0
(j)Seismic Zone 4
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Uttar Pradesh
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number No. IA-J-11011/76/2017-IA-II(I)
(b)Date of Apply of TOR 02 Jun 2018
(c)Date of Issue of TOR / Standard ToR 06 Jul 2018
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason UPSIDC Sikandrabad industrial area
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Production plants including ware house utilities0.2025 ha
(2.)Scrape yards0.065 ha
(3.)waste management facilities0.070 ha
(4.)Roads,Pathway & Auxillary0.710 ha
(5.)Open area for future expansion0.330 ha
(6.)Green belt/Plantation0.1600 ha
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Metribuzine (Weedicides )15Tons per AnnumRoad
(2.)Glyphosate (Weedicides)30Tons per AnnumRoad
(3.)Pretilachlor(Weedicides )30Tons per AnnumRoad
(4.)2,4-D Acid(Weedicides )300Tons per AnnumRoad
(5.)Imidacloprid (Insecticide )15Tons per AnnumRoad
(6.)2,4-D Ethyl Ester(Weedicides )100Tons per AnnumRoad
(7.)Fipronil(Insecticide )15Tons per AnnumRoad
(8.)Azoxystrobin (Fungicide)15Tons per AnnumRoad
(9.)Thiomethoxam (Insecticide )60Tons per AnnumRoad
(10.)Bifenthrin (Insecticide )15Tons per AnnumRoad
(11.)Diafenthiuron (Insecticide )15Tons per AnnumRoad
(12.)2,4-D Sodium Salt(Weedicides )150Tons per AnnumRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 5
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.70
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 10
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 16
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 139.495
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 139.495
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Formaldehyde6Tons per AnnumDomesticRoad650 Open MarketCopy of Linkage
(2.)Phosphorous trichloride30Tons per AnnumDomesticRoad700 Open MarketCopy of Linkage
(3.)Sodium hydroxide36Tons per AnnumDomesticRoad600 Open MarketCopy of Linkage
(4.)HCl66Tons per AnnumDomesticRoad600 Open MarketCopy of Linkage
(5.)2,6Diethyl aniline bromo 210.8Tons per AnnumDomesticRoad600 Open MarketCopy of Linkage
(6.)proproxyethane11.76Tons per AnnumDomesticRoad700 Open MarketCopy of Linkage
(7.)Chloro Acetyl Chloride7.2Tons per AnnumDomesticRoad600 Open MarketCopy of Linkage
(8.)Tri ethylamine6.24Tons per AnnumDomesticRoad700 Open MarketCopy of Linkage
(9.)BPC7.8Tons per AnnumDomesticRoad600 Open MarketCopy of Linkage
(10.)DMF132Tons per AnnumDomesticRoad600 Open MarketCopy of Linkage
(11.)Sodium Bicarbonate4.8Tons per AnnumDomesticRoad400 Open MarketCopy of Linkage
(12.)Ethylene Di Chloride78Tons per AnnumDomesticRoad400 Open MarketCopy of Linkage
(13.)Tri floro methane sulfinyl chloride1.44Tons per AnnumDomesticRoad450 Open MarketCopy of Linkage
(14.)trimethyl amine hydrochloride7.8Tons per AnnumDomesticRoad300 Open MarketCopy of Linkage
(15.)AIBN0.3Tons per AnnumDomesticRoad400 Open MarketCopy of Linkage
(16.)PPN6Tons per AnnumDomesticRoad600 Open MarketCopy of Linkage
(17.)NaCl1.2Tons per AnnumDomesticRoad500 Open MarketCopy of Linkage
(18.)Methanol66Tons per AnnumDomesticRoad500 Open MarketCopy of Linkage
(19.)Chlorine60Tons per AnnumDomesticRoad480 Open MarketCopy of Linkage
(20.)C C M T60Tons per AnnumDomesticRoad500 Open MarketCopy of Linkage
(21.)MPNO48Tons per AnnumDomesticRoad500 Open MarketCopy of Linkage
(22.)Dichloro phenol96Tons per AnnumDomesticRoad600 Open MarketCopy of Linkage
(23.)Hydrochloric Acid60Tons per AnnumDomesticRoad600 Open MarketCopy of Linkage
(24.)ethyl alcohol9.6Tons per AnnumDomesticRoad600 Open MarketCopy of Linkage
(25.)Tert butylamine3.6Tons per AnnumDomesticRoad700 Open MarketCopy of Linkage
(26.)methyl-3-methoxy-2-2-6-chloropyrimidine15.36Tons per AnnumDomesticRoad500 Open MarketCopy of Linkage
(27.)2-cyano phenol15.6Tons per AnnumDomesticRoad500 Open MarketCopy of Linkage
(28.)cupric chloride4.8Tons per AnnumDomesticRoad500 Open MarketCopy of Linkage
(29.)Dimethyl formamide60Tons per AnnumDomesticRoad400 Open MarketCopy of Linkage
