Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Expansion of Total Production Capacity and Augmentation of Integrating Melting and Rolling Facility
(b)Name of the Company / Organisation KUNDLAS LOH UDYOG
(c)Registered Address Vill: Baliana, Post: Barotiwala, Tehsil: Baddi,,Solan,Himachal Pradesh-141001
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Rajeev Singla
(b)Designation (Owner/ Partner/ CEO) Partner
(c)Address Vill- Baliana, Post-Barotiwala, Tehsil-Baddi, Dist-Solan, HP,,Baddi,Solan,Himachal Pradesh-141001
(d)Pin code 141001
(e)E-mail kundlaslohudyog123@gmail.com
(f)STD Code. 9816(f)Telephone No. 666000
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity3(a) Metallurgical industries (ferrous & non ferrous)
Minor Activity
(b)Category A
(c)Proposal Number IA/HP/IND/87362/2017
(d)Master Proposal Number(Single Window) SW/87327/2018
(e)EAC concerned (for category A Projects only) Industrial Projects - 1
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 414, 415, 416, 418, 133
(b)Pincode 141001
(c)Bounded Latitudes (North)
From
Degree 30.91618
Minutes
Second
From
Degree 30.91652
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 76.83292
Minutes
Second
From
Degree 76.83297
Minutes
Second
(e)Survey of India Topo Sheet No. 53B13
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 447
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 10
(j)Seismic Zone 4
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Himachal Pradesh
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number J-11011/350/(2017)-IA-II(I)
(b)Date of Apply of TOR 30 Jun 2017
(c)Date of Issue of TOR / Standard ToR 19 Sep 2017
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :02 Jun 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :04 Jul 2018
Distance of Public Hearing Venue from the Proposed Project :1
Mauza Baliana
State :Himachal Pradesh
District :Solan
Tehsil :Baddi
Village :Baliana
100raised issue regarding smoke emission from these kind of iron and steel units and emphasized upon further improvisation in the air pollution control devices asked the consultant regarding the sourceDistrict Magistrate
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Integrated Melting and Rolling facility280 MT/day
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)TMT Bars92500Tons per AnnumRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 23 Sep 2018
(iv)Valid Upto 31 Mar 2021
(v)File No. Vide CC&A No.: No. HPSPCB / PCB-ID15312/8069-71
(vi)Application No. 8069
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 10.27
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.56
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.14
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.07
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? Yes
d)Inter-State boundaries and international boundaries Yes
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 310
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 310
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Billets, Scrap310Tons per AnnumIndiaRoad100 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Oct 2017 To 31 Dec 2017
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)SO2Micro Gram per Meter Cube16.156.2516.0880
(2.)PM10Micro Gram per Meter Cube87.5760.5986.86100
(3.)PM2.5Micro Gram per Meter Cube58.9330.0258.6760
(4.)NOxMicro Gram per Meter Cube33.3417.5533.2580
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Fluoridemg/l0.810.2711.5
(2.)Heavy MetalsZincmg/l0.460.17515
(3.)Chloridesmg/l33.9825.482501000
(4.)pHNA7.847.416.58.5
(5.)TDSmg/l3603365002000
(6.)Total Hardnessmg/l239.81190.87200600
(7.)TSSNA0000
    14.3.     No. of Surface Water monitoring locations : 3
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l6.54.5B
(2.)BODmg/l28.073.28B
(3.)CODmg/l116.1420.74B
(4.)pHNA7.857.71B
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))58.450.6165
(2.)Leq(Day)A-weighted decibels(dB(A))65.0358.375
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)K(Potassium)Kilogram per hectare00
(2.)Electric ConductivityMillisiemens per Centimetre0.160.11
(3.)pHOthersNA7.857.48
(4.)N(Nitrogen)Kilogram per hectare334312
(5.)P(Phosphorus)Kilogram per hectare5.84.5
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 28.76 To 5.01
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 27.57 To 3.02
(c)Whether Ground Water Intersection will be there ? NA
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater650Copy of Permission LettermodeOthersBore wellOthersBore well0031 May 201765
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic effluent88STPGreen Belt Renewal Plant8
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 8
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 8
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Mill ScaleOthersMill Scale3Tons50RoadAuthorized Recyclers
(2.)Industrial wasteOthersAPCD Dust800Kilolitre50RoadTreatment, Storage and Disposal Facility(TSDF)
(3.)Industrial WasteHazardous Waste (as per Hazardous and Other Waste Management rules 2016)400Kilolitre50RoadTreatment, Storage and Disposal Facility(TSDF)
(4.)Solid Hazardous wasteIndustrial Waste20Tons50RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)SO2Microgram per Meter Cube00000
