1. Project Details
   Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? : No
1. Project Details
   i. Proposal No. : IA/UP/IND2/27109/2012    ii. MoEFCC File No. : J-11011/1100/2007-IA    iii.Short narrative of the project: Residue Upgradation and Distillate Yield Improvement Project with 11.0 MMTPA Crude Processing at Mat    iv. Project Sector : Industrial Projects-2    v. Company/Proponent : INDIAN OIL CORPORATION LIMITED (IOCL)
  vi.Details of State of the project
Details of State of the project
S.no. State Name District Name Tehsil Name
1.Uttar PradeshMathuraMathura
 
vii. Uploaded EC Compliance report by rigional office of MoEFCC: NIL viii. Certified Monitoring report by RoMoEF: Annexure-Uploaded Monitoring report    ix.Date of TOR Granted 01 Jan 1900 ix.Date of Submission for EC: 12 Mar 2015 x.Project Type: Expansion
2. Uploaded Documents of EIA/EMP,Risk Assessment,Public Hearing etc.
i.EIA/EMP: Annexure-EIA/EMP ii.Risk Assessment: Annexure-Risk Assessment iii.Public Hearing: Annexure-Public Hearing    iv. Date of Public Hearing: 23 Dec 2013   v. Uploaded Additional Report/Study/Document as desired by Ministry/EAC: None   vi. Uploaded Cover Letter: Annexure-Cover Letter   vii.Remarks: THE PROJECT IS UNDER EC CONSIDERATION. DOCUMENTS-EIA, RRA, PH VIDEO ETC) ARE ALREADY SUBMITTED DTD 05.02.2014 TO MoEF. ADDITIONAL REPORT ALSO SUBMITTED IN SEPT'14. ANOTHER ADDITIONAL REPORT IS SUBMITT
3. Additional Detail Sought
Additional Detail Sought
Sno. ADS Letter Remarks Date of ADS
1.NAThe project was considered in 38th EAC Meeting held during 20-21st April, 2015. The Committee desired following additional information: 1 One month data for Methane and non-methane to be reanalyzed from reputed monitoring Organization. The above information shall be provided through online for further consideration. 28 May 2015
2. ADS LetterDear Sir, In compliance to the addtional information sought by committee, enclosed herewith the hydrocabon survey report. For your kind persual please. Regards IOCL, Mathura Refinery 29 Jun 2015
3. ADS LetterPP needs to submit the comments from TTZ Authority, Agara. 07 Nov 2016
4. ADS LetterThis is in reference to ADS letter dated 9th May'16 ( uploaded at MoEF&CC site on 7th Nov'16) addressed to Vice Chairman & Member Convenor, TTZ for their views / comments on the subject project. Comments vide TTZ letter dated 24/12/2016 is enclosed. 26 Dec 2016
4. Accredited Consultant Details
   i. Accreditation status : Yes    ii. Accreditation No. : 43/2014    iii. Name of Consultant: Engineers India Limited   iv. Address : Mr. R.B.Bhutda Engineers India Limited, Tower-II, IVth Floor, Sec-16,On NH-8, Gurgaon-122001,Haryana   v. Mobile No.: 9818688520   vi. Landline No.: 1243803508   vii. Email Id: rb.bhutda@eil.co.in
5. Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.
   i. Name of Applicant : I B    ii. Designation : CHIEF MANAGER (HSE)    iii. Name of Company(Applicant Name should not be given here) : INDIAN OIL CORPORATION LIMITED (IOCL)    iv. Address : MATHURA RFFINERY MATHURA UTTAR PRADESH v. Uploaded copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency: NIL