(30.)4-amino-6 tert-butyl-3 mercepto96Tons per AnnumDomesticRoad400 Open MarketCopy of Linkage
(31.)Glycine16.8Tons per AnnumDomesticRoad600 Open MarketCopy of Linkage
(32.)Toluene144Tons per AnnumDomesticRoad600 Open MarketCopy of Linkage
(33.)D M C144Tons per AnnumDomesticRoad600 Open MarketCopy of Linkage
(34.)Hexane60Tons per AnnumDomesticRoad450 Open MarketCopy of Linkage
(35.)5-amino-3-cyno-1-(2,6-dichloro-4-trifluoro methyl phenyl)-1H-pyrazole14.4Tons per AnnumDomesticRoad300 Open MarketCopy of Linkage
(36.)4-DMAP0.6Tons per AnnumDomesticRoad500 Open MarketCopy of Linkage
(37.)ammonia solution0.6Tons per AnnumDomesticRoad400 Open MarketCopy of Linkage
(38.)Chloromethyl Pyridine13.2Tons per AnnumDomesticRoad500 Open MarketCopy of Linkage
(39.)Sodium hypochlorite1.2Tons per AnnumDomesticRoad500 Open MarketCopy of Linkage
(40.)M T H Acid7.56Tons per AnnumDomesticRoad700 Open MarketCopy of Linkage
(41.)Thiourea7.2Tons per AnnumDomesticRoad700 Open MarketCopy of Linkage
(42.)Dimethyl Sulphate6.0Tons per AnnumDomesticRoad400 Open MarketCopy of Linkage
(43.)Sulfuric Acid60Tons per AnnumDomesticRoad600 Open MarketCopy of Linkage
(44.)Sodium Carbonate4.8Tons per AnnumDomesticRoad580 Open MarketCopy of Linkage
(45.)o-xylene60Tons per AnnumDomesticRoad600 Open MarketCopy of Linkage
(46.)Imidazole48Tons per AnnumDomesticRoad500 Open MarketCopy of Linkage
(47.)potassium dichromate4.8Tons per AnnumDomesticRoad600 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 15 Mar 2017 To 15 Jun 2017
(b)Season Pre-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)SO2Micro Gram per Meter Cube12.84.89.580
(2.)PM10Micro Gram per Meter Cube883970100
(3.)PM2.5Micro Gram per Meter Cube52184060
(4.)NOxMicro Gram per Meter Cube18.68.213.580
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TSSmg/l20.800
(2.)Heavy MetalsMercurymg/l0.0010.0010.010.05
(3.)Fluoridemg/l0.340.1811.5
(4.)Chloridesmg/l210262501000
(5.)pHNA7.807.1088
(6.)TDSmg/l8564785002000
(7.)Total Hardnessmg/l308220200600
    14.3.     No. of Surface Water monitoring locations : 0
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l00C
(2.)CODmg/l00C
(3.)pHNA00C
(4.)BODmg/l00C
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))72.651.655-75
(2.)Leq(Night)A-weighted decibels(dB(A))66.541.345-70
    14.5.     No. of Soil Sample Monitored locations : 6
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pHOthersNA7.607.45
(2.)P(Phosphorus)Kilogram per hectare18.515.7
(3.)K(Potassium)Kilogram per hectare165.7106.6
(4.)N(Nitrogen)Kilogram per hectare325.4286.5
(5.)Electric ConductivityMillisiemens per Centimetre439.6328.7
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 11.25 To 4.26
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 11.34 To 4.74
(c)Whether Ground Water Intersection will be there ? NA
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater100.1 Not Appliacble PipelineTube Well21-4/6162/UP/IND/201801 Oct 201810
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic0.251Soak PitGreen Belt Renewal Plant0.25
(2.)Process2.56To ETPReuse within the Plant & Recycling2.5
(3.)Boiler0.756To ETPReuse within the Plant & Recycling0.75
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 3.5
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 3.5
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Discarded ContainerHazardous Waste (as per Hazardous and Other Waste Management rules 2016)4Tons80RoadTreatment, Storage and Disposal Facility(TSDF)
(2.)Process WasteIndustrial Waste0.5Tons80RoadTreatment, Storage and Disposal Facility(TSDF)
(3.)Discarded bag/linersHazardous Waste (as per Hazardous and Other Waste Management rules 2016)4Tons80RoadTreatment, Storage and Disposal Facility(TSDF)
(4.)ETP SludgeHazardous Waste (as per Hazardous and Other Waste Management rules 2016)6Tons80RoadTreatment, Storage and Disposal Facility(TSDF)
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)Others(Specify)NH3Microgram per Meter Cube291.20.20129.201400
(2.)PM10Microgram per Meter Cube721.50.15272.152100
