EC Report
1.
Project Details
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? :
No
1.
Project Details
i. Proposal No. :
IA/UP/IND2/27109/2012
ii. MoEFCC File No. :
J-11011/1100/2007-IA
iii.Short narrative of the project:
Residue Upgradation and Distillate Yield Improvement Project with 11.0 MMTPA Crude Processing at Mat
iv. Project Sector :
Industrial Projects-2
v. Company/Proponent :
INDIAN OIL CORPORATION LIMITED (IOCL)
vi.Details of State of the project
Details of State of the project
S.no.
State Name
District Name
Tehsil Name
1.
Uttar Pradesh
Mathura
Mathura
vii. Uploaded EC Compliance report by rigional office of MoEFCC:
NIL
viii. Certified Monitoring report by RoMoEF:
Annexure-Uploaded Monitoring report
ix.Date of TOR Granted
01 Jan 1900
ix.Date of Submission for EC:
12 Mar 2015
x.Project Type:
Expansion
2.
Uploaded Documents of EIA/EMP,Risk Assessment,Public Hearing etc.
i.EIA/EMP:
Annexure-EIA/EMP
ii.Risk Assessment:
Annexure-Risk Assessment
iii.Public Hearing:
Annexure-Public Hearing
iv. Date of Public Hearing:
23 Dec 2013
v. Uploaded Additional Report/Study/Document as desired by Ministry/EAC:
None
vi. Uploaded Cover Letter:
Annexure-Cover Letter
vii.Remarks:
THE PROJECT IS UNDER EC CONSIDERATION. DOCUMENTS-EIA, RRA, PH VIDEO ETC) ARE ALREADY SUBMITTED DTD 05.02.2014 TO MoEF. ADDITIONAL REPORT ALSO SUBMITTED IN SEPT'14. ANOTHER ADDITIONAL REPORT IS SUBMITT
3.
Additional Detail Sought
Additional Detail Sought
Sno.
ADS Letter
Remarks
Date of ADS
1.
NA
The project was considered in 38th EAC Meeting held during 20-21st April, 2015. The Committee desired following additional information: 1 One month data for Methane and non-methane to be reanalyzed from reputed monitoring Organization. The above information shall be provided through online for further consideration.
28 May 2015
2.
ADS Letter
Dear Sir, In compliance to the addtional information sought by committee, enclosed herewith the hydrocabon survey report. For your kind persual please. Regards IOCL, Mathura Refinery
29 Jun 2015
3.
ADS Letter
PP needs to submit the comments from TTZ Authority, Agara.
07 Nov 2016
4.
ADS Letter
This is in reference to ADS letter dated 9th May'16 ( uploaded at MoEF&CC site on 7th Nov'16) addressed to Vice Chairman & Member Convenor, TTZ for their views / comments on the subject project. Comments vide TTZ letter dated 24/12/2016 is enclosed.
26 Dec 2016
4.
Accredited Consultant Details
i. Accreditation status :
Yes
ii. Accreditation No. :
43/2014
iii. Name of Consultant:
Engineers India Limited
iv. Address :
Mr. R.B.Bhutda Engineers India Limited, Tower-II, IVth Floor, Sec-16,On NH-8, Gurgaon-122001,Haryana
v. Mobile No.:
9818688520
vi. Landline No.:
1243803508
vii. Email Id:
rb.bhutda@eil.co.in
5.
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.
i. Name of Applicant :
I B
ii. Designation :
CHIEF MANAGER (HSE)
iii. Name of Company(Applicant Name should not be given here) :
INDIAN OIL CORPORATION LIMITED (IOCL)
iv. Address :
MATHURA RFFINERY MATHURA UTTAR PRADESH
v. Uploaded copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
NIL