(2.)PM10Microgram per Meter Cube87.571.4141.2388.8100
(3.)PM2.5Microgram per Meter Cube00000
(4.)NOxMicrogram per Meter Cube00000
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)FurnaceInduction Heating300.45PM1088.8
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 11000
(b)Source HPSEB
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 2x125 KVA
(e)Stack Height (in m) 8
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0.78
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 0.78
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 8065
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 80
(e)Settlements (ha.) 3320
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Hill, forest and scrub 19945
    Total (ha.) 31410
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant0.3108Plant area
(2.)Green belt0.26
(3.)OthersOpen area0.21
Total (ha.) 0.7808
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Wildlife CorridorsNone0NA
(2.)ESAsNone0NA
(3.)NPANone0NA
(4.)Critically Polluted Area00NA
(5.)CorridorsNone0NA
(6.)WLSNone0NA
(7.)ESZsNone0NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Defence InstallationsNone0NA
(2.)ForestNone0NA
(3.)Archaeological SitesNone0NA
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0.78
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Sirsa , Siswan
(ii)Direction of Water Bodies in Buffer Area North East
(iii)Distance of Water Bodies in Buffer Area 8
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 27
(b)Permanent Employment-During Operation 27
(c)Temporary Employment- During Construction 134
(d)Temporary Employment- During Operation 133
(e)No. of working days 330
(f)Total Manpower 321
32.
Green Belt in Ha:
(a)Total Area of Green Belt 0.26
(b)Percentage of Total Project Area 33.33
(c)No. of Plants to be Planted 300
(d)Funds Allocated for Plantation 5
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialThe project will create extra opportunities of direct and indirect employment for which skilled and unskilled manpower will be needed
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 1
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA0040
(ii)Name of the EIA Consultant Shivalik Solid Waste Management Limited
(iii)Address SCO 20-21, II floor, Near Hotel Dolphin, Baltana, Zirakpur (Punjab) 140 604
(iv)Mobile No. 8288079363
(v)Landline No. 0176250949
(vi)Email Id infoshivalikeia@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 1
(ix)Validity of Accreditation 16 Feb 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAMay kindly refer to the Form-2 and EIA/EMP submitted, it is observed following shortcomings: 1. Compliance status of consent to Operate from the regional office has not been submitted as per the specific ToR point No. (iv) 2. No response was submitted to specific ToR point (v); 3. Green belt programme is not furnished properly; 4. Corporate environment Policy and organisational set up inter alia including the mechanism for reporting of non-compliance/infringements to the board of directors is not in compliance of the ToR prescribed at 9(i), 9(ii), 9(iii) and 9(iv); 5. Technical details of the proposed project was not properly furnished in the chapter-2 of the EIA Report 6. Pollution control measures proposed are generic in nature. Kindly furnish the pollution control measures specific to the project along with the capacity and design if required. 17 Dec 2018
2.NAMay kindly refer to the Form-2 and EIA/EMP submitted, it is observed following shortcomings: 1. Compliance status of consent to Operate from the regional office has not been submitted as per the specific ToR point No. (iv) 2. No response was submitted to specific ToR point (v); 3. Green belt programme is not furnished properly; 4. Corporate environment Policy and organisational set up inter alia including the mechanism for reporting of non-compliance/infringements to the board of directors is not in compliance of the ToR prescribed at 9(i), 9(ii), 9(iii) and 9(iv); 5. Technical details of the proposed project was not properly furnished in the chapter-2 of the EIA Report 6. Pollution control measures proposed are generic in nature. Kindly furnish the pollution control measures specific to the project along with the capacity and design if required. 17 Dec 2018
3.NAThe correction have been made as per the instruction received 02 Jan 2019
4.NAFollowing shortcomings have been observed. 1. Compliance status of consent to Operate from the regional office of SPCB has not been submitted as per the specific ToR point No. (iv) 2. Technical details of the proposed project has not been furnished. 3. Social impact assessment has not conducted as per the specific ToR point iii. 3. Proper social impact ass was not properly furnished in the chapter-2 of the EIA Report 6. Pollution control measures proposed are generic in nature. Kindly furnish the pollution control measures specific to the project along with the capacity and design if required. 23 Jan 2019
5.NAThe correction have been made as per the instruction received 06 Feb 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantRajeev Singla
DesignationPartner
Name of Company (Applicant Name should not be given here)KUNDLAS LOH UDYOG
AddressVill: Baliana, Post: Barotiwala, Tehsil: Baddi
Print