(3.)SO2Microgram per Meter Cube9.51.50.4089.90880
(4.)NOxMicrogram per Meter Cube13.51.50.40813.90880
(5.)PM2.5Microgram per Meter Cube521.50.15252.15260
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)BoilerAgrowaste303PM100.11
(2.)Process StackLDO100.2OthersHCl0.02
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 150
(b)Source UPVVNL
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 110
(e)Stack Height (in m) 15
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0.48
(c)Government Land (ha.) 00
(d)Revenue Land (ha.) 00
(e)Other Land (ha.) 00
    Total Land (ha.) 0.48
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 00
(b)Waste/Barren Land (ha.) 00
(c)Grazing/ Community Land (ha.) 00
(d)Surface Water Bodies (ha.) 00
(e)Settlements (ha.) 00
(f)Industrial (ha.) 0.48
(g)Forest (ha.) 00
(h)Mangroves (ha.) 00
(i)Marine Area (ha.) 00
(j)Others (ha.) : No 00
    Total (ha.) 0.48
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant0.48
Total (ha.) 0.48
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNONE00Not applicable
(2.)WLSNONE00Not applicable
(3.)ESZsNONE00Not applicable
(4.)CorridorsNONE00Not applicable
(5.)Wildlife CorridorsNONE00Not applicable
(6.)NPANONE00Not applicable
(7.)ESAsNONE00Not applicable
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNone00Not Applicable
(2.)Archaeological SitesNone00Not Applicable
(3.)Defence InstallationsNone00Not Applicable
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 00
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0.48
(b)Land yet to be acquired(Ha) 00
(c)Status of Land acquisition if not acquired Not applicable
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 00
(b)No. of Households 00
(c)No. of PDFs (Project Displaced Families) 00
(d)No. of PAFs (Project Affected Families) 00
(e)Funds Allocated for R&R(in INR) (in Lacs) 00
(f)Status of R&R Yet To Start
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 10
(b)Permanent Employment-During Operation 25
(c)Temporary Employment- During Construction 10
(d)Temporary Employment- During Operation 5
(e)No. of working days 330
(f)Total Manpower 50
32.
Green Belt in Ha:
(a)Total Area of Green Belt 0.16
(b)Percentage of Total Project Area 33.33
(c)No. of Plants to be Planted 120
(d)Funds Allocated for Plantation 2.58
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)Environmentalgreen belt developement
(2.)FinancialIncreased revenue to the state by way of royalty, taxes and duties;
(3.)SocialEmployment generation
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/SA070
(ii)Name of the EIA Consultant EQMS INDIA PVT LTD
(iii)Address 304-305, 3rd Floor, Plot No. 16, Rishabh Corporate Tower, Community Centre, Karkardooma, Delhi – 110092
(iv)Mobile No. 9810297612
(v)Landline No. 0113000320
(vi)Email Id eqms@eqmsindia.org
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 23 May 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NA- Proposal has been submitted without any covering letter. - Column 15 of Form-2 mentions about ground water requirement of 10 cum/day. Whether any application has been submitted to the concerned regulatory authority for the required permission in this regard. - Whether all the proposed products/pesticides are permitted by CIB for manufacturing in the country vis-a-vis their LD50 values. 15 Dec 2018
2.NAThe correction have been made as per the instruction received 14 Jan 2019
3.NAPlease mention LD50 values for each of the products (12 nos) proposed to be manufactured. 20 Jan 2019
4.NAThe correction have been made as per the instruction received 06 Feb 2019
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterADS Reply dated 17.05.2019 03 Jun 2019
2.NA

Deferred

17 May 2019
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantRAJPAL SINGH
DesignationDirector
Name of Company (Applicant Name should not be given here)M/S SAMRADHI CROP CHEMICAL PVT LTD
AddressPlot no. HD 20,21,22 & Plot no. HE-27,28,29 & 30, UPSIDC Industrial Area, Sikandrabad,Dist. Bulandshahr, UP
Print