|
1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Capacity Enhancement by Installation of four Induction Furnaces of 15 MT each in existing plant premises of M/s J.B. Rolling Mills Limited at Trilokpur Road Kala Amb, village Johran, Tehsil Nahan and | (b)Name of the Company / Organisation | J B ROLLING MILLS PVT LTD | (c)Registered Address | Trilokpur Road, Kala Amb, Village Johran, Tehsil Nahan & District Sirmaur,,Sirmaur,Himachal Pradesh-173030 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Surender Jain | (b)Designation (Owner/ Partner/ CEO) | Director | (c)Address | Trilokpur Road, Kala Amb, Village Johran, Tehsil Nahan & District Sirmaur,,Nahan(T),Sirmaur,Himachal Pradesh-173030 | (d)Pin code | 173030 | (e)E-mail | works@jaibharatsteel.com | (f)STD Code. | 1702(f)Telephone No. | 238924 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 3(a) Metallurgical industries (ferrous & non ferrous)
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/HP/IND/86898/2015 | (d)Master Proposal Number(Single Window) | SW/86882/2018 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 1 | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | 110/129, 138/157, 101/120 | (b)Pincode | 173030 | (c)Bounded Latitudes (North) | | From | | Degree | 30.51727 | Minutes | | Second | | From | | Degree | 30.51879 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 77.19704 | Minutes | | Second | | From | | Degree | 77.20055 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | H43L2 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 350 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 0 | (j)Seismic Zone | 4 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Himachal Pradesh | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR): | (a)MoEF&CC / SEIAA File Number | J-11011/218/2015-IA(I) | (b)Date of Apply of TOR | 28 Oct 2015 | (c)Date of Issue of TOR / Standard ToR | 03 Dec 2015 | (d)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 18 Jun 2018 | Distance of Public Hearing Venue from the Proposed Project : | 0 |
| Project Site | State : | Himachal Pradesh | District : | Sirmaur | Tehsil : | Nahan(T) | Village : | Johran |
| 57 | 1. On Pollution Control Measures
2. Employment Generation
3. Providing Health Facility | District Collector | | |
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | Induction Furnace | 4 Nos- Gross Capacity 60 MT/heat | After capacity enhancement | (2.) | Installed Production capacity | 780 MT/day | After capacity enhancement | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | TMT bars, Angles, Channels, Girders | 336000 | Tons per Annum | | Rail | | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 21 Sep 2018 | (iv)Valid Upto | 31 Mar 2021 | (v)File No. | HSPCB/PCB-ID10243/7219-19 | (vi)Application No. | HSPCB/PCB-ID10243/7219-19 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 120.91 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 2.35 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 1.14 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.7 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | Yes | d)Inter-State boundaries and international boundaries | Yes | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 375910 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 375910 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Billets | 111360 | Tons per Annum | | India | Road | | 35 | Open Market | | Copy of Linkage | (2.) | Ferro Alloys | 4550 | Tons per Annum | | India | Road | | 35 | Open Market | | Copy of Linkage | (3.) | MS Scrap | 260000 | Tons per Annum | | India | Road | | 30 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Dec 2015 To 29 Feb 2016 | (b)Season | Winter | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 10 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | SO2 | | Micro Gram per Meter Cube | 19.90 | 4.10 | 19.44 | 80 | (2.) | NOx | | Micro Gram per Meter Cube | 29.80 | 15.10 | 29.66 | 80 | (3.) | PM10 | | Micro Gram per Meter Cube | 88.70 | 58.10 | 88.47 | 100 | (4.) | PM2.5 | | Micro Gram per Meter Cube | 48.90 | 22.50 | 48.85 | 60 | |
14.2. No. of Ground Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | pH | | | NA | | 8.55 | 7.15 | 6.5 | 8.5 | (2.) | Fluoride | | | mg/l | | 0 | 0 | 1 | 1.5 | (3.) | Heavy Metals | | Zinc | mg/l | | 0.38 | 0.02 | 5 | 15 | (4.) | TDS | | | mg/l | | 348 | 17 | 500 | 2000 | (5.) | TSS | | | mg/l | | 0 | 0 | 0 | 0 | (6.) | Total Hardness | | | mg/l | | 612 | 21 | 200 | 600 | (7.) | Chlorides | | | mg/l | | 120 | 10 | 250 | 1000 | |
14.3. No. of Surface Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | NA | | 8.2 | 7.52 | A | (2.) | DO | | mg/l | | 10.8 | 10.2 | A | (3.) | BOD | | mg/l | | 3.4 | 0.7 | A | (4.) | COD | | mg/l | | 4.5 | 4 | A | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 65.27 | 47.52 | 75 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 54.85 | 42.18 | 70 | |
