Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Capacity Enhancement by Installation of four Induction Furnaces of 15 MT each in existing plant premises of M/s J.B. Rolling Mills Limited at Trilokpur Road Kala Amb, village Johran, Tehsil Nahan and
(b)Name of the Company / Organisation J B ROLLING MILLS PVT LTD
(c)Registered Address Trilokpur Road, Kala Amb, Village Johran, Tehsil Nahan & District Sirmaur,,Sirmaur,Himachal Pradesh-173030
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Surender Jain
(b)Designation (Owner/ Partner/ CEO) Director
(c)Address Trilokpur Road, Kala Amb, Village Johran, Tehsil Nahan & District Sirmaur,,Nahan(T),Sirmaur,Himachal Pradesh-173030
(d)Pin code 173030
(e)E-mail works@jaibharatsteel.com
(f)STD Code. 1702(f)Telephone No. 238924
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity3(a) Metallurgical industries (ferrous & non ferrous)
Minor Activity
(b)Category A
(c)Proposal Number IA/HP/IND/86898/2015
(d)Master Proposal Number(Single Window) SW/86882/2018
(e)EAC concerned (for category A Projects only) Industrial Projects - 1
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 110/129, 138/157, 101/120
(b)Pincode 173030
(c)Bounded Latitudes (North)
From
Degree 30.51727
Minutes
Second
From
Degree 30.51879
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 77.19704
Minutes
Second
From
Degree 77.20055
Minutes
Second
(e)Survey of India Topo Sheet No. H43L2
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 350
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0
(j)Seismic Zone 4
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Himachal Pradesh
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number J-11011/218/2015-IA(I)
(b)Date of Apply of TOR 28 Oct 2015
(c)Date of Issue of TOR / Standard ToR 03 Dec 2015
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :13 May 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :18 Jun 2018
Distance of Public Hearing Venue from the Proposed Project :0
Project Site
State :Himachal Pradesh
District :Sirmaur
Tehsil :Nahan(T)
Village :Johran
571. On Pollution Control Measures 2. Employment Generation 3. Providing Health FacilityDistrict Collector
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Induction Furnace4 Nos- Gross Capacity 60 MT/heatAfter capacity enhancement
(2.)Installed Production capacity780 MT/dayAfter capacity enhancement
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)TMT bars, Angles, Channels, Girders336000Tons per AnnumRail
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 21 Sep 2018
(iv)Valid Upto 31 Mar 2021
(v)File No. HSPCB/PCB-ID10243/7219-19
(vi)Application No. HSPCB/PCB-ID10243/7219-19
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 120.91
(b) Funds Allocated for Environment Management (Capital) (in Crores) 2.35
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 1.14
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.7
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? Yes
d)Inter-State boundaries and international boundaries Yes
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 375910
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 375910
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Billets111360Tons per AnnumIndiaRoad35 Open MarketCopy of Linkage
(2.)Ferro Alloys4550Tons per AnnumIndiaRoad35 Open MarketCopy of Linkage
(3.)MS Scrap260000Tons per AnnumIndiaRoad30 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Dec 2015 To 29 Feb 2016
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 10
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)SO2Micro Gram per Meter Cube19.904.1019.4480
(2.)NOxMicro Gram per Meter Cube29.8015.1029.6680
(3.)PM10Micro Gram per Meter Cube88.7058.1088.47100
(4.)PM2.5Micro Gram per Meter Cube48.9022.5048.8560
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA8.557.156.58.5
(2.)Fluoridemg/l0011.5
(3.)Heavy MetalsZincmg/l0.380.02515
(4.)TDSmg/l348175002000
(5.)TSSmg/l0000
(6.)Total Hardnessmg/l61221200600
(7.)Chloridesmg/l120102501000
    14.3.     No. of Surface Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA8.27.52A
(2.)DOmg/l10.810.2A
(3.)BODmg/l3.40.7A
(4.)CODmg/l4.54A
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))65.2747.5275
(2.)Leq(Night)A-weighted decibels(dB(A))54.8542.1870
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pHOthersNA9.167.24
(2.)N(Nitrogen)Percent0.740.29
(3.)Electric ConductivityOthersmmhos/cm1.5150.043
(4.)P(Phosphorus)Othersmg/100gm0.380.21
(5.)K(Potassium)Othersmg/100gm1.91.2
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 3.76 To 43.98
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 2.98 To 37.35
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersIndustrial Area Development Authority, Kala Amb283Copy of Permission LetterPipelineOthersPipelineIND/SWCA/KA/MIsc/-110201 Nov 201828
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic waste4.25Septic Tank followed by soak PitGreen Belt Renewal Plant4.2
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 4.2
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 4.2
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)SlagIndustrial Waste26000Tons90RoadTreatment, Storage and Disposal Facility(TSDF)
(2.)APCD DustIndustrial Waste795Tons90RoadTreatment, Storage and Disposal Facility(TSDF)
(3.)Trimming & Cutting LossIndustrial Waste13440Tons0Othersinside the plantOthersused as raw material
(4.)Spent LubricantHazardous Waste (as per Hazardous and Other Waste Management rules 2016)80Tons40RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube88.7001.3414990.04149100
(2.)NOxMicrogram per Meter Cube29.800029.8080
(3.)SO2Microgram per Meter Cube19.900019.9080
(4.)PM2.5Microgram per Meter Cube42.800042.8060
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)D.G. SetHSD30.4PM1052
(2.)stack attached with Induction FurnaceNA300.75PM1076
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 24344
(b)Source Himachal Pradesh State Electricity Board Ltd.