14.5. No. of Soil Sample Monitored locations : 8 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | Others | NA | 9.16 | 7.24 | (2.) | N(Nitrogen) | Percent | | 0.74 | 0.29 | (3.) | Electric Conductivity | Others | mmhos/cm | 1.515 | 0.043 | (4.) | P(Phosphorus) | Others | mg/100gm | 0.38 | 0.21 | (5.) | K(Potassium) | Others | mg/100gm | 1.9 | 1.2 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 3.76 To 43.98 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 2.98 To 37.35 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | Industrial Area Development Authority, Kala Amb | 28 | 3 | Copy of Permission Letter | Pipeline | | Others | Pipeline | IND/SWCA/KA/MIsc/-1102 | 01 Nov 2018 | 28 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Domestic waste | 4.2 | 5 | Septic Tank followed by soak Pit | Green Belt Renewal Plant | | 4.2 | | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 4.2 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 4.2 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Slag | Industrial Waste | | 26000 | Tons | 90 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (2.) | APCD Dust | Industrial Waste | | 795 | Tons | 90 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (3.) | Trimming & Cutting Loss | Industrial Waste | | 13440 | Tons | 0 | Others | inside the plant | Others | used as raw material | (4.) | Spent Lubricant | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 80 | Tons | 40 | Road | | Authorized Recyclers | | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 88.70 | 0 | 1.34149 | 90.04149 | 100 | (2.) | NOx | | Microgram per Meter Cube | 29.80 | 0 | 0 | 29.80 | 80 | (3.) | SO2 | | Microgram per Meter Cube | 19.90 | 0 | 0 | 19.90 | 80 | (4.) | PM2.5 | | Microgram per Meter Cube | 42.80 | 0 | 0 | 42.80 | 60 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | D.G. Set | HSD | 3 | 0.4 | PM10 | | 52 | (2.) | stack attached with Induction Furnace | NA | 30 | 0.75 | PM10 | | 76 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 24344 | (b)Source | Himachal Pradesh State Electricity Board Ltd. | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | 500 | (e)Stack Height (in m) | 4 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 5.96 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 5.96 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 8045.36 | (b)Waste/Barren Land (ha.) | 5020.3 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 1937.3 | (e)Settlements (ha.) | 1613.24 | (f)Industrial (ha.) | 0 | (g)Forest (ha.) | 14799.3 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : NA | 0 | Total (ha.) | 31415.5 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Green belt | | 2.0 | | (2.) | Main Plant | | 2.2 | | (3.) | Others | paved area | 1.76 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | WLS | NA | 0 | NA | (2.) | NPA | NA | 0 | NA | (3.) | ESAs | NA | 0 | NA | (4.) | Wildlife Corridors | NA | 0 | NA | (5.) | ESZs | NA | 0 | NA | (6.) | Critically Polluted Area | NA | 0 | NA | (7.) | Corridors | NA | 0 | NA | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Defence Installations | | NA | 0 | NA | (2.) | Forest | | Andheri Gurudwara RF | 1.4 | NA | (3.) | Archaeological Sites | | NA | 0 | NA | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 5.96 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | Completed | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Markanda River | (ii)Direction of Water Bodies in Buffer Area | South East | (iii)Distance of Water Bodies in Buffer Area | 2.6 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 60 | (c)Temporary Employment- During Construction | 32 | (d)Temporary Employment- During Operation | 40 | (e)No. of working days | 300 | (f)Total Manpower | 132 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 2.00 | (b)Percentage of Total Project Area | 33.56 | (c)No. of Plants to be Planted | 4000 | (d)Funds Allocated for Plantation | 1500000 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Social | Local villagers of the project will get its benefits more by giving preference to them in
relation to direct employment associated with the various project activities. Construction
and operation phase of the proposed replacement project will involve a certain number of
laborers, contractors and construction workers.
With the implementation of the proposed expansion plant, the increasing industrial activity
will boost up the commercial and economic status of the locality, to some extent the socio | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 1 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1619/RA 0040 | (ii)Name of the EIA Consultant | Shivalik Solid Waste Management Ltd | (iii)Address | SCO-20-21, Dhakoli, Baltana, Kalka Shimla Highway, Near Hotel Dolphin, | (iv)Mobile No. | 9876145015 | (v)Landline No. | 0176250979 | (vi)Email Id | s.brahma@beil.co.in | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 1 | (ix)Validity of Accreditation | 19 Feb 2019 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought : NIL |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | Reply to ADS dated 18/05/2019 environment clearance regarding | 27 Jun 2019 | 2. | NA | • Compliance status to the conditions stipulated in the Consent to Operate from SPCB has not been furnished. | 18 May 2019 | 3. | ADS Reply Letter | Capacity Enhancement by Installation of two Induction Furnaces of 30 MT each in existing plant premises of M/s J.B. Rolling Mills Limited at Trilokpur Road Kala Amb, village Johran, Tehsil Nahan, Trilokpur Road, Kala Amb, Village Johran, Tehsil Nahan& District Sirmaur, Sirmaur, Himachal Pradesh- Reply to ADS environment clearance regarding
Reference:- Proposal No.- IA/HP/IND/ 86898/2015 and F.No. J-11011/218/2015- IA-II(I)
2nd meeting of the Re-constituted EAC (Industry-I) held during 12th December, 2018 at item no.2.18 | 15 Mar 2019 | 4. | NA | In view of the above, the Committee advised the project proponent to submit revised EIA/EMP incorporating quantitative and project specific details and also addressing the suitable replies to the Terms of References prescribed after validating baseline data by collecting one-month data afresh. The proposal is deferred for additional information | 13 Dec 2018 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Surender Jain | Designation | Director | Name of Company (Applicant Name should not be given here) | J B ROLLING MILLS PVT LTD | Address | Trilokpur Road, Kala Amb, Village Johran, Tehsil Nahan & District Sirmaur |
|