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 500
(e)Stack Height (in m) 4
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 5.96
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 5.96
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 8045.36
(b)Waste/Barren Land (ha.) 5020.3
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 1937.3
(e)Settlements (ha.) 1613.24
(f)Industrial (ha.) 0
(g)Forest (ha.) 14799.3
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : NA 0
    Total (ha.) 31415.5
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Green belt2.0
(2.)Main Plant2.2
(3.)Otherspaved area1.76
Total (ha.) 5.96
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSNA0NA
(2.)NPANA0NA
(3.)ESAsNA0NA
(4.)Wildlife CorridorsNA0NA
(5.)ESZsNA0NA
(6.)Critically Polluted AreaNA0NA
(7.)CorridorsNA0NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Defence InstallationsNA0NA
(2.)ForestAndheri Gurudwara RF1.4NA
(3.)Archaeological SitesNA0NA
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 5.96
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Completed
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Markanda River
(ii)Direction of Water Bodies in Buffer Area South East
(iii)Distance of Water Bodies in Buffer Area 2.6
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 60
(c)Temporary Employment- During Construction 32
(d)Temporary Employment- During Operation 40
(e)No. of working days 300
(f)Total Manpower 132
32.
Green Belt in Ha:
(a)Total Area of Green Belt 2.00
(b)Percentage of Total Project Area 33.56
(c)No. of Plants to be Planted 4000
(d)Funds Allocated for Plantation 1500000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialLocal villagers of the project will get its benefits more by giving preference to them in relation to direct employment associated with the various project activities. Construction and operation phase of the proposed replacement project will involve a certain number of laborers, contractors and construction workers. With the implementation of the proposed expansion plant, the increasing industrial activity will boost up the commercial and economic status of the locality, to some extent the socio
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 1
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA 0040
(ii)Name of the EIA Consultant Shivalik Solid Waste Management Ltd
(iii)Address SCO-20-21, Dhakoli, Baltana, Kalka Shimla Highway, Near Hotel Dolphin,
(iv)Mobile No. 9876145015
(v)Landline No. 0176250979
(vi)Email Id s.brahma@beil.co.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 1
(ix)Validity of Accreditation 19 Feb 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterReply to ADS dated 18/05/2019 environment clearance regarding 27 Jun 2019
2.NA• Compliance status to the conditions stipulated in the Consent to Operate from SPCB has not been furnished. 18 May 2019
3. ADS Reply LetterCapacity Enhancement by Installation of two Induction Furnaces of 30 MT each in existing plant premises of M/s J.B. Rolling Mills Limited at Trilokpur Road Kala Amb, village Johran, Tehsil Nahan, Trilokpur Road, Kala Amb, Village Johran, Tehsil Nahan& District Sirmaur, Sirmaur, Himachal Pradesh- Reply to ADS environment clearance regarding Reference:- Proposal No.- IA/HP/IND/ 86898/2015 and F.No. J-11011/218/2015- IA-II(I) 2nd meeting of the Re-constituted EAC (Industry-I) held during 12th December, 2018 at item no.2.18 15 Mar 2019
4.NAIn view of the above, the Committee advised the project proponent to submit revised EIA/EMP incorporating quantitative and project specific details and also addressing the suitable replies to the Terms of References prescribed after validating baseline data by collecting one-month data afresh. The proposal is deferred for additional information 13 Dec 2018
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantSurender Jain
DesignationDirector
Name of Company (Applicant Name should not be given here)J B ROLLING MILLS PVT LTD
AddressTrilokpur Road, Kala Amb, Village Johran, Tehsil Nahan & District Sirmaur